Abstract
This Study aimed at suggesting the plan for accumulating and utilizing schedule information of IFC file in BIM-based delivery system. For this Propose, First, literature review is conducted for analyzing utilization plan of schedule information and the IFC standard. Second, Schedule Planning process is analyzed to draw Schedule elements, and schedule information items is derived by analyzing schedule process and commercial software. Also, schedule elements in the IFC schema is derived by analyzing IFC schema through drawn schedule information. Finally, this study suggests a concept model accumulating and utilizing Schedule information included in IFC schema, and a conceptual delivery process of BIM model by analyzing BIM Application Guideline for Facility Project by PPS (Public Procurement Service) for accumulating IFC delivery files This study will expects to contribute to accumulate information of BIM model at the point of nationally introducing BIM.
본 연구는 BIM 기반의 납품체계에서 IFC 파일의 공정정보를 축적하고 활용하기 위한 방안을 제시하였다. 이를 위해 첫 번째로, 공정정보의 활용방안에 대하여 기존연구를 분석하였고, IFC 표준을 고찰하였다. 두 번째로, 공정요소를 도출하기 위해 공정계획 수립절차를 분석하였으며, 공정프로세스와 상용소프트웨어를 분석하여 공정정보항목을 도출하였다. 또한 도출된 공정정보항목을 기반으로 IFC 스키마를 분석하여 IFC의 공정요소를 도출하였다. 마지막으로 IFC 납품파일의 축적을 위해 조달청의 시설사업 BIM 적용 기본 지침서를 분석하여 개념적인 BIM 모델의 납품프로세스를 통한 축적방법과 활용방안을 제시하였다. 본 연구는 국가적으로 진행되고 있는 BIM 도입과정에서 BIM모델의 정보를 축적하는데 기여할 것으로 기대된다.