참고문헌
- Adler, P. S. and Clark, K. B. (1991). "Behind the learning curve: A sketch of the learning process", Management Science, 37(3), pp. 267-281. https://doi.org/10.1287/mnsc.37.3.267
- Amor, J. P. and Teplitz, C. J. (1998). "An efficient approximation for project composite learning curves", Project Management Journal, 29(3), pp. 28-42.
- Barney, G. C. (2003). Elevator Traffic Handbook: Theory and Practice, Taylor & Francis Routledge.
- Cherrington, J. E., Lippert, S. and Towill, D. R. (1987). "The effect of prior experience on learning curve parameters", International Journal of Production Research, 25(3), pp. 399-411. https://doi.org/10.1080/00207548708919849
- COUTO, J. P. and TEIXEIRA, J. C. (2005). "Using linear model for learning curve effect on highrise floor construction", Construction Management and Economics, 23(4), pp. 355-364. https://doi.org/10.1080/01446190500040505
- Cunningham, J. A. (1980). "Using the learning curve as a management tool", Spectrum, IEEE, 17(6), pp. 45-48.
- Farghal, S. H. and Everett, J. G. (1997). "Learning Crves: Accuracy in Predicting Future Performance", Journal of Construction Engineering and Management, 123(1), pp. 41-45. https://doi.org/10.1061/(ASCE)0733-9364(1997)123:1(41)
- Gates, M. and Scarpa, A. (1972). "Learning and experience curves", Journal of the Construction Division, 98(1), pp. 79-101.
- Hegazy, T. and Kamarah, E. (2008). "Efficient Repetitive Scheduling for High-Rise Construction", Journal of Construction Engineering and Management, 134(4), pp. 253-264. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:4(253)
- Herbsman, Z. and Ellis, R. (1990). "Research of factors influencing construction productivity", Construction Management and Economics, 8(1), pp. 49-61. https://doi.org/10.1080/01446199000000005
- Hijazi, A. M., AbouRizk, S. M. and Halpin, D. W. (1992). "Modeling and Simulating Learning Development in Construction", Journal of Construction Engineering and Management, 118(4), pp. 685-700. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:4(685)
- Hinze, J. and Olbina, S. (2009). "Empirical Analysis of the Learning Curve Principle in Prestressed Concrete Piles", Journal of Construction Engineering and Management, 135(5), pp. 425-431. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000004
- Jarkas, A. (2010). "Critical Investigation into the Applicability of the Learning Curve Theory to Rebar Fixing Labor Productivity", Journal of Construction Engineering and Management, 136(12), pp. 1279-1288. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000236
- Jarkas, A. and Horner, M. (2011). "Revisiting the applicability of learning curve theory to formwork labour productivity", Construction Management and Economics, 29(4), pp. 483-493. https://doi.org/10.1080/01446193.2011.562911
- Jelen, F. C. and Black, J. H. (1983). Cost and optimization engineering, McGraw-Hill, New York.
- Jeon, Y. D. and Lee, J. S. (2001). "A calculation method on the loss of labor productivity due to change order", Proceeding of Korean Institute of Construction Engineering and Management, pp. 295-300.
- Kim, T. W., Lee, H., Park, M. and Yu, J. (2011). "Productivity Management Methodology Using Productivity Achievement Ratio", KSCE Journal of Civil Engineering, 15(1), pp. 23-31. https://doi.org/10.1007/s12205-011-0983-5
- Lee, B., Park, M., Lee, H., and Kim, H. (2012). "Analysis of Applicability of Learning Curve Effect in Construction", Proceeding of Korean Institute of Construction Engineering and Management, pp. 225-226.
- Lee, H. S., Shin, J.W., Park, M. and Ryu, H. G. (2009). "Probabilistic Duration Estimation Model for High-Rise Structural Work", Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000105
- Liberda, M., Ruwanpura, J. and Jergeas, G. (2004). "Construction Productivity Improvement: A Study of Human, management and External Issues", Construction Research Congress, pp. 1-8.
- Lutz, J. D., Halpin, D. W., and Wilson, J. R. (1994). "Simulation of Learning Development in Repetitive Construction", Journal of Construction Engineering and Management, 120(4), pp. 753-773. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:4(753)
- NGUYEN, L. D. and NGUYEN, H. T. (2012). "Relationship between Floor Number and Labor Productivity in Multistory Structural Work: A Case Study", Construction Research Congress, pp. 1520-1529.
- Oglesby, C. H., Parker, H. W. and Howell, G. A. (1989). Productivity Improvement in Construction, McGraw-Hill Inc., New York.
- Park, M., Ha, S., Lee, H., Choi, Y., Kim, H. and Han, S. (2013). "Lifting demand-based zoning for minimizing worker verical transportation time in high-rise building construction", Automation in Construction, 32, pp. 88-95. https://doi.org/10.1016/j.autcon.2013.01.010
- Thomas, H. R. (2009). "Construction Learning Curves", Practice Periodical on Structural Design and Construction, 14(1), pp. 14-20. https://doi.org/10.1061/(ASCE)1084-0680(2009)14:1(14)
- Thomas, H. R., Mathews, C. T. and Ward, J. G. (1986). "Learning Cruve Models of Construction Productivity", Journal of Construction Engineering and Management, 112(2), pp. 245-258. https://doi.org/10.1061/(ASCE)0733-9364(1986)112:2(245)
- United Nations Committee on Housing Building and Planning (1965). Effect of repetition on building operation and processes on site, ST/ECE/HOU/14, United nations, New York.
- Wong, P. S. P., Cheung, S. O. and Hardcastle, C. (2007). "Embodying Learning Effect in Performance Prediction", Journal of Construction Engineering and Management, 133(6), pp. 474-482. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:6(474)
- Wright, T. P. (1936). "Factors Affecting the Cost of Airplanes", Journal of the Aeronautical Sciences, 3(4), pp.122-128. https://doi.org/10.2514/8.155
- Yelle, L. E. (1979). "The Learning Curve: Historical Review and Comprehensive Survey", Decision Sciences, 10(2), pp. 302-28. https://doi.org/10.1111/j.1540-5915.1979.tb00026.x