References
- Reinschmidt K, Trejo D. Economic Value of Building Faster. Journal of Construction Engineering and Management. 2006 Jul; 132(7):759-66. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:7(759)
- Tommelein ID, Riley DR, Howell GA. Parade Game: Impact of Work Flow Variability on Trade Performance. Journal of Construction Engineering and Management. 1999 Sep;125(5):304-10. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:5(304)
- Thomas H, Maloney W, Horner R, Smith G, Handa V, Sanders S. Modeling Construction Labor Productivity. Journal of Construction Engineering and Management. 1990 Dec;116(4):705-26. https://doi.org/10.1061/(ASCE)0733-9364(1990)116:4(705)
- Sanders S, Thomas H. Masonry Productivity Forecasting Model. Journal of Construction Engineering and Management. 1993 Mar;119(1):163-79. https://doi.org/10.1061/(ASCE)0733-9364(1993)119:1(163)
- Oglesby CHP, Henry W, Howell GA. Productivity Improvement in Construction. New York (NY): McGraw-Hill; 1989. 343 p.
- Prokopenko J. Productivity management: A Practical Handbook. Geneva (switzerland): International Labour Organization; 1987. 291. p.
- Kim YS, Cha TS, Hwang KN, Choi YS. A study on the Improvement of Construction Work Efficiency by Work Sampling Technique. Journal of Architectural Institute of Korea. 1997 Jul;13(7):233-41.
- Ahn SH, Yu JH, Kim CD. The Work Condition Management Method for Improvement of Work Efficiency. Journal of Architectural Institute of Korea. 2008 Apr;24(4):183-90.
- Kim TH, Joo JK, Kim SK. Proposal of Plan for the Deck Plate Slab Construction on Productivity Improvement. Journal of Architectural Institute of Korea. 2000 Dec;16(12): 75-82.
- Jung HK, Yun YW, Yang KY. A Study on the Productivity of Form Work by Using Work Analysis Method. Journal of the Korea Institute of Building Construction. 2005 Dec;5(4):131-7. https://doi.org/10.5345/JKIC.2005.5.4.131
- Lee JN, Son CB. An Analysis of Work Ration for Construction Curtain Wall by Work Sampling Technique. Proceeding of Annual Conference; 2003 Oct 24-25; Pukyong National University. Seoul (Korea): Architectural Institute of Korea; 2003. p. 519-22.
- Joo JK, Kim TH, Kim SK. A Work Model for Enhancing the Productivity of Rebar Work. Journal of Architectural Institute of Korea. 2003 Dec;19(12):189-96.
- Jang JS, Shin YS, Kang KI. A Work Process for Productivity Improvement of Concrete Structural Frame Work in Tall Building. Journal of the Korea Institute of Building Construction. 2005 Mar;5(1):161-4. https://doi.org/10.5345/JKIC.2005.5.2.161
- Kim BJ, Shim HW, Lee, UK, Choi HB, Kang KI. Rebar Work Improvement Method using Work Measurement in Apartment Building Construction-Focusing on Work Sampling and Crew Balance Study. Proceeding of Annual Conference; 2006 Oct 26-27; Yeungnam University. Seoul (Korea): Architectural Institute of Korea; 2006. p. 441-4.
- Yoon JY, Kim YS, Kim JJ. Suggestion Improvement Based on Form Work Productivity Analysis in Apartment Housing Construction. Journal of the Korea Institute of Building Construction. 2010 Oct;12(5):49-56. https://doi.org/10.5345/JKIC.2010.10.1.049
- Lee TH, Ko YH, Kim YS, Han SW. Comparison of the Application of Various Productivity Analysis Methods for a Curtain Wall Operation in High-rise Building Construction. Proceeding of Korea Institute of Building Construction; 2011 May 20; Dong-Eui University. Seoul (Korea): the Korea Institute of Building Construction; 2011. p. 211-2.