References
- Birrell GS. Construction planning-beyond critical path. Journal of the Construction Division. 1980 Sep;106(3):389-407.
- Alves TC, Tommelein ID. Buffering and batching practices in the HVAC industry. Proceedings of the 11th Annual Conference of the International Group for Lean Construction (IGLC-11); 2003 Jul 26-28; Blacksburg. Virginia (USA): Virginia Polytechnic Institute and State University; 2003. p. 1-13.
- Reinschmidt K, Trejo D. Economic value of building faster. Journal of Construction Engineering and Management. 2006 Jul;132(7):759-66. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:7(759)
- Oglesby CHP, Henry W, Howell GA. Productivity improvement in construction. New York (NY): McGraw-Hill; 1989. 343 p.
- Sacks R, Goldin M. Lean management model for construction of high-rise apartment buildings. Journal of Construction Engineering and Management. 2007 May;133(5):374-84. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:5(374)
- Howell G, Laufer A, Ballard G. Interaction between sub-cycles. Journal of Construction Engineering and Management. 1993 Dec;119(4):714-28. https://doi.org/10.1061/(ASCE)0733-9364(1993)119:4(714)
- Nielsen AS, Thomassen MA. How to reduce batch-size. Proceedings of the 12th Annual Conference of the International Group for Lean Construction (IGLC-12); 2004 Aug 3-5; Copenhagen. Elsinore (Denmark): Lean Construction Institute; 2004. p. 263-73.
- Shim E. Impacts of matched batch sizes on time reduction in construction projects. Proceedings of the 28th International Symposium on Automation and Robotics in Construction; 2011 Jun 29-Jul 2; Seoul. Seoul (Korea): Korea Institute of Construction Engineering and Management; 2011. p. 929-34.
- Thomas H, Maloney W, Horner R, Smith G, Handa V, Sanders S. Modeling construction labor productivity. Journal of Construction Engineering and Management. 1990 Dec;116(4):705-26. https://doi.org/10.1061/(ASCE)0733-9364(1990)116:4(705)
- Shim E. The decision-making modeling for concurrent planning of construction projects [dissertation]. College Station (TX): Texas A&M University; 2008. 239 p.
- Horman M, Thomas R. Role of inventory buffers in construction labor performance. Journal of Construction Engineering and Management. 2005 Jul;131(7):834-43. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:7(834)
- Yoon JY, Kim YS, Kim JJ. Suggestion improvement based on form work productivity analysis in apartment housing construction. Journal of the Korea Institute of Building Construction. 2010 Oct;12(5):49-56. https://doi.org/10.5345/JKIC.2010.10.1.049
- Tommelein ID, Riley DR, Howell GA. Parade game: Impact of work flow variability on trade performance. Journal of Construction Engineering and Management. 1999 Sep;125(5):304-10. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:5(304)
- Ward S, McElwee A. Application of the principle of batch size reduction in construction. Proceedings of the 15th Annual Conference of the International Group for Lean Construction (IGLC-15); 2007 Jul 15-17; East Lansing. Michigan (MI): Aardvark Global Publishing; 2007. p. 178-90.
- Sawhney A., Walsh K, Bashford H and Palaniappan S. Impact of inspected buffers on production parameters of construction processes. Journal of Construction Engineering and Management. 2009 Apr;135(4):309-29.
- Harris RB, Ioannou PG. Scheduling projects with repeating activities. Journal of Construction Engineering and Management. 1998 July/August;124(4):269-78. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:4(269)
- Harmelink D, Rowings JE. Linear scheduling model: Development of controlling activity path. Journal of Construction Engineering and Management. 1998 July/August; 124(4):263-68. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:4(263)
- Mattila KG, Park A. Comparison of linear scheduling model and repetitive scheduling method. Journal of Construction Engineering and Management. 2003 Feb;129(1):56-64. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:1(56)
- Kenley R, Seppanen O. Location-based management for construction. 1st ed. New York,: Spon Press; 2010. 554 p.
- Lee HS, Park GJ, Park MS, Ryu HG. Construction planning model for using the working space of high-rise building construction. Journal of the Architectural Institute of Korea (Structure/ Construction). 2010 Jun;26(6):129-38.
- Ryu HG. A method of applying work relationships for a linear scheduling model. Journal of the Korea Institute of Building Construction. 2010 Oct;10(4):31-9. https://doi.org/10.5345/JKIC.2010.10.4.031
- Shim E. Selection of compatible construction methods for project expedition. Proceedings of the 46th Associated Schools of Construction (ASC) Annual International Conference; 2010 Apr. 7-10; Boston, Massachusetts (USA): Lambert Academic Publishing; 2010. p. 119-27.