References
- Bell, J., "Beauty is in the eye of the beholder : Establishing a fair and equitable value for embryonic high-tech enterprises," Venture Capital Journal, Vol.40(2000), pp.33-34.
- Ben-Tal, A. and A. Nemirovski, "A robust optimizatioin-Methodelogy and applications," Mathematical Programming, Vol.92(2002), pp.86-100.
- Bowman, R.A., "Stochastic gradient-based time-cost tradeoffs in pert networks using simulation," Annals of Operations Research, Vol.53(1994), pp.533-551. https://doi.org/10.1007/BF02136842
- Cohen, I., B. Golany, and A. Shtub, "The stochastic time-cost tradeoff problem : A robust optimization approach," Networks, Vol.49(2007) pp.175-188. https://doi.org/10.1002/net.20153
- De, P., J. Dunne, J.B. Ghosh, and C.E. Wells, "Complexity of the discrete time-cost trade-off problem for project networks," Operations Research, Vol.45(1997), pp.302-306. https://doi.org/10.1287/opre.45.2.302
- Fulkerson, D.R. "A network flow computation for project cost curves," Management Science, Vol.7(1961), pp.167-178. https://doi.org/10.1287/mnsc.7.2.167
- Garey, M.R. and D.S. Johnson, Computers and intractability : A guide to the theory of NP-completeness W.H. Freeman, 1979.
- Gutjahr, W.J., C. Strauss, and E. Wagner, "A stochastic branch-and-bound approach to activity crashing in project management," Informs Journal on Computing, Vol.12(2000), pp.125-135. https://doi.org/10.1287/ijoc.12.2.125.11894
- Hagstrom, J.N., "Computational complexity of pert problems," Networks, Vol.1(1988), pp. 139-147.
- Hazir, O., M. Haouari, and E. Erel, "Robust scheduling and robustness measures for the discrete time-cost trade-off problem," European Journal of Operational Research, Vol. 207(2010), pp.633-643. https://doi.org/10.1016/j.ejor.2010.05.046
- Hillier, F.S. and G.J. Lieberman, Introduction to Operations Research, newblock McGraw-Hill, New York, NY, 2001.
- Kelley, J.E., "Critical path planning and scheduling : Mathematical basis," Operations Research, Vol.9(1961), pp.296-320. https://doi.org/10.1287/opre.9.3.296
- Leu, S.S., A.T. Chen, and C.H. Yang, "A GA-based fuzzy optimal model for construction time-cost trade-off," International Journal of Project Management, Vol.19(2001), pp. 47-58. https://doi.org/10.1016/S0263-7863(99)00035-6
- Mokhtari, H., A. Aghaie, J. Rahimi, and A. Mozdgir, "Project time-cost trade-off scheduling : a hybid optimization approach," International Journal of Advanced Manufacturing Technology, Vol.50(2010), pp.811-822. https://doi.org/10.1007/s00170-010-2543-4
- Roemer, T. and R. Ahmadi, "Concurrent crashing and overlapping in product development," Operations Research, Vol.52(2004), pp.606-622. https://doi.org/10.1287/opre.1040.0125
- Sahlmann, W.A., "Insights from the ventures capital model of project governance," Business Economics, Vol.29(1994), pp.35-41.
- Shtub, A., J.F. Bard, and S. Globerson, Project Managemnet : Engineering, Technology and Implementation, Prince Hall, Englewood Cliff, NJ. (1994).
- Skutella, M., "Approximation algorithms for the discrete time-cost tradeoff problem," Proceedings of the Eighth Annual ACM-SIAM Symposium on Discrete Algorithms, New Orleans, L.A. (1997), pp.501-508.
- Weglarz, J., J. Jozefowska, M. Mika, and G. Waligora, "Project scheduling with finite or infinite number of activity processing modes -a survey," European Journal of Operational Research, Vol.208(2011), pp.177-205. https://doi.org/10.1016/j.ejor.2010.03.037
- Wollmer, R.D., "Critical path planning under uncertainty," Mathematical Programming Study, Vol.25(1985), pp.164-171. https://doi.org/10.1007/BFb0121082