• Title/Summary/Keyword: BIM 자동화

Search Result 108, Processing Time 0.02 seconds

Automation Review of Road Design Standard using Visual Programming (비주얼 프로그래밍 기법을 활용한 도로설계기준 자동검토 방안)

  • Hyoun-seok Moon;Hyeoun-seung Kim
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.4
    • /
    • pp.891-898
    • /
    • 2022
  • Purpose: There is not much time left for mandatory BIM implementation for all sectors and stages of the construction industry. Therefore, it is necessary to find a way to secure technology to substantially improve the productivity of BIM work. In the research, we proposed a method to automatically verify related construction standards for major objects produced by BIM modeling procedures so that engineers can verify construction standards in the BIM-based design process. Method: We defined a modeling work procedure for BIM-based road design work and prepared a method for constructing related design standards in a database. In addition, a process map for developing a BIM-based design basis review automation system was also presented. Result: A BIM-based design standard review automation module was developed using Civil3D and Dynamo. And it was confirmed by the test application that it is possible to quickly judge whether the BIM object manufactured in the design process conforms to the construction design standard. Conclusion: BIM-based design standard review automation technology can improve the productivity of BIM model production work and secure the quality of the BIM model.

Development and Application of a BIM Library Placement Automation Model (BIM 라이브러리 자동 배치 모형 개발 및 사례 검증)

  • Hyeon-Seung Kim;Hyoun-Seok Moon;Leen-Seok Kang
    • Land and Housing Review
    • /
    • v.15 no.1
    • /
    • pp.157-165
    • /
    • 2024
  • As major public owner agencies in Korea have improved the application level of BIM, many design and construction companies are paying more attention to ways to improve actual work productivity in the BIM execution process. In this study, we introduce a method to automate the placement of BIM libraries, a recurring task in the BIM-based design process that serves as a prime example of BIM design automation methodologies. In particular, we classify the target surfaces for placement of BIM libraries into straight lines, curves, vertical planes, and surfaces. For each target surface, we implement a BIM library automatic placement model in Dynamo, considering the spacing and alignment according to the distance between the centers of two objects and the linear length. The results of case studies confirm that the proposed method can be employed according to various placement environments and conditions with the working time shortened. The study proposes that various objects and structures that need to be placed according to the terrain characteristics can be placed accurately, and work productivity can be significantly improved through the automation of placement.

A study on Development of Practical BIM Library for Automated BIM Design in Port and Harbor Infrastructure (항만인프라의 설계 자동화를 위한 실무형 항만 BIM 라이브러리 개발에 관한 연구)

  • Kim, Hyeon-Seung;Lee, Heon-Min;Lee, Il-Soo
    • Journal of KIBIM
    • /
    • v.9 no.4
    • /
    • pp.21-30
    • /
    • 2019
  • Many studies on BIM-based design, construction and operation have already been conducted on roads, railways, etc., but BIM research in the ports and harbors is still lacking. This research develops BIM Library and Technical contents focused on practical usability of ports and harbors infrastructure. We have developed technical content by applying various User Interfaces and workflows, considering the characteristics of ports and harbors design. In order to examine the practical utility of the developed library and contents, we tried modeling the breakwater using these. As a result, we confirmed that collaboration of BIM library and technical contents could significantly improve the productivity of BIM design by increasing library usage and automating repetitive tasks.

A Study on the Automated Estimating System using BIM based Library (BIM 기반 토목 라이브러리를 통한 견적자동화시스템에 관한 연구)

  • Han, Jung-Hoon;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.12-18
    • /
    • 2011
  • The BIM techniques which manages information over the life cycle of construction project based on the 3-dimensional model are developing in the direction of integrated construction management including planning, design, analysis, estimation, 3D simulation and so on. The estimation model based on the BIM has different detail level and model information. In this study, the LOD of estimation model is catched for the bridge structures. The library classes are defined with construction information classification system, and the quantities of resources are calculated by class parameter using Microstation API. Finally, the automated estimation system using BIM based library is verified by the integrated model for adjustments of level of detail.

BIM Model Generation at Building Level using Automated Scan-to-BIM Process - Focused on Demonstration of BIM Modeling for Gangwon Fire Service Academy - (Scan-to-BIM 자동화 기술을 활용한 건축물 단위의 BIM 모델 생성 - 강원소방학교 BIM 모델링 실증을 중심으로 -)

  • Park, Jun-Woo;Kim, Jae-Hong;Kim, So-Hyun;Lee, Ji-Min;Choi, Chang-Soon;Jeong, Kwang-Bok;Lee, Jae-Wook
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.53-62
    • /
    • 2021
  • The successful implementation of Scan-to-BIM automation depends on the entire process from scanning of buildings, including indoor facilities and furniture, to generating BIM models. However, the conventional Scan-to-BIM process requires a lot of time, manpower, and cost for the manual generation of BIM models including indoor objects. To solve this problem, this study applied a Scan-to-BIM automation process using a deep learning model and parametric algorithm to an existing building, Kangwon Fire Service Academy. To improve the accuracy of the BIM model, after object data was extracted from the scan data, the data was corrected according to actual object-specific conditions. As a result, the accuracy of the BIM model created by the proposed Scan-to-BIM automation process was 91% compared to the actual area of the construction drawings. In addition, it was confirmed that the BIM objects were automatically generated for 10 object classes.

BIM Based Automated Planning and Operation System for Earthwork Equipment (BIM 기반 토공 장비 계획 및 운영 자동화 시스템)

  • Kim, Jeong-Hwan;Jang, Jun-Hyun;Min, Ji-Hong;Seo, Jong-Won
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.375-378
    • /
    • 2011
  • 건설공사에서 토공사가 차지하는 비중은 타공종에 비하여 높다. 즉 건설공사의 생산성을 향상시키기 위하여 토공사를 중점적으로 관리하는 일은 매우 중요하다고 할 수 있다. 그러나 현재의 토공 시스템은 굴삭 조종자와 현장 계획 관리자의 경험적 지식에만 의지하여 토공 계획을 수립하고 있는 실정이며, 또한 노동 집약적 토공작업의 한계를 벗어나지 못하는 현실로 인하여 토공사를 관리함에 어려움이 있다. 이러한 당면 과제를 극복하고자 BIM 기반의 토공 시스템에 대하여 소개하고자 한다. 본 논문에서는 굴삭 장비와 연계하는 토공 계획과 운영 자동화 시스템에 대하여 주로 다루게 된다. 굴삭 작업 계획 생성 시스템, 장비 조종 인터페이스, 웹 기반 Project Management Information System(PMIS)이 개발되는 과정에서 적용된 BIM 요소기술에 대하여 살펴본다.

  • PDF

A Standardized BIM Framework for Supporting Life-cycle Business Process for Port & Harbour Facilities (항만시설의 생애주기 업무 지원을 위한 BIM 표준 프레임워크 구축)

  • Moon, Hyoun-Seok;Won, Ji-Sun;Shin, Jae-Young
    • Journal of KIBIM
    • /
    • v.8 no.4
    • /
    • pp.49-59
    • /
    • 2018
  • Recently, the application of BIM for port & harbour facilities has been increasing, as it is widely applied to the infrastructure field both at domestic and abroad. However, the port and harbour projects still have very poor facilities information management system and the application level of BIM is very low compared to other facilities. Even if BIM is applied for those project, it is very difficult to determine in advance what information is needed without an accurate understanding of the business process. The purpose of this study is to develop a BIM framework for port & harbour facilities and to examine its applicability. To do this, we structured the classification of the port & harbour facilities and constructed object-based classification system based on ISO12006-3 standard. We also derived the BIM framework requirements from the viewpoint of process, standard, interface, and information, and confirmed the linkage of the BIM object classification system in the framework item. The applicability of the BIM framework for inspection process cases of port & harbour was examined. Accordingly, this study can solve requirement setting method, which is the non - procedural and non - systematic project information, in the BIM application process of the port & harbour project with the BIM framework. In addition, the framework is expected to be integrated into the system to play a key role in the selection of project objectives, and the ability to clearly identify the information requirements required by the BIM manager to perform the project.

Development of Automation Technology for Modeling of Railway Infrastructure using BIM Library (BIM 라이브러리를 활용한 철도 인프라의 모델링 자동화 기술 개발)

  • Kim, Yun-Ok;Moon, So-Yeong;Yoon, Hee-Taek;Park, Young-Kon;Kim, Ji-Young
    • Journal of KIBIM
    • /
    • v.12 no.3
    • /
    • pp.18-29
    • /
    • 2022
  • Recently, research on the application of BIM has continuously been active not only in architecture but also in civil engineering in order to improve work efficiency across the project's planning, design, construction and maintenance phases. However, the empirical applications of BIM targeting to civil engineering scope of construction sites still lags compared to architectural sized projects. This is because BIM tools are mainly based upon vertical structures of architecture, thereby most of them have difficulties and limitations to get utilized on horizontal structures of civil engineering. Therefore, this study intends to propose automation technology of design using BIM library and to indicate its field availability through case application on a railway project representing linear infrastructure. In addition, it put forward the utilization plan of the automation technology upto 4D and 5D by continue making use of the BIM model created in the project's design stage up through the maintenance stage. The novel method of the technology proposed in this paper incorporates the automatic creation of the BIM library based on two-dimensional tunnel cross-sections and sweeping of it over three-dimensional alignment to create a BIM model of linear infrastructure. The proposed technology is anticipated to improve the efficiecny of modeling process of railway projects based on linear structures.

A Proposal for Partial Automation Preparation System of BIM-based Energy Conservation Plan - Case Study on Automation Process Using BIM Software and Excel VBA - (BIM기반 에너지절약계획서 건축부문 부분자동화 작성 시스템 제안 - BIM 소프트웨어와 EXCEL VBA를 이용한 자동화과정을 중심으로 -)

  • Ryu, Jea-Ho;Hwang, Jong-Min;Kim, Sol-Yee;Seo, Hwa-Yeong;Lee, Ji-Hyun
    • Journal of KIBIM
    • /
    • v.12 no.2
    • /
    • pp.49-59
    • /
    • 2022
  • The main idea of this study is to propose a BIM-based automation system drawing up a report of energy conservation plan in the architecture division. In order to obtain a building permit, an energy conservation plan must be prepared for buildings with a total floor area of 500m2 or more under the current law. Currently, it is adopted as a general method to complete a report by obtaining data and drawings necessary for an energy conservation plan through manual work and input them directly into the verification system. This method takes a lot of effort and time in the design phase which ultimately increases the initial cost of the business, including the services of companies specialized in the environmental field. However, in preparation for mandatory BIM work process in the future, it is necessary to introduce BIM-based automatic creation system that has an advantage for shortening the whole process to enable rapid permission of energy-saving designs for buildings. There may be many methods of automation, but this study introduces how to build an application using Dynamo of Revit, in terms of utilizing BIM, and write an energy conservation plan by automatic completion of report through Dynamo and Excel's VBA algorithm, which can save time and cost in preparing the report of energy conservation plan compared with the manual process. Also we have insisted that the digital transformation of architectural process is a necessary for an efficient use of our automation system in the current energy conservation plan workflow.

A System Development of Quantity Data Type Analysis for BIM based Automation of Estimation Framework (BIM기반 견적자동화 체계구축을 위한 물량 데이터 유형 분석 체계 개발)

  • Lee, Jae-Joon;Shin, Tae-Hong;Kim, Seong-Ah;Kang, Myung-ku;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.744-747
    • /
    • 2008
  • Quantity information focused on a design drawing plays a critical role in a decision making related to cost for project participants during project life cycles. Related participants absolutely depend on quantity take-off working which produces the quantity information by hand, and then a worker's mistake often causes many errors. The difference of quantity by the know-how of the person in charge of the estimation also occurs. In addition, the worker passes through the whole quantity take-off processes again in case of re-working for quantity take-off produced by a change order. The requirements about the automated estimation increase because of the needs for the accurate quantity take-off and dealing with the change order and recently, the studies about the automated estimation working process based on 34 cad model from 3d cad modeler are attempted in various viewpoints. However, the existing studies reach the limits such as common quantity data type framework for getting Quantity information. Focused on a certain 34 cad modeler and BIM based automation of estimation using it Therefore, the objective of this study is to develop the a series of system which can extract, analyze, and verify Quantity Data Type in modeler to automate quantity take-off originated from various 3d cad modelers as a foundation study for BIM based automation of estimation framework.

  • PDF