References
- Back, K.H., Oh, Y.S., Kim, Y.J., Kim, Y.G. (2002), "A study on efficiency of tunnel maintenance monitoring", Journal of Korean Tunnelling and Underground Space Association, Vol. 4, No. 4, pp. 355-369.
- Dong-a Publishing Co. (2010), "Dong-a New Korean Dictionary".
- Feldman., A.I., Buechel, G.J. (1999), "Instrumentation program for Boston red line tunnel", 5th International Symposium on Field Measurements in Geomechanics, pp. 95-100.
- Lee, D.H., Han, I.Y., Kim, G.S., Jin, S.W. (2000), "Case studies on applications of convergence measurement system at the stages of tunnel construction and maintenance", Journal of Korean Tunnelling and Underground Space Association, Vol. 2, No. 3, pp. 59-69.
- Meller, S. (1990), "Monitoring of channel tunnel instrumentation", Gage Technique Ltd., pp. 1-31.
- Nam, S.S. (2000), "Case studies on the damage ratio of monitoring sensor", Korean Geotechnical Society Spring Conference at Information Technical Committee.
- Woo, J.T., Lee, R.C. (2008), "Construction monitoring engineering", Goomi Publishing Co., pp. 15-25.
- Woo, J.T. (2009a), "Final report of recently technical maintenance monitoring in the section 1 of the Seoul metro line no.9, Seoul Metropolitan Infrastructure Headquarters, pp. 1-6.
- Woo, J.T. (2009b), "A study on comparison of a ground water influx quantity in Seoul subway tunnel", Journal of Korean Tunnelling and Underground Space Association, Vol. 11, No. 4, pp. 353-359.
- Woo, J.T. (2010a), "A study of the present state analysis and development plans about construction monitoring and monitoring industry", Journal of Korean Society of Civil Engineers, Vol. 30, No. 2D, pp. 163-169.
- Woo, J.T. (2010b), "Analysis techniques toward monitoring Seoul city subway line no.9 maintenance monitoring by the joint study with Industry-University - Institute", Korea Institute for Structural Maintenance and Inspection Spring Conference, pp. 40-43.
- Woo, J.T., Lee, K.I. (2012a), "A study on establishment of measurement and analysis frequency of maintenance monitoring in tunnel", Journal of Korean Tunnelling and Underground Space Association, Vol. 14, No. 2, pp. 117-129. https://doi.org/10.9711/KTAJ.2012.14.2.117
- Woo, J.T., Park, J.H., Ji, H.S. (2012b), "Estimation of construction", Kimoondang Publishing Co., pp. 47-58.
Cited by
- A study on the establishment of pressure limit values of management monitoring in tunnel vol.18, pp.1, 2016, https://doi.org/10.9711/KTAJ.2016.18.1.053
- Two-dimensional numerical tunnel model using a Winkler-based beam element and its application into tunnel monitoring systems vol.18, pp.2, 2015, https://doi.org/10.1007/s10586-014-0418-4
- A study on the establishment of stress limit values of management monitoring in tunnel vol.17, pp.1, 2015, https://doi.org/10.9711/KTAJ.2015.17.1.025
- A study on the estimation of the optimal number of monitoring points in single-track tunnel lining with the inverse analysis program vol.16, pp.1, 2014, https://doi.org/10.9711/KTAJ.2014.16.1.001