Analysis and Quantitative Estimation of Risk Factors of Design-Build

턴키 프로젝트에서 리스크요인 분석 및 정량적 평가

  • Received : 2012.01.18
  • Accepted : 2012.07.13
  • Published : 2012.09.30

Abstract

The Risks in undertaking a construction project comes from many sources and often involves many participants in the project. This study has identified various kinds of risks, assessed the risk factors quantitatively and suggested risk management method for response pertinent in Design Build(Turn Key)type of projects in Korean context. A questionnaire was designed comprising of 145 possible risks in all types of construction projects. The population from owner, consultant and contractor groups was asked to indicate the risks applicable in DB projects. 25 numbers of critical risks in DB projects were identified and further analyzed for reveling inherent relationship between them through factor analysis. Factor analysis revealed 8 risk factors in DB projects. Construction site related, contract related and design related risk factor consisted about 72% of total risk weight. It has been found out about 6%, while considering the mutual dependency, it is about 10% of total cost of DB project. Therefore, It is suggested that 6% to 10% of construction amount as contingency has to be made provision for risk responses in the DB projects.

턴키계약방식(Design Build)은 설계시공 일괄계약방식으로 책임 한계가 보다 광범위하게 적용되어 프로젝트 수행 초기 설계 단계부터 설계비 부담 증가 등 일반 분리발주공사 보다 리스크 발생율이 높은 실정이다. 따라서 이번 연구에서는 턴키계약프로젝트에서 리스크요인의 분석 및 정량적 평가 방안을 연구하였다. 이 번 연구는 프로젝트참여자로부터 수집한 설문조사자료를 이용하여 통계분석을 수행한 결과 총145개의 리스크변수중 전체 참여자 그룹이 동의하는 DB프로젝트에서의 리스크변수는 25개로 나타났다. 요인분석을 통하여 이를 8가지 리스크요인으로 함축할 수 있었으며 이중 3가지 요인인 건설현장관련, 계약관련 및 설계관련 리스크요인이 72%의 가중치를 나타내었다. 리스크변수 및 리스크요인에 따른 가중치와 결합확률을 이용하여 리스크요인에 기인한 추정손실의 크기를 전체공사비에 대한 백분율로 추정한 결과 약 6%로 나타났고, 리스크 요인상호영향을 고려하면 약 10%를 나타나 리스크대응을 위하여 전체공사비의 약 6%~10%의 예비비를 계상할 필요가 있는 것으로 나타났다.

Keywords

References

  1. 오국열(2012)," 턴키 계약 프로젝트의 리스크요인 분석 및 대응 방안", 박사학위 논문
  2. 윤준선(2005), "건축턴키공사입찰안내서의문제점과개선방안에 관한연구", 중재연구, vol.15 No3, pp. 303-324.
  3. 이양규(2005), "토목공사 수주현황 분석을 통한 턴키 대안 입찰 제도의 문제점 및 개선방안 연구", 철도학회논문집 제8권 제5호, pp. 460-469.
  4. 이종수 (2003), "건축공사 턴키 발주방식의 개선 방안", 대한건축학회, Vol. 47 No.2, pp. 5-38.
  5. Awakul, P., and Ogunlana, S.O., (2002), "The effect of attitudinal differences on interface conflicts in large scale construction projects: a case study," Construction Management and Economics, (T & F Spon), Vol. 20 (4), pp. 365-377. https://doi.org/10.1080/01446190210133456
  6. Bragg, T., (2001). "Three ways to deal with conflict in organizations," Peacemakers training, USA, .
  7. CEIM (Construction, Engineering and Infrastructure Management) (2010)," Risks in the construction of hydropower tunnels in Vietnam", < http://professionalprojectmanagement.blogspot.com/2009/11/risks-in-construction-of-hydropower.html>.
  8. Cioffi, D.F. and Khamooshi, H. (2009) "A practical method of determining project risk contingency budgets" Journal of the Operational Research Society, vol. 60, pp. 565-571. https://doi.org/10.1057/palgrave.jors.2602586
  9. Dikmen, I and Birgonul, T (2005), "An analytical process based model for risk opportunity assessment of international construction projects", Canadian Journal of Civil Engineering (in press).
  10. Dikmen, I., Birgonul, M.T. and Han, S. (2007b) "Using fuzzy risk assessment to rate cost overrun risk in international construction projects", International Journal of Project Management vol. 25, 494-505. https://doi.org/10.1016/j.ijproman.2006.12.002
  11. Hanscomb. Means (2004), "International Construction Intelligence", Vol. 16, No. 6, January/February.
  12. Hsueh, S.L., Perng, Y.H., Yan, M.R. and Lee, J.R. (2007) "On-line multi-criterion risk assessment model for construction joint ventures in China" Automation in Construction 16, pp. 607-619. https://doi.org/10.1016/j.autcon.2007.01.001
  13. Irani, D.S. (2010), "Minimizing risks in Design/Build Projects: An owner's Engineer's view", PB world, .
  14. Jannadi, O.A. and Almishari, S. (2003) "Risk Assessment in Construction" Journal of Construction Engineering and Management 129(5), pp. 492-500. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:5(492)
  15. Keytone, J. (2001), "Communication research: asking questions, finding answers", (2nd Ed.), McGraw-Hill.
  16. Kim, T.W. and Joh, H.W. (2005), "Key barriers and their strategic responses to activate knowledge sharing in construction organization,", 1st International Conference on Construction Engineering and Management, 16-19 October, 2005, Seoul, Korea, CD-ROM, pp. 403-408.
  17. Li, H., and Love, P.E.D., (1998), "Developing a theory of construction problem solving", Construction Management and Economics (Taylor and Francis), Vol.16, pp.721-727. https://doi.org/10.1080/014461998372015
  18. Long Le-Hoai, Young Dai Lee, Guk Yeol Oh Cho(2010), Korean Journal of Construction Engineering and Management, Vol. 11 No.5, pp.84-94, "Modle for Predicting Success of Partnering in Vietnam:A Discriminant Analysis Approach". https://doi.org/10.6106/KJCEM.2010.11.5.84
  19. Toler, T.N. (2010), "Design-build vs. Traditional construction: risk and benefit analysis", Toler & Hanrahan LLC, USA, .
  20. Walke, R., Topkar, V., Kabiraj, S(2010), "Risk Quantification Using EMV Analysis-A Strategic Case of Ready Mix Concrete Plants", IJCSIInternational Journal of Computer ScienceIssues, Vol.7, Issue5, .
  21. Young Dai Lee, Nirmal Kumar Acharya,Jung Ki Kim(2007), "Korean Journal of Construction Engineering and Management", Vol. 8 No.2, pp246-262, "Investigation of Key Factors to measure on-site Performance of a Construction firm"