참고문헌
- Ahn, H. and Kaminsky, P., "Production and distribution policy in two-stage stochastic push pull system," IIE Transactions, Vol. 37, No. 7, pp. 609-621, 2005. https://doi.org/10.1080/07408170590948477
- Bollapragada, R. and Rao, U.S., "Replenishment planning in discrete time, capacitated, nonstationary, stochastic inventory system," IIE Transactions, Vol. 38, No.7, pp. 583-595, 2006.
- Gupta, A. and Maranas, C.D., "Managing demand uncertainty in supply chain planning," Computers and Chemical Engineering, Vol. 27, No. 8-9, pp. 1219-1227, 2003. https://doi.org/10.1016/S0098-1354(03)00048-6
- Higle, J.L. and Wallace, S.W., "Sensitivity analysis and uncertainty in linear programming," Interfaces, Vol. 33, No. 4, pp. 53-60, 2003. https://doi.org/10.1287/inte.33.4.53.16370
- Leung, S.C.H. and Wu, Y., "A robust optimization model for stochastic aggregate production planning," Production Planning and Control, Vol.15, No. 5, pp. 502-514, 2004. https://doi.org/10.1080/09537280410001724287
- Leung, S.C.H., et al., "A robust optimization model for multi-site production planning problem in an uncertain environment," European Journal of Operational research, Vol, 181, No.1, pp. 224-238, 2007. https://doi.org/10.1016/j.ejor.2006.06.011
- Sen, S. and Higle, J.L., "An introductory tutorial on stochastic linear programming models," Interfaces, Vol. 29, No. 2, pp. 33-61, 1999. https://doi.org/10.1287/inte.29.2.33
- Yildirim, I., Tan, B., and Karaesmen, F., "A multiperiod stochastic production planning and sourcing problem with service level constraints," OR Spectrum, Vol. 27, No. 2-3, pp. 471-489, 2005. https://doi.org/10.1007/s00291-005-0203-0