참고문헌
- 김종열, 강창욱, 황인극; "클레임코스트를 고려한 프로젝트의 시간-비용 혼합정수계획모형", 한국산업경영시스템학회지, 34(3) : 77-85, 2011.
- Abdelsalam, H. M. E. and Gad, M. M.; "Cost of quality in Dubai : An analytical case study of residential construction projects," International Journal of Project Management, 27 : 501-511, 2009. https://doi.org/10.1016/j.ijproman.2008.07.006
- Avots, I.; "Information systems for matrix organisations in Cleveland David," 1st ed., Matrix management systems handbook Van Nostrand Reinhold, New York, 1984.
- Babu, A. J. G. and Suresh, N.; "Project Management with Time, Cost, and Quality Considerations," European Journal of Operational Research, 88 : 320-327, 1996. https://doi.org/10.1016/0377-2217(94)00202-9
- Barnes, N. M. L. and Wearne, S. H.; "The future for major project management," International Journal of Project Management, 11(3) : 135-142, 1993. https://doi.org/10.1016/0263-7863(93)90046-P
- Burke, R.; "Project Management Planning and Control, Stratford Upon Avon," Management Press, 1995.
- Cervone, H. F.; "Project risk management," OCLC Systems and Services : International Digital Library Perspectives, 22(4) : 256-262, 2006. https://doi.org/10.1108/10650750610706970
- Cnuddle, M.; "Lack of quality in construction economic losses," in Proceddings of 1991 European Symposium on Management, Quality and Economics in Housing and other Building Sectors, 508-515, 1991.
- Crosby, P. B.; "Quality Is Free," McGraw-Hill, New York, 1979.
- Crosby, P. B.; "Quality Without Tears," Penguin Books, Ontario, 1984.
- Dale, B. G. and Plunkett, J. J.; "Quality Costing," Chapman and Hill, London, 1995.
- Elmaghraby, S. E. and Salem, A.; "Optimal linear approximation in project compression," IIE Transactions, 16(4) : 339-347, 1984. https://doi.org/10.1080/07408178408975253
- Feigenbaum, A. V.; "Total quality control," Harvard Business Review, 34(6) : 93-101, 1956.
- Ford, L. R. and Fulkerson, D. R.; "Flows in net works," Princeton University Press, New Jersey, 1962.
- Goyal, S. K.; "A note on simple CPM time-cost tradeoff algorithm," Management Science, 21(6) : 718-722, 1975. https://doi.org/10.1287/mnsc.21.6.718
- Hall, M. and Tomkins, C.; "A Cost of Quality Analysis of a Building Project: towards a Complete Methodology for Design and Build," Construction Management and Economics, 19 : 727-740, 2001. https://doi.org/10.1080/01446190110066146
- Juran, J. M. and Gryna, F. M.; "Quality Planningand Analysis," McGraw-Hill, 2nd ed., 1980.
- Kapur, K. C.; "An algorithm for the project cost/duration analysis problem with quadratic and convex cost functions," IIE Transactions, 5 : 314-322, 1973.
- Kelley, J. E. and Walker, M. R.; "Critical Path Planning and Scheduling : An Introduction," Mauchly Associate, Ambler, PA, 1959.
- Kelley, J. E.; "Critical-path planning and scheduling : mathematical basis," Operations Research, 9(3) : 296-320, 1961. https://doi.org/10.1287/opre.9.3.296
- Kendrick, T.; "Identifying and Managing Project Risk," AMACOM, New York, 2003.
- Khang, D. and Myint, Y.; "Time, cost and quality tradeoff in project management: a case study," International Journal of Project Management, 17(4) : 249-256, 1999. https://doi.org/10.1016/S0263-7863(98)00043-X
- Kim, J. Y., Kang, C. W., and Hwang, I. K.; "A Practical Approach to Project Scheduling : Considering the Potential Quality Loss Cost in the Time-Cost Tradeoff Problem," Published online of : International Journal of Project Management, 2011.
- Koushki, P. A., Al-Rashid, K., and Kartam, N.; "Delays and cost increases in the construction of private residential projects in Kuwait," Construction Management and Economics, 23 : 285-294, 2005. https://doi.org/10.1080/0144619042000326710
- Lamberson, L. R. and Hocking, R. R.; "Optimum time compression in project scheduling," Management Science, 16(10) : B597-B606, 1970.
- Project Management Institute; "A Guide to the Project Management Body of Knowledge," 4th ed., PMI Publications, Pennsylvania, 2008.
- Shenhar, A. J., Levy, O., and Dvir, D.; "Mapping the dimensions of project success," Project Management Journal, 28(2) : 5-13, 1997.
- Siemens, N.; "A simple CPM time-cost tradeoff algorithm," Management Science, 17(6) : B354-B363, 1971.
- Siemens, N. and Gooding, C.; "Reducing project duration at minimum cost : a time/cost trade-off algorithm," OMEGA, 3 : 569-581, 1975.
- Wit, A. D.; "Measurement of project success," Project Management, 6(3) : 164-170, 1988. https://doi.org/10.1016/0263-7863(88)90043-9