References
- Kim TW, Lee JS. Construction delay analysis utilizing system thinking approach. Journal of the architectural institute of Korea(structure & construction). 2006;22(9):131-138.
- Korean commercial arbitration board. Case book of arbitration precedents Vol. 13. KR, Seoul:Korean commercial arbitration board editors; 2003.
- Koo JM, Lee JS. Construction delay analysis method considering productivity. Journal of the architectural institute of Korea(structure & construction). 2004;20(4);153-160.
- AURIC(Architecture & Urban Research Information Center) [Internet]. The dictionary constructional terms. Available from; http://www.auric.or.kr/User/Dict/DictMain.aspx
- Callahan MT, Quackenbush DG, Rowings JE. Construction project scheduling. NY. McGraw-Hill; 1992
- Kartman S. Generic methodology for analyzing delay claims. Journal of construction engineering and management. 1999;125(6):409-419. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:6(409)
- Han SH, Yun SM, Lee SH. Exploring delays of the mega construction project : the case of korea high speed railway. The KSCE journal of civil engineering 2006;26(5):839-848.
- Chan DWM, Kumaraswamy MM. A comparative study of causes of time overruns in Hong Kong construction projects. International journal of project management. 1997;15(1):55-63. https://doi.org/10.1016/S0263-7863(96)00039-7
- Nasir D, Mccabe B, Hartono L. Evaluating risk in construction-schedule model(eric-s):construction schedule risk model. Journal of construction engineering and management, 2003;129(5):518-527. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:5(518)
- Assaf SA, Al-Khalil M, Al-Hazmi M. Cause of delay in large building construction projects. Journal of construction engineering and management. 1995;11(2):45-50.
- Elinwa AU, Joshua M. Time-overrun factors in Nigerian construction industry. Journal of construction engineering and management. 2001;127(5):419-425. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:5(419)
- Majid MZ, Mccaffe R. Factors of non-excusable delays that influence contractors' performance. Journal of management in engineering. 1998;14(3):42-49.
- Jung JH, Lee K, Hong KH, Lee CH. An analysis on difficulties and delay factors for the development and application of technologies for reduction of construction duration. Journal of the architectural institute of Korea(structure & construction). 2010;26(10):121-128.
- Lee JS. Delay analysis using learning effect and linear scheduling in construction. Journal of the architectural institute of Korea(structure & construction). 2008;24(5):185-192.
- Kim KH, Kim KH, Lee YS, Kim JJ. A study about influence of risk factors in relation to construction cost increase and schedule delay on the reinforced concrete construction. Journal of the architectural institute of Korea(structure & construction). 2008;24(5):165-172.
- Lee JS. Delay analysis using linear schedule in construction. Journal of the architectural institute of Korea(structure & construction). 2007;23(8):213-220.
- Lee JS. Modified delay analysis considering production rates. Journal of the architectural institute of Korea(structure & construction). 2006;22(5);203-210.
- Kim YJ, Hong JS, Kim KR, Shin DW. An analysis method for the concurrent delay using delay section concept. Journal of the architectural institute of Korea(structure & construction). 2004;20(6):141-148.
- Kim YJ, Lee WC, Hong JS, Kim KR, Shin DW. A case study on delay analysis methods in the construction project. Korea journal of construction engineering and management 2004;15(6):129-137.
- Kwon JM, Lee JS. Construction delay analysis method; hierarchical planning process approach, Journal of the architectural institute of Korea(structure & construction). 2003;19(8):121-128.
- Lee SB, Lee YM. Improvement for liquidated damages according to the delay of domestic construction project. Journal of the architectural institute of Korea(structure & construction). 2003;19(5):145-152.
- Han JK, Chin SY, Kim YS. An analysis on delay factors of major trades in apartment housing projects. Journal of the architectural institute of Korea(structure & construction). 2003;19(3):163-170.
- Lyu HG, Yu JH, Lee HS. A method of calculating schedule delay considering lost productivity. Journal of the architectural institute of Korea(structure & construction). 2002;18(10):117-125
Cited by
- Developing a construction duration estimation model to ensure the safety in apartment housing construction sites 2018, https://doi.org/10.1007/s12205-017-0605-y
- Integrated CO2, cost, and schedule management system for building construction projects using the earned value management theory vol.103, 2015, https://doi.org/10.1016/j.jclepro.2014.05.031