자동차 부품 현업 분석을 통한 설계 BOM, 생산 BOM, 공정 BOM 구조 설계

eBOM, mBOM, processBOM structure in analyzing of automobile part industry

  • 이승우 (한국기계연구원 나노융합생산시스템연구본부) ;
  • 이재경 (한국기계연구원 시스템엔지니어링 연구본부) ;
  • 이화기 (인하대학교 산업공학과)
  • Lee, Seung-Woo (Nano Convergence and Manufacturing Systems Research Division, KIMM) ;
  • Lee, Jai-Kyuung (Systems Engineering Research Division, KIMM) ;
  • Lee, Hwa-Ki (Department of Industrial Engineering, INHA University)
  • 투고 : 2010.02.17
  • 심사 : 2010.05.31
  • 발행 : 2010.06.30

초록

In accordance with the trend for cooperation of related company, BOM (Bill of Materials) has become an important factor in the manufacturing of production. BOM manages a various basic information of design, production, and process and so on. Especially, automobile industries are related to many company, they build a cooperative system from the communication of information. In this study, we have analyzed a BOM structure of a well-used automobile part industry and proposed a structure of engineering BOM, manufacturing BOM, process BOM for cooperative environment. A proposed various BOM structure are flexible in responding to the situation of structure alternations for automobile part. And also they include in environment factors. It is expected that these BOM structure will be used to basic template in automobile part industry which could be loaded with cooperative hub-system.

키워드

참고문헌

  1. Mather, H, "Bill of Materials", The Dow Jones-Irwin/APICS, (1987).
  2. C & L, "Manufacturing & Supply chain consulting report", Samsung Motors, (1995).
  3. Nissan NTC, "NISSAN 자동차의 생산관리시스템", NISSAN NTC, (1995).
  4. Toyo Engineering corp., "차세대 BOM 구축에 관한 컨설팅 보고서", 삼성 SDS, (1996).
  5. 김대범, "자동차 산업에서의 커뮤니케이션 이노베이션을 위한 Enterprise-BOM 구조에 관한 연구", 강남대학교 논문집, 41 (2003): 1-28
  6. Shu, Q and Wang Ch., "Information Modeling for Product Life cycle Management", Knowledge sharing in the Integrated Enterprise, 83 (2004): 409-416
  7. Zhu, S., Cheng, D., and et al, "A Unified Bill of Materials Based on STEP/XML", Lecture Note in Computer Science, 4402 (2007): 267-276.
  8. Liu Mingzhou, Liu Zhenaqiong, and et al, "Product-Oriented Integrated Management of Enterprise Digital Data", Journal of computer-aided & computer graphics, 18 (2006): 137-142.
  9. 박동석, 양정삼, 유기현, 박범, "주문 생산형 반도체 장비를 위한 E-BOM 복제방법의 구현", 한국 CAD/CAM 학회 논문집, 13 (2008): 273-285.
  10. 정영수, 이건상, 백지환, "리사이클링 고려 설계를 위한 Recycling BOM 개발", 한국자동차공학학회 2006년도 추계학술대회, (2006): 1958-1963.