DOI QR코드

DOI QR Code

A Case of the Distribution Power System PQMS Construction & Harmonic Voltage Analysis

배전계통 PQM 시스템 구축 및 고조파전압 분석사례

  • 박용업 (한전 전력연구원 송배전연구소) ;
  • 이건행 (한전 전력연구원 송배전연구소)
  • Received : 2010.06.09
  • Accepted : 2010.08.02
  • Published : 2010.09.30

Abstract

The main contents of this paper are the PQM system construction case and distribution system harmonic voltage analysis. The PQM system has constructed by KEPCO in order to investigate power quality of distribution power system for new power quality standard of KEPCO. In result, we have confirmed that voltage harmonic measurement value of the high voltage contract customer 8 households is suitable the KEPCO harmonic standard tentative plan. And the voltage harmonic value of distribution line end side is not always more high than source side by harmonic current offset effect. In the future, acquired data by season, region, load from the PQMS will be used on the resonable harmonic standard enactment in KEPCO.

Keywords

References

  1. 한국전력공사, "배전계통 고조파 관리기준 잠정(안) 및 시범적용 계획", 2009.
  2. Electrical Power Systems Quality, Mcgraw-Hill, 1996.
  3. 한국전력공사, 배전계통 플리커 관리기준 제정 및 순간 전압강하 관리방안 수립에 관한 연구, 2010.
  4. IEEE Std. P519-1996, Guide for applying harmonic limits on power system.
  5. 한국전력공사, "기본공급약관 시행세칙", 2007.
  6. IEC 61000-3-6 Ed 2, Assessment of harmonic emission limits for the connection of distorting installations to MV, HV and EHV power system, 2005.
  7. 산업자원부, 배전계통 고조파 관리기준 연구, 산업자원부, pp.81-181, 2005.
  8. IEC/TR 61000-4-30, First Edition, Testing and measurement techniques-Power quality measurement methods, 2003.