Abstract
A competitive construction project must address factors such as cost, performance, aesthetics, schedule and quality. The importance of these factors will vary from project to project and from market to market. Productivity is becoming an ever-more important factor in the acquisition of a project. As the technology or aesthetics of a product matures or stabilizes, and the competitive playing field levels, competition is increasingly based on time. Recently, the construction industry has been depressed due to difficult market circumstances. At this time in particular, construction companies are striving to rationalize their management, both in their planning offices and in the field. In this study, we present a method of calculating a reasonable duration for reinforced form work. We did this by first developing a question for field workers, then sampling form workers based the question. Second, we employed a work analysis method to analyze worker"s work-methods and Time. Then, using the result of this analysis, we measured the Productivity of form work. This measure can be used as basic data to determine the appropriate duration of form work.
건설산업은 타 산업분야에 비하여 체계화되지 못하고 경험 또는 관습에 의한 의사결정이 이루어지는 경우가 빈번하여 생산성 향상이 적극적으로 이루어지지 못하고 있는 실정이다. 특히, 대단위의 건설생산이 이루어지고 있는 공동주택의 공사에서 생산성 향상을 위한 과학적이고 분석적인 연구가 수행될 경우 그 파급효과가 대단히 클 것으로 기대된다. 따라서 본 논문에서는 공사원가에 가장 큰 영향을 미치는 공동주택 골조공사 중 주요공종인 거푸집공사의 효율적인 생산성 향상을 위한 공법개선안을 제시하고자 생산성 측정기법으로 워크샘플링을 활용하였다. 기존 거푸집공사에 대하여 작업절차를 분석하고, 각각의 작업별로 생산성을 분석하였다. 기존 작업법에서 분석된 문제점을 기반으로 개선방안을 제안하였다.