DOI QR코드

DOI QR Code

Development of a Materials Management System Considering Construction Supply Chain Management

건설공급사슬을 고려한 건설공사 자재관리시스템 개발

  • 장명훈 (제주대학교 건축학부, 첨단기술연구소)
  • Published : 2009.10.20

Abstract

A construction supply chain needs an integrated information system, as the general contractor and subcontractors must communicate regularly with one another and share a substantial amount of information in their cooperative work. In the construction industry, supply chain management is necessary in the management of a system, including business process improvement, participant-oriented management, and the supply chain. This research proposed a supporting system and developed the prototype focusing on materials that play an important role in the supply chain. Construction projects are managed mainly through schedule management. As such, supply chain management should be linked with schedule management. The research implemented a prototype of the supporting system for construction supply chain management. The prototype was implemented in Microsoft Project using VBA, including a simulation tool based on @Risk for Project.

건설공급사슬은 시공사와 협력업체의 협력을 위해 많은 정보들이 원활하게 전달되고 공유되어야 하기 때문에 참여주체 간 정보공유 및 교류가 가능한 통합된 정보시스템의 구축이 필수적이다. 건설산업에서도 최근 제조 분야를 중심으로 부상하고 있는 기업 내 업무프로세스 개선, 참여주체 중심의 경영, 공급사슬을 하나의 시스템으로 관리하는 공급사슬관리 방식을 적용할 필요가 있다. 본 연구에서는 공급사슬의 중요한 부분을 차지하는 자재를 중심으로 공급사슬관리를 지원하는 시스템을 제안하였다. 건설공사는 공정관리를 중심으로 관리되므로 공급사슬관리도 공정관리과 연계하여 이루어져야 한다. 이를 위하여 공정관리 프로그램에서 자재를 관리하고 공급사슬과 관련된 참여주체가 쉽게 활용할 수 있는 방법을 제안하였다. 또한, 건설현장에서 건설공급사슬관리를 위해 지원시스템을 제안하고 프로토타입을 구현하였다. 프로토타입은 공정관리 프로그램인 Microsoft Project에서 VBA로 프로그래밍하였고, @Risk for Project를 이용하여 시뮬레이션하는 과정을 제시하였다.

Keywords

References

  1. 김민형, 원가경쟁력 제고를 위한 협력업체 관리 방안, 한국건설산업연구원, 2004
  2. 대한상공회의소, SCM 구축을 위한 도입가이드, 2005
  3. 문우경, 윤수원, 김예상, 진상윤, 박지훈, 커튼월의 공법 및 조달 유형에 따른 SCM 적용방안, 한국건설관리학회 학술발표대회 논문집, 제5회, pp.612-615, 2004.11
  4. 민정웅, 건설 공급사슬 관리상의 실시간 정보 공유 활성화 방안, 대한건축학회 논문집(구조계), 제20권 제10호, pp.167-174, 2004.10
  5. 박상우, 박상준, 권원, 김창덕, 전재열, 커튼월 공사에서의 공급사슬관리 적용에 관한 연구, 한국건설관리학회 학술발표대회 논문집, 제5회, pp.301-304, 2004.11
  6. 박상혁, 김예상, 진상윤, 건설산업에서의 공급사슬관리(SCM) 적용에 관한 연구, 한국건설관리학회 논문집, 제4권 제3호, pp.85-94, 2003.9
  7. 이재민, 최종수, 자재구매 및 조달관리가 공정에 미치는 영향분석 - 철골공사 프로젝트를 중심으로, 대한건축학회 논문집(구조계), 제23권 제12호, pp.141-148, 2007.12
  8. 임형철, 송성진, 현장 공정 커뮤니케이션을 통한 공장생산자재의 공급 및 생산관리 방안에 관한 연구, 대한건축학회 논문집(구조계), 제20권 제4호, pp.143-152, 2004.4
  9. Salcedo, S., and Grackin, A., The e-Value chain, Supply Chain Management Review, Vol.3, No.4, pp.63-70, 2000
  10. Agapiou, A., Clausen, L. E., Norman, G., and Flanagan, R., The role of logistics in the materials flow control process, Construction Management and Economics, Vol.16, No.2, pp.131-137, 1998 https://doi.org/10.1080/014461998372420
  11. Andel, T, Information Supply Chain: Set and Get your Goals, Transportation and Distribution, Vol.38, No.2, pp.33, 1997
  12. Arbulu, R. J., and Tommelein, I. D., Value Stream Analysis of Construction Supply Chains: Case Study on Pipe Supports Used in Power Plants, 10th Annual Conference of the International Group for Lean Construction, Gramado, Brazil, 2002
  13. Choo, H. J., and Tommelein, I. D., WorkMovePlan:Database for Distributed Planning and Coordination, 8th Annual Conference of the International Group for Lean Construction, Brighton, UK, 2000
  14. Chua, D. K. H., Jun, S. L., and Hwee, B. S., Integrated Production Scheduler for Construction Look-Ahead Planning, 7th Annual Conference of the International Group for Lean Construction, Berkeley, USA, pp.287-297, 1999
  15. Cooper, M., Lambert, D., and Pagh, J., Supply Chain Management: More Than a New Name for Logistics, The International Journal of Logistics Management, Vol.8, No.1, pp.1-14, 1997 https://doi.org/10.1108/09574099710805556
  16. Min, J. U, Supply Chain Visualization Through Web Services Integration, Ph. D. Dissertation, Stanford University, Stanford, 2004
  17. Nicolini, D., Holti, R., and Smalley, M., Integrating Project Activities: the Theory and Practice of Managing the Supply Chain through Clusters, Construction Management and Economics, Vol.19, No.1, pp.37-47, 2001 https://doi.org/10.1080/014461901452067
  18. Salcedo, S., and Grackin, A., The e-Value chain, Supply Chain Management Review, Vol.3, No.4, pp.63-70, 2000
  19. Shore, B., Information sharing in global supply chain systems, Journal of Global Information Technology Management, Vol.4, No.3, pp.27-50, 2001
  20. Shore, B., Information sharing in global supply chain systems, Journal of Global Information Technology Management, Vol.4, No.3, pp.27-50, 2001
  21. Tah, Joseph H. M., Towards an agent-based construction supply network modelling and simulation platform, Automation in Construction, Vol.14, No.3, pp.353-359, 2005 https://doi.org/10.1016/j.autcon.2004.08.003
  22. Tah, Joseph H. M., Towards an agent-based construction supply network modelling and simulation platform, Automation in Construction, Vol.14, No.3, pp.353-359, 2005 https://doi.org/10.1016/j.autcon.2004.08.003
  23. Vrijhoef, R., Koskela, L., and Howell, G., Understanding Construction Supply Chains: An Alternative Interpretation, 9th Annual Conference of the International Group for Lean Construction, Singapore, 2001
  24. Vrijhoef, R., Koskela, L., and Howell, G., Understanding Construction Supply Chains: An Alternative Interpretation, 9th Annual Conference of the International Group for Lean Construction, Singapore, 2001
  25. Xue, X., Li, X., Shen, Q. and Wang, Y., 'An agent-based framework for supply chain coordination in construction', Automation in Construction, Vol.14, No.3, pp.413-430, 2005 https://doi.org/10.1016/j.autcon.2004.08.010
  26. Xue, X., Li, X., Shen, Q. and Wang, Y., 'An agent-based framework for supply chain coordination in construction', Automation in Construction, Vol.14, No.3, pp.413-430, 2005 https://doi.org/10.1016/j.autcon.2004.08.010

Cited by

  1. Basic Study on the Assembly Process Design of Curtain-wall System for Minimization of Carbon Emission vol.12, pp.6, 2012, https://doi.org/10.5345/JKIBC.2012.12.6.648