Survey of Evolutionary Algorithms in Advanced Planning and Scheduling

  • Gen, Mitsuo (Graduated School of Information, Production and Systems, Waseda University) ;
  • Zhang, Wenqiang (Graduated School of Information, Production and Systems, Waseda University) ;
  • Lin, Lin (Information, Production and Systems Research Center, Waseda University)
  • Received : 2008.08.01
  • Accepted : 2009.02.03
  • Published : 2009.03.31

Abstract

Advanced planning and scheduling (APS) refers to a manufacturing management process by which raw materials and production capacity are optimally allocated to meet demand. APS is especially well-suited to environments where simpler planning methods cannot adequately address complex trade-offs between competing priorities. However, most scheduling problems of APS in the real world face both inevitable constraints such as due date, capability, transportation cost, set up cost and available resources. In this survey paper, we address three crucial issues in APS, including basic scheduling model, job-shop scheduling (JSP), assembly line balancing (ALB) model, and integrated scheduling models for manufacturing and logistics. Several evolutionary algorithms which adapt to the problems are surveyed and proposed; some test instances based on the practical problems demonstrate the effectiveness and efficiency of evolutionary approaches.

Keywords

References

  1. Adams, J., Balas, E., and Zawack, D. (1987), The shifting bottleneck procedure for job shop scheduling, International Journal of Flexible Manufacturing Systems, 34(3), 391-401
  2. Altiparmak, F., Gen, M., Lin, L. and Karaoglan, I. (2007), A steady-state genetic algorithm for multi-product supply chain network design, Computers and Industrial Engineering, Available online June
  3. Altiparmak, F., Gen, M., Lin, L., and Paksoy, T. (2006), A genetic algorithm approach for multiobjective optimization of supply chain networks, Computers and Industrial Engineering, 51(1), 197-216
  4. Amiri, A. (2004), Designing a distribution network in a supply chain system : formulation and efficient solution procedure, European Journal of Operational Research, 171(2), 567-576 https://doi.org/10.1016/j.ejor.2004.09.018
  5. Anderson, E. J. and Ferris, M. C. (1994), Genetic algorithms for combinatorial optimization : the assembly line balancing problem, ORSA Journal on Computing, 6, 161-173
  6. Baker, K. (1974), Introduction to sequencing and scheduling, New York, John Wiley and Sons
  7. Balas, E. (1969), Machine Scheduling via disjunctive graphs : An implicit enumeration algorithm, Operation Research, 17, 941-957 https://doi.org/10.1287/opre.17.6.941
  8. Bautista, J. and Pereira, J. (2002), Ant algorithms for assembly line balancing, Lecture Notes in Computer Science, 2463, 65-75 https://doi.org/10.1007/3-540-45724-0_6
  9. Bautista, J., Suarez, R., Mateo, M., and Companys, R. (2000), Local search heuristics for the assembly line balancing problem with incompatibilities between tasks, Proceedings of the 2000 IEEE International Conference on Robotics and Automation, San Francisco, CA, 2404- 2409
  10. Baybars, I. (1986), A survey of exact algorithms for the simple assembly line balancing problem, Management Science, 32, 909-932 https://doi.org/10.1287/mnsc.32.8.909
  11. Bean, J. C. (1994), Genetics and random keys for sequencing and optimization, ORSA Journal on Computing, 6, 154-160
  12. Becker, C. and Scholl, A. (2006), A survey on problems and methods in generalized assembly line balancing, European Journal of Operational Research, 168, 694-715 https://doi.org/10.1016/j.ejor.2004.07.023
  13. Blazewicz, J., Ecker, K. H., Schmidt, G., and Weglarz, J. (1994), Scheduling in Computer and Manufacturing Systems, Springer
  14. Bowman, E. H. (1960), Assembly line balancing by linear programming. Operations Research, 8(3), 385-389 https://doi.org/10.1287/opre.8.3.385
  15. Brandimarte, P. (1993), Routing and scheduling in a flexible job shop by tabu search, Annals of Operations Research, 41, 157-183 https://doi.org/10.1007/BF02023073
  16. Brucker, P. (1998), Scheduling Algorithms, Springer
  17. Brudaru, O. and Valmar, B. (2004), Genetic algorithm with embryonic chromosomes for assembly line balancing with fuzzy processing times, The 8th International Research/Expert Conference Trends in the Development of Machinery and Associated Technology, TMT 2004, Neum, Bosnia and Herzegovina
  18. Bruker, P. and Schlie, R. (1990), Job-shop scheduling with multi-purpose machines, Computing, 45, 369-375 https://doi.org/10.1007/BF02238804
  19. Bukchin, J., and Tzur, M. (2000), Design of flexible assembly line to minimize equipment cost, IIE Transactions, 32, 585-598
  20. Chan, F. T. S. and Chung, S. H. (2004), A multi-criterion genetic algorithm for order distribution in a demand driven supply chain, International Journal of Computer Integrated Manufacturing, 17(4), 339-351 https://doi.org/10.1080/09511920310001617022
  21. Chan, F. T. S., Chung, S. H., and Wadhwa, S. (2004), A hybrid genetic algorithm for production and distribution, Omega, 33, 345-355
  22. Chen, C. and Lee, W. (2004), Multi-objective optimization of multi-echelon supply chain networks with uncertain product demands and prices, Computers and Chemical Engineering, 28, 1131-1144 https://doi.org/10.1016/j.compchemeng.2003.09.014
  23. Cheng, R., Gen, M., and Tsujimura, Y. (1996), A tutorial survey of job-shop scheduling problems using genetic algorithm, part I : representation, Computers and Industrial Engineering, 30(4), 983-997 https://doi.org/10.1016/0360-8352(96)00047-2
  24. Cheng, R., Gen, M., and Tsujimura, Y. (1999), A tutorial surveyof job-shop scheduling problems using genetic algorithms, part II : hybrid genetic Search Strategies, Computers and Industrial Engineering, 36(2), 343-364 https://doi.org/10.1016/S0360-8352(99)00136-9
  25. Dar-El, E. M. (1973), MALB-A heuristic technique for balancing large single-model assembly lines, AIIE Transactions, 5(4), 343-356
  26. Dellaert, N., Jeunet, J., and Jornard, N. (2000), A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs, International Journal of Production Economy, 68, 241-257 https://doi.org/10.1016/S0925-5273(00)00084-0
  27. Eck, M. (2003), Advanced Planning and Scheduling, BWI paper: http://obp.math.vu.nl/logistics/papers/vaneck.doc.
  28. Erel, E. and Sarin, S. C. (1998), A survey of the assembly line balancing procedures, Production Planning and Control, 9, 414-434 https://doi.org/10.1080/095372898233902
  29. Erol, I. and Ferrell Jr. W. G. (2004), A methodology to support decision making across the supply chain of an industrial distributor, International Journal of Production Economics, 89, 119-129 https://doi.org/10.1016/j.ijpe.2003.10.008
  30. Falkenauer, E. and Delchambre, A. (1992), A genetic algorithm for bin packing and line balancing, Proceedings of the 1992 IEEE International Conference on Robotics and Automation, Nice, France, 1189-1192
  31. Fisher, H. and Thompson, G. (1963), Probabilistic learning combinations of job-shop scheduling rules, Industrial Scheduling, 15, 1225-1251
  32. French, S. (1982), Sequencing and Scheduling. Mathematics and its applications, Ellis Horwood Limited
  33. Gao, J., Gen, M., Sun, L., and Zhao, X. (2007), A hybrid of genetic algorithm and bottleneck shifting for multiobjective flexible job shop scheduling problems, Computers and Industrial Engineering, 53(1), 149-162 https://doi.org/10.1016/j.cie.2007.04.010
  34. Gao, J., Sun, L., and Gen, M. (2008), A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems, Computer and Operations Research, 35(9), 2892-2907 https://doi.org/10.1016/j.cor.2007.01.001
  35. Gen, M. and Cheng, R. (1997), Genetic Algorithms and Engineering Design, New York : John Wiley and Sons
  36. Gen, M. and Cheng, R. (2000), Genetic Algorithms and Engineering Optimization, New York : John Wiley and Sons
  37. Gen, M., Cheng, R., and Lin, L. (2008), Network Models and Optimization : Multiobjective Genetic Algorithm Approach, Springer, London
  38. Gen, M. and Syarif, A. (2005), Hybrid genetic algorithm for multi-time period production /distribution planning, Computers and Industrial Engineering, 48(4), 799-809 https://doi.org/10.1016/j.cie.2004.12.012
  39. Gen, M., Altiparamk, F., and Lin, L. (2006), A genetic algorithm for two-stage transportation problem using priority-based encoding, OR Spectrum, 28(3), 337-354 https://doi.org/10.1007/s00291-005-0029-9
  40. Gen, M. and Zhang, H.(2006) : Effective designing chromosome for optimizing advanced planning and scheduling, C. H. Dagli et al., eds. : Intelligent Engineering Systems Through Artificial Neural Networks, 16, 61-66, ASME Press
  41. Ghosh, S. and Gagnon, R. J. (1989), A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems, International Journal of Production Research, 27, 637-670 https://doi.org/10.1080/00207548908942574
  42. Goncalves, J. F. and De Almedia, J. R. (2002), A hybrid genetic algorithm for assembly line balancing, Journal of Heuristic, 8, 629-642 https://doi.org/10.1023/A:1020377910258
  43. Goncalves, J. F., Magalhaes Mendes, J. J., and Resende, M. G. C. (2005), A hybrid genetic algorithm for the job shop scheduling problem, European Journal of Operational Research, 167(1), 77-95 https://doi.org/10.1016/j.ejor.2004.03.012
  44. Grabot, B. and Geneste, L. (1994), Dispatching rules in scheduling: A fuzzy approach, International Journal of Production Research, 32(4), 903-915 https://doi.org/10.1080/00207549408956978
  45. Guillen, G., Mele, F. D., Bagajewicz, M. J., Espuna, A., and Puigjaner, L. (2005), Multiobjective supply chain design under uncertainty, Chemical Engineering Science, 60, 1535-1553 https://doi.org/10.1016/j.ces.2004.10.023
  46. Held, M., Karp, R. M., and Shareshian, R. (1963), Assembly line balancing-Dynamic programming with precedence constraints, Operations Research, 11, 442-459 https://doi.org/10.1287/opre.11.3.442
  47. Helgeson, W. B., Salveson, M. E., and Smith, W. W. (1954), How to balance an assembly line, Technical Report, Carr Press, New Caraan, Conn
  48. Ida, k. and Osawa, A. (2005), Proposal of algorithm for shortening idle time on job-shop scheduling problem and its numerical experiments, Journal of Japanese Industrial Management Assoc, 56(4), 294-301, (in Japanese)
  49. Jackson, J. R. (1956), A Computing Procedure for a Line Balancing Problem, Management Science, 2, 261-272 https://doi.org/10.1287/mnsc.2.3.261
  50. Jain A. S. and Meeran S. (1998), A state-of -the-art review of job-shop scheduling techniques, technical report, department of applied physics, Electronics and Mechanical Engineering, University of Dundee, Scotland
  51. Jayaraman, V. and Pirkul, H. (2001), Planning and coordination of production and distribution facilities for multiple commodities, European Journal of Operational Research, 133, 394-408 https://doi.org/10.1016/S0377-2217(00)00033-3
  52. Jayaraman, V. and Ross, A. (2003), A simulated annealing methodology to distribution network design and management, European Journal of Operational Research, 144, 629-645 https://doi.org/10.1016/S0377-2217(02)00153-4
  53. Kacem, I., Hammadi, S., and Borne, P. (2002), Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems, IEEE Trans. Systems, Man, and Cybernetics-Part C, 32(1), 1-13 https://doi.org/10.1109/TSMCC.2002.1009117
  54. Kacem, I., Hammadi, S., and Borne, P. (2002), Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems, IEEE Trans. Systems, Man, and Cybernetics-Part C, 32(1), 1-13 https://doi.org/10.1109/TSMCC.2002.1009117
  55. Karp, R. M. (1972), Reducibility among combinatorial problems. In Miller R.E and Thatcher J.W. Editors : Complexity of Computer Applications, 85-104, New York : Plenum Press
  56. Khouja, M., Booth, D. E., Suh, M., and Mahaney, Jr. J. K. (2000), Statistical procedures for task assignment and robot selection in assembly cells, International Journal of Computer Integrated manufacturing, 13, 95-106 https://doi.org/10.1080/095119200129957
  57. Kim, H. and Park, S. (1995), Strong cutting plane algorithm for the robotic assembly line balancing, International Journal of Production Research, 33, 2311-2323 https://doi.org/10.1080/00207549508904817
  58. Kim, Y. K., Kim, Y. J., and Kim, Y. H. (1996), Genetic algorithms for assembly line balancing with various objectives, Computers and Industrial Engineering, 30(3), 397-409 https://doi.org/10.1016/0360-8352(96)00009-5
  59. Kim, Y. K., Kim, Y., and Kim, Y. J. (2000), Two-sided assembly line balancing : a genetic algorithm approach, Production Planning and Control, 11(1), 44-53 https://doi.org/10.1080/095372800232478
  60. Krasnogor, N. and Smith, J. (2000), A memetic algorithm with self-adaptive local search : TSP as a case study, Proceedings of Genetic and Evolutionary Computation Conference, July 10-12, Las Vegas, NV, 987-994, 2000
  61. Lee, C. Y. and Chen, Z.-L. (2001), Machine scheduling with transportation considerations, Journal of Scheduling, 4, 3-24 https://doi.org/10.1002/1099-1425(200101/02)4:1<3::AID-JOS57>3.0.CO;2-D
  62. Leu, Y. Y., Matheson, L. A., and Rees, L. P. (1994), Assembly line balancing using genetic algorithms with heuristic generated initial populations and multiple criteria, Decision Sciences, 15, 581-606
  63. Levitin, G., Rubinovitz, J., and Shnits, B. (2006), A genetic algorithm for robotic assembly line balancing, European Journal of Operational Research, 168, 811-825 https://doi.org/10.1016/j.ejor.2004.07.030
  64. Lopez, O. and Ramirez, M. (2005), A STEP-based manufacturing information system to share flexible manufacturing resources data, Journal of Intelligent Manufacturing, 16(3), 287-301 https://doi.org/10.1007/s10845-005-7024-5
  65. Mati, Y., Rezg, N., and Xie, X. (2001), An integrated greedy heuristic for a flexible job shop scheduling problem, IEEE International Conference on Systems, Man, and Cybernetics, 4, 2534-2539
  66. MESX Joint Working Group. (2004), MESX White Paper, [Online]. Available : http://www.mstc.or.jp/faop/doc/informative/MESX-WP.pdf, (in Japanese)
  67. Miltenburg, J. (2002), Balancing and sequencing mixed-model U-shaped production lines, International Journal of Flexible Manufacturing Systems, 14, 119-151 https://doi.org/10.1023/A:1014434117888
  68. Moon, C. (2004b), Evolutionary System Approach for Advanced Planning in Multi-Plant Chain, Ph. D. dissertation, Waseda University, Japan
  69. Moon, C., Kim, J. S., and Gen, M. (2004a), Advanced planning and scheduling based on precedence and resource constraints for e-plant chains, International Journal of Production Research, 42(15), 2941-2955 https://doi.org/10.1080/00207540410001691956
  70. Moscato, P. and Norman, M. (1992), A memetic approach for the traveling salesman problem : implementation of a computational ecology for combinatorial optimization on messagepassing systems, Proceedings of the International Conference on Parallel Computing and Transputer Applications, Amsterdam
  71. Najid, N. M., Dauzere-Peres, S., and Zaidat, A. (2002), A modified simulated annealing method for flexible job shop scheduling problem, IEEE International Conference on Systems, Man and Cybernetics, 5(6)
  72. Nicosia, G., Paccarelli, D., and Pacifici, A. (2002), Optimally balancing assembly lines with different workstations, Discrete Applied Mathematics, 118, 99-113 https://doi.org/10.1016/S0166-218X(01)00259-1
  73. Noorul Haq, A., Jayaprakash, J., and Rengarajan, K. (2006), A hybrid genetic algorithm approach to mixed-model assembly line balancing, International Journal of Advanced Manufacturing Technology, 28, 337-341 https://doi.org/10.1007/s00170-004-2373-3
  74. Nowicki, E., and Smutnicki, C. (2005), An advanced tabu search algorithm for the job-shop problem, Journal of Scheduling, 8(2), 145-159 https://doi.org/10.1007/s10951-005-6364-5
  75. Okamoto, A. (2007), Study on Integrated Scheduling for Manufacturing and Logistics Information System using Hybrid Genetic Algorithm, Ph. D. dissertation, Waseda University, Japan
  76. Okamoto, A., Gen, M., and Sugawara, M. (2005), APS system based on scheduler moGA and XML, Journal of the Society of Plant Engineers Japan, 17(2), 15-24, (in Japanese)
  77. Okamoto, A., Gen, M., and Sugawara, M. (2005), APS System based on Scheduler moGA and XML, Journal of the Society of Plant Engineers Japan, 17(2), 15-24, (in Japanese)
  78. Okamoto, A., Gen, M., and Sugawara, M. (2006a), Integrated data structure and scheduling approach for manufacturing and transportation using hybrid multistage operation-based genetic algorithm, Journal of Intelligent Manufacturing, 17, 411-421 https://doi.org/10.1007/s10845-005-0014-9
  79. Okamoto, A., Gen, M., and Sugawara, M. (2006b), Integrated Scheduling Problem of Manufacturing and Transportation with Pickup and Delivery', International Journal of Logistics and SCM Systems, 1, 19-27
  80. Orvosh, D. and Davis, L. (1994), Using a genetic algorithm to optimize problems with Feasibility constrains, Proceedings of the First IEEE Conference on Evolutionary Computation, 548-552
  81. Ozmehmet Tasan, S. and Tunali, S. (2008), A review of the current applications of genetic algorithms in assembly line balancing, Journal of Intelligent Manufacturing, 19(1), 49-69 https://doi.org/10.1007/s10845-007-0045-5
  82. PSLX Consortium (2003), PSLX Technical Specifications, Recommendation, Version 1.0, [Online]. Available : http://www.pslx.org/
  83. Raa, B. and Aghezzaf, E. H. (2005), A robust dynamic planning strategy for lot-sizing problems with stochastic demands, Journal of Intelligent Manufacturing, 16(2), 207-213 https://doi.org/10.1007/s10845-004-5889-3
  84. Rekiek, B. and Delchambre, A. (2006), Assembly line design : The balancing of mixed-model hybrid assembly lines with genetic algorithms, Springer Series in Advanced Manufacturing, London
  85. Rekiek, B., Dolgui, A., Delchambre, A., and Bratcu, A. (2002), State of art of optimization methods for assembly line design, Annual Reviews in Control, 26, 163-174 https://doi.org/10.1016/S1367-5788(02)00027-5
  86. Roy, B. and Sussmann, B. (1964), Les problems d’ordonnancement avec contraintes disjonctives, Note D.S. No. 9 bis, SEMA, Paris, France
  87. Rubinovitz, J. and Bukchin, J. (1991), Design and balancing of robotic assembly lines, Proceedings of the 4th World Conference on Robotics Research, Pittsburgh, PA
  88. Rubinovitz, J. and Bukchin, J. (1993), RALB-a heuristic algorithm for design and balancing of robotic assembly line, Annals of the CIRP, 42, 497-500 https://doi.org/10.1016/S0007-8506(07)62494-9
  89. Runarsson, T. P. and Jonsson, M. T. (1999), Genetic production systems for intelligent problem solving, Journal of Intelligent Manufacturing, 10, 181-186 https://doi.org/10.1023/A:1008928804949
  90. Sabri, E. H. and Beamon, B. M. (2000), A multi-objective approach to simultaneous strategic and operational planning in supply chain design, Omega, 28, 581-598
  91. Sabuncuoglu, I., Erel, E., and Tanyer, M. (2000), Assembly line balancing using genetic algorithms, Journal of Intelligent Manufacturing, 11(3) 295-310 https://doi.org/10.1023/A:1008923410076
  92. Salveson, M. E. (1955), The assembly line balancing problem, Journal of Industrial Engineering, 6, 18-25
  93. Scholl, A. (1993), Data of Assembly Line Balancing Problems, Schriften zur Quantitativen Betriebswirtschaftslehre 16/93, Th Darmstadt
  94. Scholl, A. (1999), Balancing and Sequencing of Assembly Lines, Physica-Verlag, Heidelberg
  95. Scholl, A. and Becker, C. (2006), State-of-the-art exact and heuristic solution procedures for simple assembly line balancing, European Journal of Operational Research, 168, 666-693 https://doi.org/10.1016/j.ejor.2004.07.022
  96. Scholl, A. and Voss, S. (1996), Simple assembly line balancing-heuristic approaches, Journal of Heuristics, 2, 217-244 https://doi.org/10.1007/BF00127358
  97. Soukhal, A., Oulamara, A., and Martineau, P. (2005), Complexity of flow shop scheduling problems with transportation constraints, European Journal of Operational Research, 161, 32-41 https://doi.org/10.1016/j.ejor.2003.03.002
  98. Su, P., Wu, N., and Yu, Z. (2003) Resource selection for distributed manufacturing in agile manufacturing, Proc. of IEEE International Conference on Systems, Man and Cybernetics, 2(1), 1578-1582
  99. Suresh, G. and Sahu, S. (1994), Stochastic assembly line balancing using simulated annealing, International Journal of Production Research, 32(8), 1801-1810 https://doi.org/10.1080/00207549408957042
  100. Syam, S. S. (2002), A model and methodologies for the location problem with logistical components, Computers and Operations Research, 29, 1173-1193 https://doi.org/10.1016/S0305-0548(01)00023-5
  101. Syarif, A., Yun, Y., and Gen, M. (2002), Study on multi-stage logistics chain network : a spanning tree-based genetic algorithm approach, Computers and Industrial Engineering, 43, 299-314 https://doi.org/10.1016/S0360-8352(02)00076-1
  102. Talbot, F. B., Patterson, J. H., and Gehrlein, W. V. (1986), A comparative evaluation of heuristic line balancing techniques, Management Science, 32, 430 - 454 https://doi.org/10.1287/mnsc.32.4.430
  103. Tan, W. (2000), Integration of process planning and scheduling-a review, Journal of Intelligent Manufacturing, 11(1), 51-63 https://doi.org/10.1023/A:1008952024606
  104. Tan, W. (2004), A linearized polynomial mixed integer programming model for the integration of process planning and scheduling, Journal of Intelligent Manufacturing, 15(5), 593-605 https://doi.org/10.1023/B:JIMS.0000037710.80847.b6
  105. Tavakkoli-Moghaddam, R., Jolai, F., Vaziri, F., Ahmed, P. K., and Azaron, A. (2005), A hybrid method for solving stochastic job shop scheduling problems, Applied Mathematics and Computation, 170(1), 185-206 https://doi.org/10.1016/j.amc.2004.11.036
  106. Truong, T. H. and Azadivar, F. (2005), Optimal design methodologiesfor configuration of supply chains, International Journal of Production Research, 43(11), 2217-2236 https://doi.org/10.1080/00207540500031998
  107. Tsai, D. M. and Yao, M. J (1993), A line-balanced-base capacity planning procedure for series type robotic assembly line, International Journal of Production Research, 31, 1901-1920 https://doi.org/10.1080/00207549308956831
  108. W3C (2004), Extensible Markup Language (XML) 1.0 (3rd Edition), W3C Recommendation, [Online]. Available : http://www.w3.org/TR/2004/REC-xml-20040204
  109. Wu, Z. and Weng, M. X. (2005), Multiagent scheduling method with earliness and tardiness objectives in flexible job shops, IEEE Trans. System, Man, and Cybernetics-Part B, 35(2), 293-301 https://doi.org/10.1109/TSMCB.2004.842412
  110. Xia, W. and Wu, Z. (2005), An effective hybrid optimization approach for muti-objective flexible job-shop scheduling problem, Computers and Industrial Engineering, 48, 409-425 https://doi.org/10.1016/j.cie.2005.01.018
  111. Yan, H., Yu Z., and Cheng, T. C. E. (2003), A strategic model for supply chain design with logical constraints: formulation and solution, Computers and Operations Research, 30(14), 2135-2155 https://doi.org/10.1016/S0305-0548(02)00127-2
  112. Yang, J. B. (2001), GA-based discrete dynamic programming approach for scheduling in FMS environments, IEEE Transactions on Systems, Man and Cybernetics, Part B, 31(5), 824-835 https://doi.org/10.1109/3477.956045
  113. Yang, S. and Wang, D. (2000), Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling, IEEE Trans. on Neural Networks, 11(2), 474-486 https://doi.org/10.1109/72.839016
  114. Zhang, H. and Gen, M. (2005), Multistage-based genetic algorithm for flexible job-shop scheduling problem, Journal of Complexity International, 11, 223-232
  115. Zhang, H. P. (2006), Study on Evolutionary Scheduling Problems in Integrated Manufacturing System, Ph. D. dissertation, Waseda University, Japan