References
- Adams, J., Balas, E., and Zawack, D. (1987), The shifting bottleneck procedure for job shop scheduling, International Journal of Flexible Manufacturing Systems, 34(3), 391-401
- Altiparmak, F., Gen, M., Lin, L. and Karaoglan, I. (2007), A steady-state genetic algorithm for multi-product supply chain network design, Computers and Industrial Engineering, Available online June
- Altiparmak, F., Gen, M., Lin, L., and Paksoy, T. (2006), A genetic algorithm approach for multiobjective optimization of supply chain networks, Computers and Industrial Engineering, 51(1), 197-216
- Amiri, A. (2004), Designing a distribution network in a supply chain system : formulation and efficient solution procedure, European Journal of Operational Research, 171(2), 567-576 https://doi.org/10.1016/j.ejor.2004.09.018
- Anderson, E. J. and Ferris, M. C. (1994), Genetic algorithms for combinatorial optimization : the assembly line balancing problem, ORSA Journal on Computing, 6, 161-173
- Baker, K. (1974), Introduction to sequencing and scheduling, New York, John Wiley and Sons
- Balas, E. (1969), Machine Scheduling via disjunctive graphs : An implicit enumeration algorithm, Operation Research, 17, 941-957 https://doi.org/10.1287/opre.17.6.941
- Bautista, J. and Pereira, J. (2002), Ant algorithms for assembly line balancing, Lecture Notes in Computer Science, 2463, 65-75 https://doi.org/10.1007/3-540-45724-0_6
- Bautista, J., Suarez, R., Mateo, M., and Companys, R. (2000), Local search heuristics for the assembly line balancing problem with incompatibilities between tasks, Proceedings of the 2000 IEEE International Conference on Robotics and Automation, San Francisco, CA, 2404- 2409
- Baybars, I. (1986), A survey of exact algorithms for the simple assembly line balancing problem, Management Science, 32, 909-932 https://doi.org/10.1287/mnsc.32.8.909
- Bean, J. C. (1994), Genetics and random keys for sequencing and optimization, ORSA Journal on Computing, 6, 154-160
- Becker, C. and Scholl, A. (2006), A survey on problems and methods in generalized assembly line balancing, European Journal of Operational Research, 168, 694-715 https://doi.org/10.1016/j.ejor.2004.07.023
- Blazewicz, J., Ecker, K. H., Schmidt, G., and Weglarz, J. (1994), Scheduling in Computer and Manufacturing Systems, Springer
- Bowman, E. H. (1960), Assembly line balancing by linear programming. Operations Research, 8(3), 385-389 https://doi.org/10.1287/opre.8.3.385
- Brandimarte, P. (1993), Routing and scheduling in a flexible job shop by tabu search, Annals of Operations Research, 41, 157-183 https://doi.org/10.1007/BF02023073
- Brucker, P. (1998), Scheduling Algorithms, Springer
- Brudaru, O. and Valmar, B. (2004), Genetic algorithm with embryonic chromosomes for assembly line balancing with fuzzy processing times, The 8th International Research/Expert Conference Trends in the Development of Machinery and Associated Technology, TMT 2004, Neum, Bosnia and Herzegovina
- Bruker, P. and Schlie, R. (1990), Job-shop scheduling with multi-purpose machines, Computing, 45, 369-375 https://doi.org/10.1007/BF02238804
- Bukchin, J., and Tzur, M. (2000), Design of flexible assembly line to minimize equipment cost, IIE Transactions, 32, 585-598
- Chan, F. T. S. and Chung, S. H. (2004), A multi-criterion genetic algorithm for order distribution in a demand driven supply chain, International Journal of Computer Integrated Manufacturing, 17(4), 339-351 https://doi.org/10.1080/09511920310001617022
- Chan, F. T. S., Chung, S. H., and Wadhwa, S. (2004), A hybrid genetic algorithm for production and distribution, Omega, 33, 345-355
- Chen, C. and Lee, W. (2004), Multi-objective optimization of multi-echelon supply chain networks with uncertain product demands and prices, Computers and Chemical Engineering, 28, 1131-1144 https://doi.org/10.1016/j.compchemeng.2003.09.014
- Cheng, R., Gen, M., and Tsujimura, Y. (1996), A tutorial survey of job-shop scheduling problems using genetic algorithm, part I : representation, Computers and Industrial Engineering, 30(4), 983-997 https://doi.org/10.1016/0360-8352(96)00047-2
- Cheng, R., Gen, M., and Tsujimura, Y. (1999), A tutorial surveyof job-shop scheduling problems using genetic algorithms, part II : hybrid genetic Search Strategies, Computers and Industrial Engineering, 36(2), 343-364 https://doi.org/10.1016/S0360-8352(99)00136-9
- Dar-El, E. M. (1973), MALB-A heuristic technique for balancing large single-model assembly lines, AIIE Transactions, 5(4), 343-356
- Dellaert, N., Jeunet, J., and Jornard, N. (2000), A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs, International Journal of Production Economy, 68, 241-257 https://doi.org/10.1016/S0925-5273(00)00084-0
- Eck, M. (2003), Advanced Planning and Scheduling, BWI paper: http://obp.math.vu.nl/logistics/papers/vaneck.doc.
- Erel, E. and Sarin, S. C. (1998), A survey of the assembly line balancing procedures, Production Planning and Control, 9, 414-434 https://doi.org/10.1080/095372898233902
- Erol, I. and Ferrell Jr. W. G. (2004), A methodology to support decision making across the supply chain of an industrial distributor, International Journal of Production Economics, 89, 119-129 https://doi.org/10.1016/j.ijpe.2003.10.008
- Falkenauer, E. and Delchambre, A. (1992), A genetic algorithm for bin packing and line balancing, Proceedings of the 1992 IEEE International Conference on Robotics and Automation, Nice, France, 1189-1192
- Fisher, H. and Thompson, G. (1963), Probabilistic learning combinations of job-shop scheduling rules, Industrial Scheduling, 15, 1225-1251
- French, S. (1982), Sequencing and Scheduling. Mathematics and its applications, Ellis Horwood Limited
- Gao, J., Gen, M., Sun, L., and Zhao, X. (2007), A hybrid of genetic algorithm and bottleneck shifting for multiobjective flexible job shop scheduling problems, Computers and Industrial Engineering, 53(1), 149-162 https://doi.org/10.1016/j.cie.2007.04.010
- Gao, J., Sun, L., and Gen, M. (2008), A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems, Computer and Operations Research, 35(9), 2892-2907 https://doi.org/10.1016/j.cor.2007.01.001
- Gen, M. and Cheng, R. (1997), Genetic Algorithms and Engineering Design, New York : John Wiley and Sons
- Gen, M. and Cheng, R. (2000), Genetic Algorithms and Engineering Optimization, New York : John Wiley and Sons
- Gen, M., Cheng, R., and Lin, L. (2008), Network Models and Optimization : Multiobjective Genetic Algorithm Approach, Springer, London
- Gen, M. and Syarif, A. (2005), Hybrid genetic algorithm for multi-time period production /distribution planning, Computers and Industrial Engineering, 48(4), 799-809 https://doi.org/10.1016/j.cie.2004.12.012
- Gen, M., Altiparamk, F., and Lin, L. (2006), A genetic algorithm for two-stage transportation problem using priority-based encoding, OR Spectrum, 28(3), 337-354 https://doi.org/10.1007/s00291-005-0029-9
- Gen, M. and Zhang, H.(2006) : Effective designing chromosome for optimizing advanced planning and scheduling, C. H. Dagli et al., eds. : Intelligent Engineering Systems Through Artificial Neural Networks, 16, 61-66, ASME Press
- Ghosh, S. and Gagnon, R. J. (1989), A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems, International Journal of Production Research, 27, 637-670 https://doi.org/10.1080/00207548908942574
- Goncalves, J. F. and De Almedia, J. R. (2002), A hybrid genetic algorithm for assembly line balancing, Journal of Heuristic, 8, 629-642 https://doi.org/10.1023/A:1020377910258
- Goncalves, J. F., Magalhaes Mendes, J. J., and Resende, M. G. C. (2005), A hybrid genetic algorithm for the job shop scheduling problem, European Journal of Operational Research, 167(1), 77-95 https://doi.org/10.1016/j.ejor.2004.03.012
- Grabot, B. and Geneste, L. (1994), Dispatching rules in scheduling: A fuzzy approach, International Journal of Production Research, 32(4), 903-915 https://doi.org/10.1080/00207549408956978
- Guillen, G., Mele, F. D., Bagajewicz, M. J., Espuna, A., and Puigjaner, L. (2005), Multiobjective supply chain design under uncertainty, Chemical Engineering Science, 60, 1535-1553 https://doi.org/10.1016/j.ces.2004.10.023
- Held, M., Karp, R. M., and Shareshian, R. (1963), Assembly line balancing-Dynamic programming with precedence constraints, Operations Research, 11, 442-459 https://doi.org/10.1287/opre.11.3.442
- Helgeson, W. B., Salveson, M. E., and Smith, W. W. (1954), How to balance an assembly line, Technical Report, Carr Press, New Caraan, Conn
- Ida, k. and Osawa, A. (2005), Proposal of algorithm for shortening idle time on job-shop scheduling problem and its numerical experiments, Journal of Japanese Industrial Management Assoc, 56(4), 294-301, (in Japanese)
- Jackson, J. R. (1956), A Computing Procedure for a Line Balancing Problem, Management Science, 2, 261-272 https://doi.org/10.1287/mnsc.2.3.261
- Jain A. S. and Meeran S. (1998), A state-of -the-art review of job-shop scheduling techniques, technical report, department of applied physics, Electronics and Mechanical Engineering, University of Dundee, Scotland
- Jayaraman, V. and Pirkul, H. (2001), Planning and coordination of production and distribution facilities for multiple commodities, European Journal of Operational Research, 133, 394-408 https://doi.org/10.1016/S0377-2217(00)00033-3
- Jayaraman, V. and Ross, A. (2003), A simulated annealing methodology to distribution network design and management, European Journal of Operational Research, 144, 629-645 https://doi.org/10.1016/S0377-2217(02)00153-4
- Kacem, I., Hammadi, S., and Borne, P. (2002), Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems, IEEE Trans. Systems, Man, and Cybernetics-Part C, 32(1), 1-13 https://doi.org/10.1109/TSMCC.2002.1009117
- Kacem, I., Hammadi, S., and Borne, P. (2002), Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems, IEEE Trans. Systems, Man, and Cybernetics-Part C, 32(1), 1-13 https://doi.org/10.1109/TSMCC.2002.1009117
- Karp, R. M. (1972), Reducibility among combinatorial problems. In Miller R.E and Thatcher J.W. Editors : Complexity of Computer Applications, 85-104, New York : Plenum Press
- Khouja, M., Booth, D. E., Suh, M., and Mahaney, Jr. J. K. (2000), Statistical procedures for task assignment and robot selection in assembly cells, International Journal of Computer Integrated manufacturing, 13, 95-106 https://doi.org/10.1080/095119200129957
- Kim, H. and Park, S. (1995), Strong cutting plane algorithm for the robotic assembly line balancing, International Journal of Production Research, 33, 2311-2323 https://doi.org/10.1080/00207549508904817
- Kim, Y. K., Kim, Y. J., and Kim, Y. H. (1996), Genetic algorithms for assembly line balancing with various objectives, Computers and Industrial Engineering, 30(3), 397-409 https://doi.org/10.1016/0360-8352(96)00009-5
- Kim, Y. K., Kim, Y., and Kim, Y. J. (2000), Two-sided assembly line balancing : a genetic algorithm approach, Production Planning and Control, 11(1), 44-53 https://doi.org/10.1080/095372800232478
- Krasnogor, N. and Smith, J. (2000), A memetic algorithm with self-adaptive local search : TSP as a case study, Proceedings of Genetic and Evolutionary Computation Conference, July 10-12, Las Vegas, NV, 987-994, 2000
- Lee, C. Y. and Chen, Z.-L. (2001), Machine scheduling with transportation considerations, Journal of Scheduling, 4, 3-24 https://doi.org/10.1002/1099-1425(200101/02)4:1<3::AID-JOS57>3.0.CO;2-D
- Leu, Y. Y., Matheson, L. A., and Rees, L. P. (1994), Assembly line balancing using genetic algorithms with heuristic generated initial populations and multiple criteria, Decision Sciences, 15, 581-606
- Levitin, G., Rubinovitz, J., and Shnits, B. (2006), A genetic algorithm for robotic assembly line balancing, European Journal of Operational Research, 168, 811-825 https://doi.org/10.1016/j.ejor.2004.07.030
- Lopez, O. and Ramirez, M. (2005), A STEP-based manufacturing information system to share flexible manufacturing resources data, Journal of Intelligent Manufacturing, 16(3), 287-301 https://doi.org/10.1007/s10845-005-7024-5
- Mati, Y., Rezg, N., and Xie, X. (2001), An integrated greedy heuristic for a flexible job shop scheduling problem, IEEE International Conference on Systems, Man, and Cybernetics, 4, 2534-2539
- MESX Joint Working Group. (2004), MESX White Paper, [Online]. Available : http://www.mstc.or.jp/faop/doc/informative/MESX-WP.pdf, (in Japanese)
- Miltenburg, J. (2002), Balancing and sequencing mixed-model U-shaped production lines, International Journal of Flexible Manufacturing Systems, 14, 119-151 https://doi.org/10.1023/A:1014434117888
- Moon, C. (2004b), Evolutionary System Approach for Advanced Planning in Multi-Plant Chain, Ph. D. dissertation, Waseda University, Japan
- Moon, C., Kim, J. S., and Gen, M. (2004a), Advanced planning and scheduling based on precedence and resource constraints for e-plant chains, International Journal of Production Research, 42(15), 2941-2955 https://doi.org/10.1080/00207540410001691956
- Moscato, P. and Norman, M. (1992), A memetic approach for the traveling salesman problem : implementation of a computational ecology for combinatorial optimization on messagepassing systems, Proceedings of the International Conference on Parallel Computing and Transputer Applications, Amsterdam
- Najid, N. M., Dauzere-Peres, S., and Zaidat, A. (2002), A modified simulated annealing method for flexible job shop scheduling problem, IEEE International Conference on Systems, Man and Cybernetics, 5(6)
- Nicosia, G., Paccarelli, D., and Pacifici, A. (2002), Optimally balancing assembly lines with different workstations, Discrete Applied Mathematics, 118, 99-113 https://doi.org/10.1016/S0166-218X(01)00259-1
- Noorul Haq, A., Jayaprakash, J., and Rengarajan, K. (2006), A hybrid genetic algorithm approach to mixed-model assembly line balancing, International Journal of Advanced Manufacturing Technology, 28, 337-341 https://doi.org/10.1007/s00170-004-2373-3
- Nowicki, E., and Smutnicki, C. (2005), An advanced tabu search algorithm for the job-shop problem, Journal of Scheduling, 8(2), 145-159 https://doi.org/10.1007/s10951-005-6364-5
- Okamoto, A. (2007), Study on Integrated Scheduling for Manufacturing and Logistics Information System using Hybrid Genetic Algorithm, Ph. D. dissertation, Waseda University, Japan
- Okamoto, A., Gen, M., and Sugawara, M. (2005), APS system based on scheduler moGA and XML, Journal of the Society of Plant Engineers Japan, 17(2), 15-24, (in Japanese)
- Okamoto, A., Gen, M., and Sugawara, M. (2005), APS System based on Scheduler moGA and XML, Journal of the Society of Plant Engineers Japan, 17(2), 15-24, (in Japanese)
- Okamoto, A., Gen, M., and Sugawara, M. (2006a), Integrated data structure and scheduling approach for manufacturing and transportation using hybrid multistage operation-based genetic algorithm, Journal of Intelligent Manufacturing, 17, 411-421 https://doi.org/10.1007/s10845-005-0014-9
- Okamoto, A., Gen, M., and Sugawara, M. (2006b), Integrated Scheduling Problem of Manufacturing and Transportation with Pickup and Delivery', International Journal of Logistics and SCM Systems, 1, 19-27
- Orvosh, D. and Davis, L. (1994), Using a genetic algorithm to optimize problems with Feasibility constrains, Proceedings of the First IEEE Conference on Evolutionary Computation, 548-552
- Ozmehmet Tasan, S. and Tunali, S. (2008), A review of the current applications of genetic algorithms in assembly line balancing, Journal of Intelligent Manufacturing, 19(1), 49-69 https://doi.org/10.1007/s10845-007-0045-5
- PSLX Consortium (2003), PSLX Technical Specifications, Recommendation, Version 1.0, [Online]. Available : http://www.pslx.org/
- Raa, B. and Aghezzaf, E. H. (2005), A robust dynamic planning strategy for lot-sizing problems with stochastic demands, Journal of Intelligent Manufacturing, 16(2), 207-213 https://doi.org/10.1007/s10845-004-5889-3
- Rekiek, B. and Delchambre, A. (2006), Assembly line design : The balancing of mixed-model hybrid assembly lines with genetic algorithms, Springer Series in Advanced Manufacturing, London
- Rekiek, B., Dolgui, A., Delchambre, A., and Bratcu, A. (2002), State of art of optimization methods for assembly line design, Annual Reviews in Control, 26, 163-174 https://doi.org/10.1016/S1367-5788(02)00027-5
- Roy, B. and Sussmann, B. (1964), Les problems d’ordonnancement avec contraintes disjonctives, Note D.S. No. 9 bis, SEMA, Paris, France
- Rubinovitz, J. and Bukchin, J. (1991), Design and balancing of robotic assembly lines, Proceedings of the 4th World Conference on Robotics Research, Pittsburgh, PA
- Rubinovitz, J. and Bukchin, J. (1993), RALB-a heuristic algorithm for design and balancing of robotic assembly line, Annals of the CIRP, 42, 497-500 https://doi.org/10.1016/S0007-8506(07)62494-9
- Runarsson, T. P. and Jonsson, M. T. (1999), Genetic production systems for intelligent problem solving, Journal of Intelligent Manufacturing, 10, 181-186 https://doi.org/10.1023/A:1008928804949
- Sabri, E. H. and Beamon, B. M. (2000), A multi-objective approach to simultaneous strategic and operational planning in supply chain design, Omega, 28, 581-598
- Sabuncuoglu, I., Erel, E., and Tanyer, M. (2000), Assembly line balancing using genetic algorithms, Journal of Intelligent Manufacturing, 11(3) 295-310 https://doi.org/10.1023/A:1008923410076
- Salveson, M. E. (1955), The assembly line balancing problem, Journal of Industrial Engineering, 6, 18-25
- Scholl, A. (1993), Data of Assembly Line Balancing Problems, Schriften zur Quantitativen Betriebswirtschaftslehre 16/93, Th Darmstadt
- Scholl, A. (1999), Balancing and Sequencing of Assembly Lines, Physica-Verlag, Heidelberg
- Scholl, A. and Becker, C. (2006), State-of-the-art exact and heuristic solution procedures for simple assembly line balancing, European Journal of Operational Research, 168, 666-693 https://doi.org/10.1016/j.ejor.2004.07.022
- Scholl, A. and Voss, S. (1996), Simple assembly line balancing-heuristic approaches, Journal of Heuristics, 2, 217-244 https://doi.org/10.1007/BF00127358
- Soukhal, A., Oulamara, A., and Martineau, P. (2005), Complexity of flow shop scheduling problems with transportation constraints, European Journal of Operational Research, 161, 32-41 https://doi.org/10.1016/j.ejor.2003.03.002
- Su, P., Wu, N., and Yu, Z. (2003) Resource selection for distributed manufacturing in agile manufacturing, Proc. of IEEE International Conference on Systems, Man and Cybernetics, 2(1), 1578-1582
- Suresh, G. and Sahu, S. (1994), Stochastic assembly line balancing using simulated annealing, International Journal of Production Research, 32(8), 1801-1810 https://doi.org/10.1080/00207549408957042
- Syam, S. S. (2002), A model and methodologies for the location problem with logistical components, Computers and Operations Research, 29, 1173-1193 https://doi.org/10.1016/S0305-0548(01)00023-5
- Syarif, A., Yun, Y., and Gen, M. (2002), Study on multi-stage logistics chain network : a spanning tree-based genetic algorithm approach, Computers and Industrial Engineering, 43, 299-314 https://doi.org/10.1016/S0360-8352(02)00076-1
- Talbot, F. B., Patterson, J. H., and Gehrlein, W. V. (1986), A comparative evaluation of heuristic line balancing techniques, Management Science, 32, 430 - 454 https://doi.org/10.1287/mnsc.32.4.430
- Tan, W. (2000), Integration of process planning and scheduling-a review, Journal of Intelligent Manufacturing, 11(1), 51-63 https://doi.org/10.1023/A:1008952024606
- Tan, W. (2004), A linearized polynomial mixed integer programming model for the integration of process planning and scheduling, Journal of Intelligent Manufacturing, 15(5), 593-605 https://doi.org/10.1023/B:JIMS.0000037710.80847.b6
- Tavakkoli-Moghaddam, R., Jolai, F., Vaziri, F., Ahmed, P. K., and Azaron, A. (2005), A hybrid method for solving stochastic job shop scheduling problems, Applied Mathematics and Computation, 170(1), 185-206 https://doi.org/10.1016/j.amc.2004.11.036
- Truong, T. H. and Azadivar, F. (2005), Optimal design methodologiesfor configuration of supply chains, International Journal of Production Research, 43(11), 2217-2236 https://doi.org/10.1080/00207540500031998
- Tsai, D. M. and Yao, M. J (1993), A line-balanced-base capacity planning procedure for series type robotic assembly line, International Journal of Production Research, 31, 1901-1920 https://doi.org/10.1080/00207549308956831
- W3C (2004), Extensible Markup Language (XML) 1.0 (3rd Edition), W3C Recommendation, [Online]. Available : http://www.w3.org/TR/2004/REC-xml-20040204
- Wu, Z. and Weng, M. X. (2005), Multiagent scheduling method with earliness and tardiness objectives in flexible job shops, IEEE Trans. System, Man, and Cybernetics-Part B, 35(2), 293-301 https://doi.org/10.1109/TSMCB.2004.842412
- Xia, W. and Wu, Z. (2005), An effective hybrid optimization approach for muti-objective flexible job-shop scheduling problem, Computers and Industrial Engineering, 48, 409-425 https://doi.org/10.1016/j.cie.2005.01.018
- Yan, H., Yu Z., and Cheng, T. C. E. (2003), A strategic model for supply chain design with logical constraints: formulation and solution, Computers and Operations Research, 30(14), 2135-2155 https://doi.org/10.1016/S0305-0548(02)00127-2
- Yang, J. B. (2001), GA-based discrete dynamic programming approach for scheduling in FMS environments, IEEE Transactions on Systems, Man and Cybernetics, Part B, 31(5), 824-835 https://doi.org/10.1109/3477.956045
- Yang, S. and Wang, D. (2000), Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling, IEEE Trans. on Neural Networks, 11(2), 474-486 https://doi.org/10.1109/72.839016
- Zhang, H. and Gen, M. (2005), Multistage-based genetic algorithm for flexible job-shop scheduling problem, Journal of Complexity International, 11, 223-232
- Zhang, H. P. (2006), Study on Evolutionary Scheduling Problems in Integrated Manufacturing System, Ph. D. dissertation, Waseda University, Japan