References
- Anderson, E. J. and Nyirenda, J. C. (1990), Two New Rules to Minimize Tardiness in a Job Shop, International Journal of Production Research 28(12), 2277-2292 https://doi.org/10.1080/00207549008942866
- Artigues, C., Dauzere-Peres, S., Derreumaux, A., Sibille, O., and Yugma, C. (2006), A Batch Optimization Solver for Diffusion Area Scheduling in Semiconductor Manufacturing, Proc. 2006 IFAC International Symposium on Information Control Problems in Manufacturing 727-732
- Caumond, A. and Lacomme, P. (2008), A Memetic Algorithm for the Job-shop with Time-lags, Computers and Operational Research 35(7), 2331-2356 https://doi.org/10.1016/j.cor.2006.11.007
- Chen, J. S. and Yang, J. S. (2006), Model Formulations for the Machine Scheduling Problem with Limited Waiting Time Constraints, Jornal of Information and Optimization Sciences 27(1), 225-240 https://doi.org/10.1080/02522667.2006.10699688
- Chern C. C. and Huang, K. L. (2004), A Heuristic Input Control Method for a Single-product, High-volume Wafer Fabrication Process to Minimize the Number of Photomask Changes, Journal of Manufacturing Systems 23(1), 30-45 https://doi.org/10.1016/S0278-6125(04)80005-0
- Chun, K.-W. and Hong, Y. (1996), Batch Sizing Heuristic for Batch Processing Workstations in Semiconductor Manufacturing, Journal of the Korean Institute of Industrial Engineers 22(2), 231-245
- Dabbas R. M. and Fowler, J. W. (2003), A New Scheduling Approach using Combined Dispatching Criteria in Wafer Fabs, IEEE Transactions on Semiconductor Manufacturing 16(3), 501-510 https://doi.org/10.1109/TSM.2003.815201
- Duwayri, Z., Mollaghasemi, M., Nazzal, D., and Rabadi, G. (2006), Scheduling Setup Changes at Bottleneck Workstations in Semiconductor Manufacturing, Production Planning and Control 17(7), 717-727 https://doi.org/10.1080/09537280600901426
- Fondrevelle, J., Oulamara, A., and Portmann, M. C. (2006), Permutation Flowshop Scheduling Problems with Maximal and Minimal Time Lags, Computers and Operations Research 33(6), 1540-1556 https://doi.org/10.1016/j.cor.2004.11.006
- Fowler, J. W., Hogg, G. L., and Phillips, D. T. (2000), Control of Multiproduct Bulk Server Diffusion/oxidation Processes. Part 2: Multiple Servers, IIE Transactions 32(2), 167-176
- Garey, M. R. and Johnson, D. S. (1975), Complexity Results for Multiprocessor Scheduling Under Resource Constraints, SIAM Journal on Computing 4(4), 397-411 https://doi.org/10.1137/0204035
- Glassey, C. R. and Weng, W. W. (1991), Dynamic Batching Heuristic for Simultaneous Processing, IEEE Transactions on Semiconductor Manufacturing 4(2), 77-82 https://doi.org/10.1109/66.79719
- Gurnani, H., Anupindi, R., and Akella, R. (1992), Control of Batch Processing Systems in Semiconductor Wafer Fabrication Facilities, IEEE Transactions on Semiconductor Manufacturing 5(4), 319-328 https://doi.org/10.1109/66.175364
- Hodson, A., Muhlemann A. P., and Price, D. H. R. (1985), A Microcomputer based Solution to a Practical Scheduling Problem, Journal of the Operational Research Society 36(10), 903-914 https://doi.org/10.1057/jors.1985.160
- Hsieh, B.-W., Chen, C.-H., and Chang, S.-C. (2001), Scheduling Semiconductor Wafer Fabrication by using Ordinal Optimizationbased Simulation, IEEE Transactions on Robotics and Automation 17(5), 599-608 https://doi.org/10.1109/70.964661
- Hung, Y. F. (1998), Scheduling of Mask Shop E-beam Writers. IEEE Transactions on Semiconductor Manufacturing 11(1), 165-172 https://doi.org/10.1109/66.661296
- Johri, P. K. (1993), Practical Issues in Scheduling and Dispatching in Semiconductor Wafer Fabrication, Journal of Manufacturing Systems 12(6), 474-485 https://doi.org/10.1016/0278-6125(93)90344-S
- Joo, B.-J. and Kim, Y.-D. (2009), A Branch and Bound Algorithm for a Two-machine Flowshop Scheduling Problem with Limited Waiting Time Constraints, Journal of the Operational Research Society 60(4), 572-582 https://doi.org/10.1057/palgrave.jors.2602598
- Kim, Y.-D., Bang J.-Y., An K.-Y., and Lim, S.-K. (2008), A Due-date based Algorithm for Lot-order Assignment in a Semiconductor Wafer Fabrication Facility, IEEE Transactions on Semiconductor Manufacturing 21(2), 209-216 https://doi.org/10.1109/TSM.2008.2000261
- Kim, Y.-D., Kim, J.-G., Choi, B., and Kim, H.-U. (2001), Production Scheduling in a Semiconductor Wafer Fabrication Facility Producing Multiple Product Types with Distinct Due Dates, IEEE Transactions on Robotics and Automation 17(5), 589-598 https://doi.org/10.1109/70.964660
- Kim, Y.-D., Kim, J.-U., Lim, S.-K., and Jun, H.-B. (1998a), Due-date Based Scheduling and Control Policies in a Multiproduct Semiconductor Wafer Fabrication Facility, IEEE Transactions on Semiconductor Manufacturing 11(1), 155-164 https://doi.org/10.1109/66.661295
- Kim, Y.-D., Lee, D.-H., Kim, J.-U., and Roh, H.-K. (1998b), A Simulation Study on Lot Release Control, Mask Scheduling and Batch Scheduling in Semiconductor Wafer Fabrication Facilities, Journal of Manufacturing Systems 17(2), 107-117 https://doi.org/10.1016/S0278-6125(98)80024-1
- Kim, Y.-D., Shim, S.-O., Choi, B., and Hwang, H. (2003), Simplification Methods for Accelerating Simulation-based Realtime Scheduling in a Semiconductor Wafer Fabrication Facility, IEEE Transactions on Semiconductor Manufacturing 16(2), 290-298 https://doi.org/10.1109/TSM.2003.811890
- Kim, S., Yea, S.-H., Kim, B. (2002), Shift Scheduling for Steppers in the Semiconductor Wafer Fabrication Process, IIE Transactions 34(2), 167-177
- Kumar, P. R. (1994), Scheduling Semiconductor Manufacturing Plants, IEEE Control Systems 14(6), 33-40 https://doi.org/10.1109/37.334413
- Lee, G.-C., Kim, Y.-D., Kim, J.-G., Choi, S.-H. (2003), A Dispatching Rule-based Approach to Production Scheduling in a Printed Circuit Board Manufacturing System, Journal of the Operational Research Society 54(1), 1038-1049 https://doi.org/10.1057/palgrave.jors.2601601
- Lee, Y. H., Park, J., and Kim, S. (2002), Experimental Study on Input and Bottleneck Scheduling for a Semiconductor Fabrication Line, IIE Transactions 34(2), 179-190
- Li, S., Tang, T., Collins, D. W. (1996), Minimum Inventory Variability Schedule with Applications in Semiconductor Fabrication, IEEE Transactions on Semiconductor Manufacturing 9(1), 145-149 https://doi.org/10.1109/66.484296
- Liao, D.-Y., Chang S.-C., Pei, K.-W., and Chang, C.-M. (1996), Daily Scheduling for R&D Semiconductor Fabrication, IEEE Transactions on Semiconductor Manufacturing 9(4), 550-561 https://doi.org/10.1109/66.542170
- Lu, S. C. H., Ramaswamy, D., and Kumar, P. R. (1994), Efficient Scheduling Policies to Reduce Mean and Variance of Cycletime in Semiconductor Manufacturing Plants, IEEE Transactions on Semiconductor Manufacturing 7(3), 374-388 https://doi.org/10.1109/66.311341
- Min, H.-S. and Yih, Y. (2003), Selection of Dispatching Rules on Multiple Dispatching Decision Points in Real-time Scheduling of a Semiconductor Wafer Fabrication System, International Journal of Production Research 41(16), 3921- 3941 https://doi.org/10.1080/0020754031000118099
- Robinson, J. K. and Giglio, R. (1999), Capacity Planning for Semiconductor Wafer Fabrication with Time Constraints between Operations, Proc. 1999 Winter Simulation Conference, 880-887
- Scholl, W. and Domaschke, J. (2000), Implementation of Modeling and Simulation in Semiconductor Wafer Fabrication with Time Constraints between Wet Etch and Furnace Operations, IEEE Transactions on Semiconductor Manufacturing 13(3) 273-277 https://doi.org/10.1109/66.857935
- Sheen, G. J. and Liao, L. W. (2007), A Branch and Bound Algorithm for the One-machine Scheduling Problem with Minimum and Maximum Time Lags, European Journal of Operational Research 181(1), 102-116 https://doi.org/10.1016/j.ejor.2006.06.003
- Sloan. T. and Shanthikumar, J. G. (2002), Using In-line Equipment Condition and Yield Information for Maintenance Scheduling and Dispatching in Semiconductor Wafer Fabs, IIE Transactions 34(2), 191-209
- Sourirajan, K., Uzsoy, R. (2007), Hybrid Decomposition Heuristics for Solving Large-scale Scheduling Problems in Semiconductor Wafer Fabrication, Journal of Scheduling 10(1), 41-65 https://doi.org/10.1007/s10951-006-0325-5
- Su, L.-H. (2003), A Hybrid Two-stage Flowshop with Limited Waiting Time Constraints, Computers and Industrial Engineering 44(3), 409-424 https://doi.org/10.1016/S0360-8352(02)00216-4
- Upasani, A. A., Uzsoy, R., and Sourirajan, K. (2006), A Problem Reduction Approach for Scheduling Semiconductor Wafer Fabrication Facilities, IEEE Transactions on Semiconductor Manufacturing 19(2), 216-225 https://doi.org/10.1109/TSM.2006.873510
- Wein, L. M. (1988), Scheduling Semiconductor Wafer Fabrication, IEEE Transactions on Semiconductor Manufacturing 1(3), 115-130 https://doi.org/10.1109/66.4384
- Weng, W. W. and Leachman, R. C. (1993), An Improved Methodology for Real-time Production Decisions at Batch-process Work Stations, IEEE Transactions on Semiconductor Manufacturing 6(3), 219-225 https://doi.org/10.1109/66.238169
- Wikum, E. D., Llewellyn, D. C., and Nemhauser, G. L. (1994), One-machine Generalized Precedence Constrained Scheduling Problems, Operations Research Letters 16(2), 87-99 https://doi.org/10.1016/0167-6377(94)90064-7
- Yang, D.-L. and Chern, M.-S. (1995), Two-machine Flowshop Sequencing Problem with Limited Waiting Time Constraints, Computers and Industrial Engineering 28(1), 63-70 https://doi.org/10.1016/0360-8352(94)00026-J
- Yildirim, M. B., Duman, E., and Duman, D. (2006), Dispatching Rules for Allocation of Component Types to Machines in the Automated Assembly of Printed Circuit Boards, Lecture Notes in Computer Science 4263(1), 55-64