Abstract
Gongneung Weir 2 was built in 1970s to supply water for irrigation. For a long time, the weir was left uncared because of the land use change of the nearby area. The weir is 1.5 m high, and the stream in which the weir was installed has bed materials of fine sands to fine gravels. In 2006, the local government and residents agreed on uninstalling the weir, and the weir was removed completely on April 14. This paper reports the results of three field investigations for the study of the stream morphology change after the weir removal. Changes in grain size distribution, bed elevation, and cross section before and after the weir removal are provided and discussed. Net amount of sediment deposits within 1 km reach of the stream is estimated, and the results illustrates that the sediment process, leading to an equilibrium of the bed, progressed very swiftly, namely within 45 days.
공릉2보는 농업용수의 공급을 위하여 1970년대에 설치되었다. 그러나 인근 지역의 토지 이용의 변화로 용도를 다하여 사용되지 않고 방치되어 있었다. 공릉2보는 높이 1.5 m의 소형 보 이며, 공릉천의 하상재료는 가는 모래에서 가는 자갈로 구성되어있다. 지자체와 지역 주민들과의 협의를 통하여 공릉2보는 2006년 4월 14일 완전히 철거되었다. 본 논문에서는 공릉2보 철거에 따른 하천형태학적인 변화를 조사하기 위한 연구를 수행하였다. 보 철거 전 후의 하상재료의 입도분포, 종단 하상고, 그리고 단면형의 변화가 고찰되었다. 보를 포함한 1 km 구간에서 순 퇴적량이 산정되었으며, 결과로부터 평형하상을 유도하는 유사이동 과정이 초반 45일동안 무척 빠르게 진행되었음을 보였다.