Special Cases on Two Machine Flow Shop Scheduling with Weighted WIP Costs

  • Yang, Jae-Hwan (School of Business Administration, University of Seoul)
  • Published : 2009.11.30

Abstract

In this paper, we consider a relatively new two-machine flow shop scheduling problem where the unit time WIP cost increases as a job passes through various stages in the production process, and the objective is to minimize the total WIP (work-in-process) cost. Specifically, we study three special cases of the problem. First, we consider the problem where processing times on machine 1 are identical. Second, the problem with identical processing times on machine 2 is examined. The recognition version of the both problems is unary NP-complete (or NP-complete in strong sense). For each problem, we suggest two simple and intuitive heuristics and find the worst case bound on relative error. Third, we consider the problem where the processing time of a job on each machine is proportional to a base processing time. For this problem, we show that a known heuristic finds an optimal schedule.

Keywords

References

  1. Adiri, I. and N. Amit, 'Openshop and flowshop scheduling to minimize sum of completion times,' Computers and Operations Research 11 (1984), 275-284 https://doi.org/10.1016/0305-0548(84)90016-9
  2. Allahverdi, A., 'Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness,' Computers and Operations Research 23 (1996), 909-916 https://doi.org/10.1016/0305-0548(96)00012-3
  3. Cheng, T. C. E. and N. Shakhlevich, 'Proportionate flow shop with controllable processing times,' Journal of Scheduling 2 (1999), 253-265 https://doi.org/10.1002/(SICI)1099-1425(199911/12)2:6<253::AID-JOS30>3.0.CO;2-R
  4. Choi, B.-C., S.-H. Yoon, and S.-J. Chung, 'Minimizing the total weighted completion time in a two-machine proportionate flow shop with different machine speeds,' International Journal of Production Research 44 (2006), 715-728 https://doi.org/10.1080/00207540500268780
  5. Conway, R. W., Maxwell, W. L., and Miller, L. W., Theory of scheduling, Addision-Wesley, Reading, MA, 1967
  6. Croce, F. D., M. Ghirardi, and R. Tadei, 'An improved branch-and-bound algorithm for the two machine total completion time flow shop problem,' European Journal of Operational Research 139, (2002), 293-301 https://doi.org/10.1016/S0377-2217(01)00374-5
  7. Croce, F. D., V. Narayan, and R. Tadei, 'The two-machine total completion time flow shop problem,' European Journal of Operational Research 90 (1996), 227-237 https://doi.org/10.1016/0377-2217(95)00351-7
  8. Garey, M. R, D. S. Johnson, and R. Sethi, 'The complexity of flowshop and jobshop scheduling,' Mathematics of Operations Research 1 (1976), 117-129 https://doi.org/10.1287/moor.1.2.117
  9. Gonzalez, T. and S. Sahni, 'Flowshop and job shop schedules: Complexity and approximation,' Operations Research 26 (1978), 36-52 https://doi.org/10.1287/opre.26.1.36
  10. Graham, R L., E. L. Lawler, J. K. Lenstra, and A. H. G. Rinnooy Kan, 'Optimization and approximation in deterministic sequencing and scheduling: A survey,' Annals of Discrete Mathematics 5 (1979), 287-326 https://doi.org/10.1016/S0167-5060(08)70356-X
  11. Hoogeveen, J. A. and T. Kawaguchi, 'Minimizing total completion time in a two-machine flowshop: analysis of special cases,' Mathematics of Operations Research 24 (1999), 887-910 https://doi.org/10.1287/moor.24.4.887
  12. Hou, S. X. and H. Hoogeveen, 'The three-machine proportionate flow shop problem with unequal machine speeds,' Operations Research Letters 31 (2003), 225-231 https://doi.org/10.1016/S0167-6377(02)00232-8
  13. Lee, W.-C. and C.-C. Wu, 'Minimizing the total flow time and tardiness in a two-machine flow shop,' International Journal of Systems Science 32 (2001), 365-373 https://doi.org/10.1080/002077201300029746
  14. Ow, P. S., 'Focused scheduling in proportionate flowshops,' Management Science 31 (1985), 852-869 https://doi.org/10.1287/mnsc.31.7.852
  15. Shakhlevich, N., H. Hoogeveen, and M. Pinedo, 'Minimizing total weighted completion time in a proportionate flow shop,' Journal of Scheduling 1 (1998), 157-168 https://doi.org/10.1002/(SICI)1099-1425(1998100)1:3<157::AID-JOS12>3.0.CO;2-Y
  16. Sipper, D. and R Shapira, 'JIT Vs. WIP-a trade-off analysis,' International Journal of Production Research 27 (1989), 903-914 https://doi.org/10.1080/00207548908942597
  17. van de Velde, S. L., 'Minimizing the sum of the job completion times in the two-machine flow shop by Lagrangian relaxation,' Annals of Operations Research 26 (1992), 257-268
  18. Vollman, T. E., W. L. Berry, and D. C. Whybark, Manufactuting planning and control systems, McGraw-Hill, New York, NY, 1997
  19. Wang, C., C. Chu, and J.-M. Proth, 'Efficient heuristic and optimal approaches for n / 2 / F / ${\Sigma}C_i$ scheduling problems,' International Journal of Production Economics 44 (1997), 225-237 https://doi.org/10.1016/0925-5273(96)00060-6
  20. Yang, J., 'Two machine flow shop scheduling problem with weighted WIP weight,' Computers and Operations Research 36 (2009), 472-486 https://doi.org/10.1016/j.cor.2007.09.014
  21. Yang, J. and M. E. Posner, 'Flow Shops with WIP and Value Added Costs,' Journal of Scheduling (2009), in press