참고문헌
- Akcah, Kazunori Nemoto and Reha Uzsoy(2001), "Cycle-time improvements for photolithography process in semiconductor manufacturing," IIEEE Transactions on Semiconductor Manufacturing, Vol. 14, No. 1, pp. 48-56 https://doi.org/10.1109/66.909654
- Chen, S. H.(2006), "fluidics of IC manufacturing maintaining work-in-process spread around workstation uniformly," master's thesis, Tung-Hai University, Taiwan
- Glassey C. R. and Resende, M. G. C.(1988a), "Closed-loop Job Release Control for VLSI Circuit Manufacturing," IEEE Transactions on Semiconductor Manufacturing, Vol. 1, No. 1, pp. 36-46 https://doi.org/10.1109/66.4371
- Glassey, C. R. and M. G. C. Resende(1988b), "A Scheduling Rule for Job Release in Semiconductor Fabrication," Operations Research Letters, Vol. 7, No. 5, pp. 213-217 https://doi.org/10.1016/0167-6377(88)90033-8
- Goldratt, Eliyahu M.(1990a), "The Theory of Constraints," The North River Press
- Goldratt, Eliyahu M.(1990b), "What is the thing called theory of constraints and how should it be implemented," North River Press
- Goldratt, Eliyahu M., Eli schragenheim, and Carol A. Ptak(2000), "Necessary but not sufficient," The North River Press
- Goldratt, Eliyahu M.(2006), "The Strategy and Tactic trees-Consumer Goods-Viable Vision implementations," TOC Insights 2006
- Hsu, F. N.(2007), "Flow control design of IC manufacturing accelerating wafer flow to bottleneck zone," master's thesis, Tung-Hai University, Taiwan
- Huang, C. L.(1998), "analysis on bottleneck shifting and research on its management game," master's thesis, Department of Industrial Engineering and Management, National Chiao-Tung University, Taiwan
- Hung, Y. F. and R. C. Leachman(1996), "A production planning methodology for semiconductor manufacturing based on interactive simulation and linear programming calculation," IEEE Transactions on Semiconductor Manufacturing, Vol. 9, No. 2, pp. 257-269 https://doi.org/10.1109/66.492820
- Lawton, J. W., Drake, A., Henderson, R., Wein, L. M., Whitney, R., and Zuanich, D.(1990), "Workload Regulating Wafer Release in a GaAs Fab Facility," IEEE Int'l Semiconductor Manufacturing Science Symposium, pp. 33-88
- Leachman, Robert. C. and David A. Hodges(1996), "Benchmarking semiconductor manufacturing," IEEE Transactions on Semiconductor Manufacturing, Vol. 9, No. 2, pp. 158-169 https://doi.org/10.1109/66.492810
- Levitt, M. E. and J. A. Abraham(1990), "Just-In-Time Methods for Semiconductor Manufacturing," IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 3-9
- Lou, S. and P. W. Kager(1989), "A Robust Production Control Policy for VLSI Wafer Fabrication," IEEE Transactions on Semiconductor Manufacturing, Vol. 2, No. 4, pp. 159-164 https://doi.org/10.1109/66.44620
- Lu, J. J.(2004), "Release and dispatching technology of IC manufacturing oriented production plan," master's thesis, Tung-Hai University, Taiwan
- Malmstrom, C.(1997), "Though Love: Real-time Planning and Scheduling at Philips Semiconductor," Manufacturing System, pp. 76-78
- Miller, D. J.(1990), "Simulation of a semiconductor manufacturing line," Communication of The ACM, Vol. 33, No. 10, pp. 99-109 https://doi.org/10.1145/92755.92772
- Spearman, M. L., David L. woodruff, and Wallace J. Hopp(1990), "CONWIP: A Pull Alternative to Kanban," International Journal of Production Research, Vol. 28, No. 5, pp. 879-894 https://doi.org/10.1080/00207549008942761
- Tu, Y. M.(1998), "work-in-process management mode of wafer manufactory," master's thesis, Department of Industrial Engineering and Management, National Chiao-Tung University, Taiwan
- Uzsoy, R., C. Y. Lee and L. A. Martin-Vega(1992), "A review of production planning and scheduling models in the semiconductor industry. Part I: system characteristics, performance evaluation and production planning," IIE Transaction, Vol. 24, No. 4, pp. 47-60 https://doi.org/10.1080/07408179208964233
- Uzsoy, R., C. Y. Lee, and L. A. Martin-Vega(1994), "A review of production planning and scheduling models in the semiconductor industry. Part II: shop-floor control," IIE Transaction, Vol. 26, No. 5, pp. 44-55
- Wein, L. M.(1988), "Scheduling Semiconductor Wafer Fabrication," IEEE Transactions on Semiconductor Manufacturing, Vol. 1, No. 3, pp. 115-130 https://doi.org/10.1109/66.4384
- Wu, H. H. and Li, R. K.(2003), "Drum-Buffer-Rope Scheduling and management technology," Chuan-Hua Technology Books, Taiwan