The Study of the Cycle Time Improvement by Work-In-Process Statistical Process Control Method for IC Foundry Manufacturing

  • Lin, Yu-Cheng (Department of Industrial Engineering and Management National Chiao-Tung University) ;
  • Tsai, Chih-Hung (Department of Industrial Engineering and Management Ta-Hwa Institute of Technology) ;
  • Li, Rong-Kwei (Department of Industrial Engineering and Management National Chiao-Tung University) ;
  • Chen, Ching-Piao (Department of Industrial Engineering and Management Ta-Hwa Institute of Technology) ;
  • Chen, Hsien-Ching (Center for General Education, Chung-Hua University)
  • Published : 2008.12.31

Abstract

The definition of cycle time is the time from the wafer start to the wafer output. It usually takes one or two months to get the product since customer decides to produce it. The cycle time is a critical factor for customer satisfaction because it represents the response time to the market. Long cycle time reflects the ineffective investment for the capital. The cycle time is very important for foundry because long cycle time will cause customer unsatisfied and the order loss. Consequently, all of the foundries put lots of human source in the cycle time improvement. Usually, we make decisions based on the experience in the cycle time management. We have no mechanism or theory for cycle time management. We do work-in-process (WIP) management based on turn rate and standard WIP (STD WIP) set by experiences. But the experience didn't mean the optimal solution, when the situation changed, the cycle time or the standard WIP will also be changed. The experience will not always be applicable. If we only have the experience and no mechanism, management will not be work out. After interview several foundry fab managers, all of the fab can't reflect the situation. That is, all of them will have an impact period after product mix or utilization varied. In this study, we want to develop a formula for standard WIP and use statistical process control (SPC) concept to set WIP upper/lower limit level. When WIP exceed the limit level, it will trigger action plans to compensate WIP Profile. If WIP Profile balances, we don't need too much WIP. So WIP level could be reduced and cycle time also could be reduced.

Keywords

References

  1. Akcah, Kazunori Nemoto and Reha Uzsoy(2001), "Cycle-time improvements for photolithography process in semiconductor manufacturing," IIEEE Transactions on Semiconductor Manufacturing, Vol. 14, No. 1, pp. 48-56 https://doi.org/10.1109/66.909654
  2. Chen, S. H.(2006), "fluidics of IC manufacturing maintaining work-in-process spread around workstation uniformly," master's thesis, Tung-Hai University, Taiwan
  3. Glassey C. R. and Resende, M. G. C.(1988a), "Closed-loop Job Release Control for VLSI Circuit Manufacturing," IEEE Transactions on Semiconductor Manufacturing, Vol. 1, No. 1, pp. 36-46 https://doi.org/10.1109/66.4371
  4. Glassey, C. R. and M. G. C. Resende(1988b), "A Scheduling Rule for Job Release in Semiconductor Fabrication," Operations Research Letters, Vol. 7, No. 5, pp. 213-217 https://doi.org/10.1016/0167-6377(88)90033-8
  5. Goldratt, Eliyahu M.(1990a), "The Theory of Constraints," The North River Press
  6. Goldratt, Eliyahu M.(1990b), "What is the thing called theory of constraints and how should it be implemented," North River Press
  7. Goldratt, Eliyahu M., Eli schragenheim, and Carol A. Ptak(2000), "Necessary but not sufficient," The North River Press
  8. Goldratt, Eliyahu M.(2006), "The Strategy and Tactic trees-Consumer Goods-Viable Vision implementations," TOC Insights 2006
  9. Hsu, F. N.(2007), "Flow control design of IC manufacturing accelerating wafer flow to bottleneck zone," master's thesis, Tung-Hai University, Taiwan
  10. Huang, C. L.(1998), "analysis on bottleneck shifting and research on its management game," master's thesis, Department of Industrial Engineering and Management, National Chiao-Tung University, Taiwan
  11. Hung, Y. F. and R. C. Leachman(1996), "A production planning methodology for semiconductor manufacturing based on interactive simulation and linear programming calculation," IEEE Transactions on Semiconductor Manufacturing, Vol. 9, No. 2, pp. 257-269 https://doi.org/10.1109/66.492820
  12. Lawton, J. W., Drake, A., Henderson, R., Wein, L. M., Whitney, R., and Zuanich, D.(1990), "Workload Regulating Wafer Release in a GaAs Fab Facility," IEEE Int'l Semiconductor Manufacturing Science Symposium, pp. 33-88
  13. Leachman, Robert. C. and David A. Hodges(1996), "Benchmarking semiconductor manufacturing," IEEE Transactions on Semiconductor Manufacturing, Vol. 9, No. 2, pp. 158-169 https://doi.org/10.1109/66.492810
  14. Levitt, M. E. and J. A. Abraham(1990), "Just-In-Time Methods for Semiconductor Manufacturing," IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 3-9
  15. Lou, S. and P. W. Kager(1989), "A Robust Production Control Policy for VLSI Wafer Fabrication," IEEE Transactions on Semiconductor Manufacturing, Vol. 2, No. 4, pp. 159-164 https://doi.org/10.1109/66.44620
  16. Lu, J. J.(2004), "Release and dispatching technology of IC manufacturing oriented production plan," master's thesis, Tung-Hai University, Taiwan
  17. Malmstrom, C.(1997), "Though Love: Real-time Planning and Scheduling at Philips Semiconductor," Manufacturing System, pp. 76-78
  18. Miller, D. J.(1990), "Simulation of a semiconductor manufacturing line," Communication of The ACM, Vol. 33, No. 10, pp. 99-109 https://doi.org/10.1145/92755.92772
  19. Spearman, M. L., David L. woodruff, and Wallace J. Hopp(1990), "CONWIP: A Pull Alternative to Kanban," International Journal of Production Research, Vol. 28, No. 5, pp. 879-894 https://doi.org/10.1080/00207549008942761
  20. Tu, Y. M.(1998), "work-in-process management mode of wafer manufactory," master's thesis, Department of Industrial Engineering and Management, National Chiao-Tung University, Taiwan
  21. Uzsoy, R., C. Y. Lee and L. A. Martin-Vega(1992), "A review of production planning and scheduling models in the semiconductor industry. Part I: system characteristics, performance evaluation and production planning," IIE Transaction, Vol. 24, No. 4, pp. 47-60 https://doi.org/10.1080/07408179208964233
  22. Uzsoy, R., C. Y. Lee, and L. A. Martin-Vega(1994), "A review of production planning and scheduling models in the semiconductor industry. Part II: shop-floor control," IIE Transaction, Vol. 26, No. 5, pp. 44-55
  23. Wein, L. M.(1988), "Scheduling Semiconductor Wafer Fabrication," IEEE Transactions on Semiconductor Manufacturing, Vol. 1, No. 3, pp. 115-130 https://doi.org/10.1109/66.4384
  24. Wu, H. H. and Li, R. K.(2003), "Drum-Buffer-Rope Scheduling and management technology," Chuan-Hua Technology Books, Taiwan