Acknowledgement
Supported by : LG연암문화재단
References
- Bahri, N., Reiss, J., Doherty, B. (2001), A comparison of unified vs. segregated automated material handling systems for 300mm fabs, IEEE International Symposium on Semiconductor Manufacturing Conference, 3-6
- Chand, S., Traub, R., and Uzsoy, R. (1997), Rolling Horizon Procedures for the Single Machine Deterministic Total Completion Time Scheduling Problem with Release Dates, Annals of Operations Research, 70, 115-125 https://doi.org/10.1023/A:1018961818782
- Engell, S., Kuhn, T., and Moser, M. (1990), On Decentralized On-line Scheduling of FMS, Proceedings of the 29th IEEE Conference on Decision and Control, Honolulu, Hawaii, 125-127
- Ferland, A., Fortin, L., (1989), Vehicle scheduling with sliding time windows, European Journal of Operational Research, 38, 213-226 https://doi.org/10.1016/0377-2217(89)90106-9
- Gartland, K., Godding, G., Hodges, B., Muzumbar, N., Hohkibara, S., Kono, S., Honma, M., Inoue, G. (2000), Scheduler/dispatcher user requirements. International SEMATECH, Technology Transfer # 00063966A-TR
- Glassey, C. R. and Resende, M. G. C. (1988), Closed-loop job release control for VLSI circuit manufacturing, IEEE Transactions on semiconductor manufacturing, 1(1), 36-46 https://doi.org/10.1109/66.4371
- Jang, J., Suh, J., and Ferreira, P. (2001a), An AGV routing policy reflecting the current and future state of semiconductor and LCD production lines, International Journal of Production Research, 39(17), 3901-3921 https://doi.org/10.1080/00207540110056261
- Jang, J., Suh, J., and Liu, C. R. (2001b), A Look-Ahead Routing Procedure for Machine Selection in a Highly Informative Manufacturing System, International Journal of Flexible Manufacturing Systems, 13(3), 287-308 https://doi.org/10.1023/A:1011199619582
- Koo, P.-H, Jang, J. and Suh, J. (2005), Vehicle dispatching for highly loaded semiconductor production considering bottleneck machines first, International Journal of Flexible Manufacturing Systems, 17 (1), 23-38 https://doi.org/10.1007/s10696-005-5992-6
- Koskosidis, Y. A., Powell, W. B., Solomon, M. M., (1992), An optimization- based heuristic for vehicle routing and scheduling with soft time window constraints, Transportation Science, 26(2), 69-85 https://doi.org/10.1287/trsc.26.2.69
- Lou, S. X. C. and Kager, P. W. (1989), A Robust production control policy for VLSI wafer fabrication, IEEE Transactions on semiconductor manufacturing, 2(4), 159-164 https://doi.org/10.1109/66.44620
- Lu, S. C. H., Ramaswamy, D., and Kumar, P. R. (1994), Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants, IEEE Transactions on Semiconductor Manufacturing, 7(3), 374-388 https://doi.org/10.1109/66.311341
- Sexton, T.R. and Choi, Y., (1986), Pickup and delivery of partial loads with soft time windows, American Journal of Mathematical and Management Science, 6, 369-398
- Smith, T. M. and Stecke, K. E. (1996), On the Robustness of Using Balanced Part Mix Ratios to Determine Cycle Part Input Sequences into Flexible Flow Systems, International Journal of Production Research, 34(10), 2925-2942 https://doi.org/10.1080/00207549608905066
- Suh, J., Jang, J., and Koo, P. H. (2003), Development of a Look-ahead AGV controller for a clean bay operation, International Journal of Industrial Engineering, 10(4), 547-554
- Taillard, E., Badeau, P., Gendreau, M., Guertin, F., Potvin, J.-Y., (1997), A tabu search heuristic for the vehicle routing problem with soft time windows, Transportation Science, 31(2), 170-186 https://doi.org/10.1287/trsc.31.2.170
- Uzsoy, R., Lee, C. Y. and Martin-vega, A. L. (1992), A review of production planning and scheduling models in the semiconductor industry part1 : system characteristics, performance evaluation and production planning, IIE Transactions, 24(4), 47-60 https://doi.org/10.1080/07408179208964233
- Vargas-Vilamil, F. D., Rivera, D. E. and Kempf, K. G. (2003), A hierarchical approach to production control of reentrant semiconductor manufacturing lines, IEEE Transactions on control systems technology, 11(4), 578-87 https://doi.org/10.1109/TCST.2003.813368
- Wein, L. M. (1988), Scheduling semiconductor wafer fabrication, IEEE Transactions on Semiconductor Manufacturing, 1(3), 115-130 https://doi.org/10.1109/66.4384