1 |
Ferland, A., Fortin, L., (1989), Vehicle scheduling with sliding time windows, European Journal of Operational Research, 38, 213-226
DOI
ScienceOn
|
2 |
Glassey, C. R. and Resende, M. G. C. (1988), Closed-loop job release control for VLSI circuit manufacturing, IEEE Transactions on semiconductor manufacturing, 1(1), 36-46
DOI
|
3 |
Sexton, T.R. and Choi, Y., (1986), Pickup and delivery of partial loads with soft time windows, American Journal of Mathematical and Management Science, 6, 369-398
|
4 |
Suh, J., Jang, J., and Koo, P. H. (2003), Development of a Look-ahead AGV controller for a clean bay operation, International Journal of Industrial Engineering, 10(4), 547-554
|
5 |
Uzsoy, R., Lee, C. Y. and Martin-vega, A. L. (1992), A review of production planning and scheduling models in the semiconductor industry part1 : system characteristics, performance evaluation and production planning, IIE Transactions, 24(4), 47-60
DOI
ScienceOn
|
6 |
Bahri, N., Reiss, J., Doherty, B. (2001), A comparison of unified vs. segregated automated material handling systems for 300mm fabs, IEEE International Symposium on Semiconductor Manufacturing Conference, 3-6
|
7 |
Engell, S., Kuhn, T., and Moser, M. (1990), On Decentralized On-line Scheduling of FMS, Proceedings of the 29th IEEE Conference on Decision and Control, Honolulu, Hawaii, 125-127
|
8 |
Koskosidis, Y. A., Powell, W. B., Solomon, M. M., (1992), An optimization- based heuristic for vehicle routing and scheduling with soft time window constraints, Transportation Science, 26(2), 69-85
DOI
|
9 |
Lou, S. X. C. and Kager, P. W. (1989), A Robust production control policy for VLSI wafer fabrication, IEEE Transactions on semiconductor manufacturing, 2(4), 159-164
DOI
ScienceOn
|
10 |
Chand, S., Traub, R., and Uzsoy, R. (1997), Rolling Horizon Procedures for the Single Machine Deterministic Total Completion Time Scheduling Problem with Release Dates, Annals of Operations Research, 70, 115-125
DOI
|
11 |
Lu, S. C. H., Ramaswamy, D., and Kumar, P. R. (1994), Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants, IEEE Transactions on Semiconductor Manufacturing, 7(3), 374-388
DOI
ScienceOn
|
12 |
Taillard, E., Badeau, P., Gendreau, M., Guertin, F., Potvin, J.-Y., (1997), A tabu search heuristic for the vehicle routing problem with soft time windows, Transportation Science, 31(2), 170-186
DOI
ScienceOn
|
13 |
Jang, J., Suh, J., and Liu, C. R. (2001b), A Look-Ahead Routing Procedure for Machine Selection in a Highly Informative Manufacturing System, International Journal of Flexible Manufacturing Systems, 13(3), 287-308
DOI
ScienceOn
|
14 |
Smith, T. M. and Stecke, K. E. (1996), On the Robustness of Using Balanced Part Mix Ratios to Determine Cycle Part Input Sequences into Flexible Flow Systems, International Journal of Production Research, 34(10), 2925-2942
DOI
ScienceOn
|
15 |
Wein, L. M. (1988), Scheduling semiconductor wafer fabrication, IEEE Transactions on Semiconductor Manufacturing, 1(3), 115-130
DOI
|
16 |
Vargas-Vilamil, F. D., Rivera, D. E. and Kempf, K. G. (2003), A hierarchical approach to production control of reentrant semiconductor manufacturing lines, IEEE Transactions on control systems technology, 11(4), 578-87
DOI
ScienceOn
|
17 |
Koo, P.-H, Jang, J. and Suh, J. (2005), Vehicle dispatching for highly loaded semiconductor production considering bottleneck machines first, International Journal of Flexible Manufacturing Systems, 17 (1), 23-38
DOI
|
18 |
Gartland, K., Godding, G., Hodges, B., Muzumbar, N., Hohkibara, S., Kono, S., Honma, M., Inoue, G. (2000), Scheduler/dispatcher user requirements. International SEMATECH, Technology Transfer # 00063966A-TR
|
19 |
Jang, J., Suh, J., and Ferreira, P. (2001a), An AGV routing policy reflecting the current and future state of semiconductor and LCD production lines, International Journal of Production Research, 39(17), 3901-3921
DOI
ScienceOn
|