Probabilistic Safety Analysis of Cable-Stayed Bridge Using Measured Data

계측데이터를 이용한 사장교의 확률적 안전도 분석

  • 윤만근 (삼성건설 토목사업본부, 한양대학교 토목공학과) ;
  • 조효남 (한양대학교)
  • Received : 2008.01.10
  • Published : 2008.05.30

Abstract

In this paper, through the study and consideration of the recently prominent monitoring of cable stayed-bridge, practical but reasonable suggested for the evaluation of the probabilistic safety of the bridges using probable measured data from monitoring measurement system. It is shown in the paper that the live load effects can be evaluated using measured data of cable-stayed bridge and this the realistic probabilistic safety of the cable-stayed bridge could be assessed in term of element reliability and system reliability. As a practical method for the evalution of the system reliability of system cable-stayed bridges partial ETA method is uesd, which can find the critical failure path including combined failure modes of cable, deck and pylon. Compared with the conventional safety analysis method, the propsed approach may be considered as the practical method that shows the considerably actual and reasonable results the system redundancy of the structure.

본 논문에서는 최근 유지관리분야에서 중요한 분야로 대두되고 있는 대형구조물의 모니터링에 대한 연구 및 고찰을 바탕으로 대형 구조물의 계측데이터를 이용한 확률적 안전도분석에 대한 평가 모형을 제안하였다. 사장교의 계측 데이터를 이용하여 활하중에 대한 모델을 산정하고, 요소신뢰성 및 체계신뢰성 기법을 통하여 사장교의 실질적인 확률적 안전도를 평가하였다. 사장교의 체계신뢰성은 케이블, 보강형, 주탑의 조합파괴를 포함하는 주파괴경로를 찾아낼 수 있는 부분 ETA(Event Tree Analysis) 모델을 이용하여 산정하였으며 이는 기존 안전도 분석방법과 비교하였을 때 구조물의 여용성을 충분히 반영하는 데 상당히 합리적이며 실제적인 결과를 보여주는 실용적인 방법으로 판단된다.

Keywords

References

  1. 조효남, '체계신뢰성 방법에 기초한 도로교 설계규준 개발 및 기설교량의 신뢰성평가', 871-1301-007-2구조, 한국과학재단, 1989
  2. 조효남, 임종권, 박경훈, '체계신뢰성방법에 기초한 강사장교의 안전도평가', 전산구조공학회 논문집, 제11권 4호, 1998, pp. 351-360
  3. AASHTO(American Association of State Highway and Transportation Officials), 'Bridge Design Specifications', AASHTO, Wahington, D.C, 2004
  4. Ang, A.H-S & Bennett, R.M, 'Formulations of structural system reliability.', Journal of Structure Eng., ASCE, Vol. 112, No. 11, 1986, pp. 1135-1151
  5. Ang, A.H-S & Tang, W.H, 'Probability concepts in engineers in engineering planning and design', Vol. I, II, John Wiley & Sons Inc., New York., 1984
  6. Cho, H.N, & Ang, A.H-S, 'Reliability assessment and reliability-based rating of existing road bridges', Proceeding, 5th International Conf. on Sturt. Safety and Reliability(ICOSSAR '89), San Francisco, California, USA, 1989, pp. 2235-2238
  7. Frangopol, D.M., & Curley, J.P., 'Effects of damage and redundancy on structural reliability', Journal of Structure Eng., ASCE, Vol. 113, No.7, 1987, pp. 1533-1549 https://doi.org/10.1061/(ASCE)0733-9445(1987)113:7(1533)
  8. NCHRP report 454, 'Calibration of Load Factors for LRFR Bridge Evaluation', TRB, National Research Council, Washington, D.C, 2001
  9. Nowak, A.S., & Collins, K.R., 'Reliability of structures', McGraw Hill, 2000
  10. Rackwitz, R., & Fiessler, B. 'Structural reliability under combined random load sequences.', Journal of Computers & Structures, Vol. 9, 1978, pp. 489-494 https://doi.org/10.1016/0045-7949(78)90046-9