An Administration Model for Causation of the Schedule Delays in Construction Projects

건설공사 공기연장사유 관리모델

  • Published : 2007.06.30

Abstract

If project time extension were required in the construction projects, either liquidated damages or extension costs should be applied according to causation of the schedule delays. However, in actual cases it is not applied so far according to the contract conditions. The reason why this situation happened Is that function of the present planning and scheduling is not working feasibly. The CPM schedule could not provide a proper solution for apportioning responsibility for the schedule delays. This situation could be considered as breach of contract and will cause potential disputes for schedule delay. Therefore, in this research process based contract administration model for construction delay claim is proposed to prevent schedule delay and solve the claims. The model is based on pro-active management for causation of delay to provide apportionment of responsibility and written evidences.

건설공사 계약에서 공기연장 시에는 계약당사자의 귀책에 따라 지체상금의 부과 내지는 연장비용을 지급토록 규정하고 있으나, 그 이행에 있어 당사자의 정량적 귀책구분 등 분석결과에 의해 전형적으로 이행되는 경우는 거의 없다고 할 수 있다. 결국 이는 수행참여자의 계약적 의무이행에 대한 책임회피이며, 향후 잠재된 공기연장클레임 등 더 많은 시간과 비용을 지불해야 하는 분쟁으로 비화될 것은 자명하다 할 것이다. 그 원인으로는 현행의 CPM 네트워크공정표에 의한 공정관리 방법 이 수동적이고 사후적 인 관리로서 공기 연장이 발생한 후, 그 사유 및 기간의 책임분석을 통한 관리로 그 한계성으로 인하여 연장예방 및 클레임해결이 불가능한 것이다. 따라서 본 연구에서는 현행 계약자들의 공정관리 수준을 고려하고, 공기연장의 핵심이라 할 수 있는 연장사유에 대한 사전관리를 통한 프로세스 접근방식(Process Approach)의 공기연장사유 관리모델을 제시하여 프로젝트 수행 당사자의 책임의식 고취와 책임관리, 사전관리, 증거관리를 능동적으로 수행 가능할 수 있게 하여, 공기 연장예방 및 당사자의 원만한 클레임해결을 위한 관리기준 모델을 제시하는 것이다.

Keywords

References

  1. 구자민, 이재섭, '생산성을 고려한 공기지연분석방법', 대한건축학회논문집 20권 4호, 2004
  2. 김재욱외 1인, '국내 회계예규상의 공기지연 클레임 관련사항 의 개선방안', 한국건설관리학회 학술발표대회 논문집, 2002
  3. 김영재외 3인, '건설공사 공기지연클레임의 분석방법에 관한 연구', 대한건축학회논문집 구조계 15권7호(통권129호) (1999-7)
  4. 모용운외 2인, '국내 공공건설공사 공기지연분석모델 개발', 대한건축학회 논문집(구조계), 18(2), 131-138
  5. 이상범, '공정균형개념을 적용한 공기산정방법에관한 연구', 대한건축학회논문집 구조계 V.17 n,9, 2001
  6. 윤성민외 3인, 경부고속철도 건설사업의 공기지연분석에 관한연구
  7. 이재섭, 건설공사의 공기연장분석기준, 한국건설산업연구원, 1999
  8. 이재섭, 계약당사자 모두에게 책임이있는 공기지연의 해석방 법, 대한건축학회논문집 통권202호, 2005
  9. 이정호외 3인, 웹기반의 공기지연클레임 분석모형 구축에 관 한 연구, 대한건축학회논문집 통권170호, 2002
  10. 조훈희외 2인, 공기연장 실태조사를 통한 발주자중심 공기지연 리스크 대응방안(공공발주 공동주택대상으로), 대한건축학회논문집 통권158호, 2001
  11. 주해금외 2인, '위험관리 중심의 공정관리모델', 한국건설관리학회논문집 제6권 제6호, 2005
  12. 한종관외 2인, / 시공자 중심의 주요 공종별 공기지연 원인 분석에 관한 연구, 대한건축학회논문집 통권173호, 2003
  13. Abdul-Malak, M. Asem U, Process Model for Administrating Construction Claims, journal of management in engineering, 2002, 4
  14. Cheung Sai On, Are Construction Disputes Inevitable?, IEEE transactions on engineering management, vol. 53, no. 3, 2006, 8
  15. Departmeny of army, Office of the Chief of Engineers' Modification Impact Evaluation Guide, Ep-415-3
  16. FIDIC, Constructions of Contract for Construction, 1999
  17. Kelleher, T.H., 'Common Sense Construction Law', 3rd Ed., John Wiley & Sons, Inc., 2005
  18. Kim Youngjae, Delay Analysis Method Using Delay Section, Journal of Construction Engineering and Management, 2005, 11
  19. Schumacher, L., Quantifying and Apportioning Delay on Construction Projects, Cost Engineering, 37(2), 11- 13
  20. Shi Jonathan Jingsheng, Construction Delay Computation Method, Journal of Construction Engineering and Management 2001, 1
  21. Veterans Admin, VACPM Handbook H-08-11
  22. Yates J. K, Avoiding and Minimizing Construction Delay Claim Disputes in Relational Contracting, Journal of Professional Issues in Engineering Education and Practice, 2006, 4
  23. Zark James G. Jr., 'Claim Prevention: Offence versus Defense', Cost Engineering, Vol. 39, No. 7, 1997