Maintenance Staff Scheduling at Afam Power Station

  • Alfares, H.K. (Mechanical Engineering Department King Fahd University of Petroleum and Minerals) ;
  • Lilly, M.T. (Mechanical Engineering Department Rivers State University of Science and Technology) ;
  • Emovon, I. (Mechanical Engineering Department Rivers State University of Science and Technology)
  • 발행 : 2007.06.30

초록

This paper describes the optimization of maintenance workforce scheduling at Afam power station in Nigeria. The objective is to determine the optimum schedule to satisfy growing maintenance labour requirements with minimum cost and highest efficiency. Three alternative maintenance workforce schedules are compared. The first alternative is to continue with the traditional five-day workweek schedule currently being practiced by Afam power station maintenance line. The second alternative is to switch to a seven-day workweek schedule for the morning shift only. The third alternative is to use a seven-day workweek schedule for all three work shifts. The third alternative is chosen, as it is expected to save 11% of the maintenance labour cost.

키워드

참고문헌

  1. Ahire, S., Greenwood, G., Gupta, A., and Terwilliger, M. (2000), Workforce-constrained preventive maintenance scheduling using evolution strategies, Decision Sciences, 31, 833-859. https://doi.org/10.1111/j.1540-5915.2000.tb00945.x
  2. Alfares, H. K. (2001), Efficient optimization of cyclic labour days-off scheduling, OR Spectrum, 23, 283-294. https://doi.org/10.1007/PL00013353
  3. Alfares, H. K. (1999), Aircraft Maintenance Workforce Scheduling, Journal of Quality in Maintenance Engineering, 5, 78-87. https://doi.org/10.1108/13552519910271784
  4. Alfares, H. K. (1998), An efficient two-phase algorithm for cyclic days-off scheduling. Computers & Operations Research, 25, 913-924. https://doi.org/10.1016/S0305-0548(98)00033-1
  5. Bard, J. F., Binici, C., and Desilva, A. H. (2003), Staff Scheduling at the United States Postal Service, Computers & Operations Research, 30, 745-771. https://doi.org/10.1016/S0305-0548(02)00048-5
  6. Caprara, A., Monaci, M., and Toth, P. (2003), Models and algorithms for a staff scheduling problem. Mathematical Programming, 98, 445-476. https://doi.org/10.1007/s10107-003-0413-7
  7. Coleman, R. M. (1995), Cost effective shift schedules enhance utility operations, Power Engineering, 99, 27-29.
  8. Brusco, M. J. and Johns, T. R. (1998), Staffing a multiskilled workforce with varying levels of productivity: An analysis of cross-training policies, Decision Sciences, 29, 499-515. https://doi.org/10.1111/j.1540-5915.1998.tb01586.x
  9. Burns, R. N. and Carter, M. W. (1985), Workforce size and single-shift schedules with variable demands, Management Science, 31, 599-607. https://doi.org/10.1287/mnsc.31.5.599
  10. Duffuaa, S. O. and Al-Sultan, K. S. (1999), A stochastic programming model for scheduling maintenance personnel, Applied Mathematical Modelling, 23, 385-397. https://doi.org/10.1016/S0307-904X(98)10009-4
  11. Emmons, H. and Fuh, D.-S. (1997), Sizing and scheduling a full-time and part-time workforce with offday and off-weekend constraints, Annals of Operations Research, 70, 473-492. https://doi.org/10.1023/A:1018998826960
  12. Ernst, A. T., Jiang, H., Krishnamoorthy, M., and Sier, D. (2004), Staff scheduling and rostering: a review of applications, methods, and models, European Journal of Operational Research, 153, 3-27. https://doi.org/10.1016/S0377-2217(03)00095-X
  13. Hung, R. (2006), Using compressed workweeks to save labour cost, European Journal of Operational Research, 170, 319-322. https://doi.org/10.1016/j.ejor.2004.09.043
  14. Roberts, S. M. and Escudero, L. F. (1983), Scheduling of plant maintenance personnel, Journal of Optimization Theory and Applications, 39, 323-343. https://doi.org/10.1007/BF00934541
  15. Vohra, R. V. (1987), The cost of consecutivity in the (5,7) cyclic staffing problem, IIE Transactions, 29, 942-950.