Abstract
While sludge settles down in a column, sludge settling characteristic is influenced by effect parameters, interparticle force, wall effect etc. As the height of a column changes, the settling velocity of sludge-water interface changes, too. At lower sludge concentration, particular effect was not observed by the difference of column height, however it was observed that settleability of sludge was greatly influenced by column height when sludge settling was poor or sludge concentration was high. It is therefore required to consider the effect of column height when the power model for sludge interface settling is established. In the tests, there was hardly any $SVI_{ts}$(SVI after "t" minutes) difference in each column after 10min at $1.5kg/m^3$ of sludge concentration. When sludge concentration was at $2.5kg/m^3$, $SVI_{ts}$ tended to be constant after 20min. At $3.5kg/m^3$, $SVI_{ts}$ increased to 30minuets. The purpose of this work is to establish the correction factor that is able to compensate the errors derived from each different height of column.