A Study of Analyzing Claim Factor and Making Strategies to Prevent Claim in Early Stage for Architectural Turn-key Project - Focusing on Domestic Project -

건축턴키공사 초기 단계에서의 클레임 방지를 위한 클레임요인 분석 및 대응방안에 관한 연구 - 국내공사 사례중심으로 -

  • 윤준선 (강남대학교 도시건축공학부) ;
  • 유병억 (강남대학교 도시건축공학부)
  • Published : 2006.03.01

Abstract

In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Proposing the response devices to the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

Keywords

References

  1. 김문한외, 건설경영공학, 기문당, 2003.1
  2. 백준홍, 건설 계약관리와 클레임 해결, 연세대학교 출판부, 2001
  3. 대한건설협회, 건설산업 기본법령집 , 2000.1
  4. 대한상사중재원, 상거래 분쟁과 상사중재, 2000.2
  5. 김경래, 이태식, 이인근, "클레임 사례분석을 통한 설계시공 일괄 입찰공사 계약조건의 개선", 대한토목학회논문집 제19권 제1호, 1999.1
  6. 신규철, "협상을 감안한 건설분쟁해결제도의 발전방안", 한국건설관리학회, 2002.3
  7. Jeffrey S. Russell (1992), "Predicting Construction Contractor Failure Prior to Construct Award", ASCE
  8. Saied Kartam (1999), "Generic Methodology for Analyzing Delay Claims", ASCE