The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction

벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究)

  • Published : 2006.03.01

Abstract

Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

Keywords

References

  1. 김선국 외 5인, 작업일보 정보를 이용한 택트공정관리방안 연구, 한국건설관리학회논문집, 제4권, 제4호, 2003
  2. 김영재 외 5인, 건축공사 마감공기 단축을 위한 택트공정관리 프로세스 모델, 대한건축학회 논문집(구조계), 제19권, 제1호, 2003
  3. 서상욱 외 5인, TACT 공정관리 시스템 개발 및 적용 사례, 한국건설관리학회논문집, 제4권, 제4호, 2003
  4. 윤유상, 서상욱, 건축마감공사에서의 택트타임 설정을 통한 작업조정 프로세스 개발-오피스 건축물을 중심으로-, 한국건설관리학회논문집, 제6권, 제6호, 2005
  5. 윤유상 외 5인, 작업구역의 합리적 분할에 의한 건축 마감공사의 공정운영 개선, 한국건설관리학회논문집, 제4권, 제2호, 2003
  6. 정인환 외 4인 벽식 아파트 건축공사의 이면공정에 관한 연구, 대한건축학회논문집(구조계), 제13권, 제6호, 1997
  7. 홍영탁, 이현수, 공기영향요인을 이용한 초고층 공정계획 지원도구 개발, 대한건축학회 우수졸업논문전, 2005.4

Cited by

  1. TACT Productivity Management for Finish Works of Residential Buildings using Productivity Achievement Ratio (PAR) vol.16, pp.3, 2015, https://doi.org/10.6106/KJCEM.2015.16.3.036