참고문헌
- Ahmadi, R., U. Bagchi, and T. A. Roemer, 'Coordinated Scheduling of Customer Orders for Quick Response,' Working Paper, Anderson School of Management at UCLA, USA 2004
- Baker, K. R., 'Scheduling the Production of Components at a Common Facility,' lIE Transactions 20 (1988), 32-35 https://doi.org/10.1080/07408178808966147
- Blocher, J. D. and D. Chhajed, 'The Customer Order Lead Time Problem on Parallel Machines,' Naval Res. Logist. 43 (1996),629-654 https://doi.org/10.1002/(SICI)1520-6750(199608)43:5<629::AID-NAV3>3.0.CO;2-7
- Blocher, J. D., D. Chhajed, and M. Leung, 'Customer Order Scheduling in a General Job Shop Environment,' Decision Science 29 (1998), 951-981 https://doi.org/10.1111/j.1540-5915.1998.tb00883.x
- Coffman, E. G., A. Nozari, and M. Yannakakis, 'Optimal Scheduling of Products with Two Subassemblies on a Single Machine,' Operations Research 37 (1989),426-436 https://doi.org/10.1287/opre.37.3.426
- Ding, F. Y., 'A Pairwise Interchange Solution Procedure for a Scheduling Problem with Production of Components at a Single Facility,' Computers and Industrial Engineering 18 (1990),325-331 https://doi.org/10.1016/0360-8352(90)90054-P
- Gerodimos, A. E., C. A. Glass, and C. N. Potts, 'Scheduling the Production of Two-Component Jobs on a Single Machine,' European Journal of Operational Research 120 (2000), 250-259 https://doi.org/10.1016/S0377-2217(99)00154-X
- Graham, R. L., E. L. Lawler, J. K. Lenstra, and A .H. G. Rinnooy Kan, 'Optimization and Approximation in Deterministic Machine Scheduling: A Survey,' Annals of Discrete Mathematics 5 (1979), 287-326 https://doi.org/10.1016/S0167-5060(08)70356-X
- Gupta, J. N. D., J. C. Ho, and A. A. van der Veen, 'Single Machine Hierarchical Scheduling with Customer Orders and Multiple Job Classes,' Annal of Operations Research 70 (1997), 127-143 https://doi.org/10.1023/A:1018913902852
- Jordan, C., Batching and Scheduling: Models and Methods for Several Problem Classes, Springer, New York 1996
- Julien, F. M. and M. J. Magazine, 'Scheduling Customer Orders: An Alternative Production Scheduling Approach,' Journal of Manufacturing and Operations Management 3 (1990), 177-199
- Liao, C. J., 'Optimal Scheduling of Products with Common and Unique Components,' International Journal of Systems Science 27 (1996),361-366 https://doi.org/10.1080/00207729608929225
- Potts, C. N. and L. N. Van Wassenhove, 'Integrating Scheduling with Batching and Lot-sizing: a Review of Algorithm and Complexity,' Journal of Operational Research Society 43 (1992), 395-406 https://doi.org/10.2307/2583559
- Roemer, T. A., and R. Ahmadi, 'The Complexity of Scheduling Customer Orders,' Working Paper, Anderson School of Management at UCLA, USA 1997
- Santos, C. and M. Magazine, 'Batching in Single Operation Manufacturing Systems,' Operations Research Letters 4 (1985),99-103 https://doi.org/10.1016/0167-6377(85)90011-2
- Webster, C. and K. R. Baker, 'Scheduling Groups of Jobs on a Single Machine,' Operations Research 43 (1995),692-703 https://doi.org/10.1287/opre.43.4.692
- Yang, J. and M. E. Posner, 'Scheduling Parallel Machines for the Customer Order Problem,' Journal of Scheduling 8 (2005),49-74 https://doi.org/10.1007/s10951-005-5315-5
- Yang, J., 'Scheduling Parallel Machines for the Customer Order Problem with Fixed Bach Sequence,' Journal of the Korean Institute of Industrial Engineers 29 (2003) 304-311
- Yang, J., 'The Complexity of Customer Order Scheduling Problems on Parallel Machines,' Computers and Operations Research 32 (2005), 1921-1939 https://doi.org/10.1016/j.cor.2003.12.008
- Yoon, S. H., 'Fabrication Scheduling of Products with Common and Unique Components at a Single Facility,' Journal of the Korean Operations Research and Management Science Society 28 (2003), 105-114