References
- Bahl, H. C., L. P. Ritzman, and J. N. D. Gupta, 'Determining Lot Sizes and Resource Requirements: a Review,' Operations Research 35 (1987), 329-345 https://doi.org/10.1287/opre.35.3.329
- Brennan, L., S. M. Gupta, and K. N. Taleb, 'Operations Planning Issues in an Assembly/Disassembly Environment,' International Journal of Operations and Production Management 14 (1994), 57-67 https://doi.org/10.1108/01443579410066767
- Guide, Jr., V. D. R., 'Production Planning and Control for Remanufacturing: Industry Practice and Research Needs,' Journal of Operations Management 18 (2000), 467-483 https://doi.org/10.1016/S0272-6963(00)00034-6
- Gupta, S. M. and K. N. Taleb, 'Scheduling Disassembly,' International Journal of Production Research 32 (1994), 1857-1886 https://doi.org/10.1080/00207549408957046
- Johnson, M. R. and M. H. Wang, 'Economical Evaluation of Disassembly Operations for Recycling, Remanufacturing and Reuse,' International Journal of Production Research 36 (1998), 3227-3252 https://doi.org/10.1080/002075498192049
- Kang, J.-G., D.-H. Lee, P. Xirouchakis, and A. J. D. Lambert, 'Optimal Disassembly Sequencing with Sequence Dependent Operation Times based on the Directed Graph of Assembly States,' Journal of the Korean Institute of Industrial Engineers 28 (2002), 264-273
- Kim, H.-J., D.-H. Lee, P. Xirouchakis, and R. Zust, 'Disassembly Scheduling with Multiple Product Types,' CIRP Annals - Manufacturing Technology 52 (2003), 403-406 https://doi.org/10.1016/S0007-8506(07)60611-8
- Lambert, A. J. D., 'Optimal Disassembly of Complex Products,' International Journal of Production Research 35 (1997), 2509-2523 https://doi.org/10.1080/002075497194633
- Lee, D.-H., J.-G. Kang, and P. Xirouchakis, 'Disassembly Planning and Scheduling: Review and Further Research,' Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture 215 (2001), 695-710 https://doi.org/10.1243/0954405011518629
- Lee, D.-H., H.-J. Kim, G. Choi, and P. Xirouchakis, 'Disassembly Scheduling: Integer Programming Models,' Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture 218 (2004), 1357-1372 https://doi.org/10.1243/0954405042323586
- Lee, D.-H. and P. Xirouchakis, 'A Two-Stage Heuristic for Disassembly Scheduling with Assembly Product Structure,' Journal of the Operational Research Society 55 (2004), 287-297 https://doi.org/10.1057/palgrave.jors.2601690
- Lee, D.-H., P. Xirouchakis, and R. Zust, 'Disassembly Scheduling with Capacity Constraints,' CIRP Annals - Manufacturing Technology 51 (2002), 387-390 https://doi.org/10.1016/S0007-8506(07)61543-1
- Lund, R. T., 'Remanufacturing,' Technology Review 87 (1984), 18-28
- Neuendorf, K.-P., D.-H. Lee, D. Kiritsis, and P. Xirouchakis. 'Disassembly Scheduling with Parts Commonality using Petri-Nets with Timestamps,' Fundamenta Informaticae 47 (2001), 295-306
- O'Shea, B., S. S. Grewal, and H. Kaebernick, 'State of the Art Literature Survey on Disassembly Planning,' Concurrent Engineering: Research and Application 6 (1998), 345-357 https://doi.org/10.1177/1063293X9800600407
- Pnueli, Y. and E. Zussman, 'Evaluating the End-of-Life Value of a Product and Improving it by Redesign,' International Journal of Production Research 35 (1997), 921-942 https://doi.org/10.1080/002075497195452
- antochi, M., G. Dini, and F. Failli, 'Computer Aided Disassembly Planning: State of the Art and Perspectives,' CIRP Annals - Manufacturing Technology 51 (2002), 1-23 https://doi.org/10.1016/S0007-8506(07)61453-X
- Taleb, K. N. and S. M. Gupta, 'Disassembly of Multiple Product Structures,' Computers and Industrial Engineering 32 (1997), 949-961 https://doi.org/10.1016/S0360-8352(97)00023-5
- Taleb, K. N., S. M. Gupta, and L. Brennan, 'Disassembly of Complex Product Structures with Parts and Materials Commonality,' Production Planning and Control 8 (1997),255-269 https://doi.org/10.1080/095372897235316