Disassembly Scheduling for Products with Assembly Structure  

Lee Dong-Ho (Department of Industrial Engineering Hanyang University)
Publication Information
Management Science and Financial Engineering / v.11, no.1, 2005 , pp. 63-78 More about this Journal
Abstract
Disassembly scheduling is the problem of determining the ordering and disassembly schedules of used or end-of-life products while satisfying the demand of their parts or components over a certain planning horizon. This paper considers the case of the assembly product structure for the cost-based objective of minimizing the sum of purchase, setup, inventory holding, and disassembly operation costs. To represent and solve the problem optimally, this paper presents an integer programming model, which is a reversed form of the multi-level lot sizing formulation. Computational experiments on an example derived from the literature and a number of randomly generated test problems are done and the results are reported.
Keywords
Disassembly Scheduling; Cost-based Objective; Integer Program; Environmental Issues;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Guide, Jr., V. D. R., 'Production Planning and Control for Remanufacturing: Industry Practice and Research Needs,' Journal of Operations Management 18 (2000), 467-483   DOI   ScienceOn
2 Gupta, S. M. and K. N. Taleb, 'Scheduling Disassembly,' International Journal of Production Research 32 (1994), 1857-1886   DOI   ScienceOn
3 Kang, J.-G., D.-H. Lee, P. Xirouchakis, and A. J. D. Lambert, 'Optimal Disassembly Sequencing with Sequence Dependent Operation Times based on the Directed Graph of Assembly States,' Journal of the Korean Institute of Industrial Engineers 28 (2002), 264-273
4 Lambert, A. J. D., 'Optimal Disassembly of Complex Products,' International Journal of Production Research 35 (1997), 2509-2523   DOI   ScienceOn
5 Pnueli, Y. and E. Zussman, 'Evaluating the End-of-Life Value of a Product and Improving it by Redesign,' International Journal of Production Research 35 (1997), 921-942   DOI   ScienceOn
6 Lund, R. T., 'Remanufacturing,' Technology Review 87 (1984), 18-28
7 Johnson, M. R. and M. H. Wang, 'Economical Evaluation of Disassembly Operations for Recycling, Remanufacturing and Reuse,' International Journal of Production Research 36 (1998), 3227-3252   DOI   ScienceOn
8 Lee, D.-H., J.-G. Kang, and P. Xirouchakis, 'Disassembly Planning and Scheduling: Review and Further Research,' Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture 215 (2001), 695-710   DOI   ScienceOn
9 Brennan, L., S. M. Gupta, and K. N. Taleb, 'Operations Planning Issues in an Assembly/Disassembly Environment,' International Journal of Operations and Production Management 14 (1994), 57-67   DOI   ScienceOn
10 Lee, D.-H., H.-J. Kim, G. Choi, and P. Xirouchakis, 'Disassembly Scheduling: Integer Programming Models,' Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture 218 (2004), 1357-1372   DOI   ScienceOn
11 Neuendorf, K.-P., D.-H. Lee, D. Kiritsis, and P. Xirouchakis. 'Disassembly Scheduling with Parts Commonality using Petri-Nets with Timestamps,' Fundamenta Informaticae 47 (2001), 295-306
12 Taleb, K. N. and S. M. Gupta, 'Disassembly of Multiple Product Structures,' Computers and Industrial Engineering 32 (1997), 949-961   DOI   ScienceOn
13 antochi, M., G. Dini, and F. Failli, 'Computer Aided Disassembly Planning: State of the Art and Perspectives,' CIRP Annals - Manufacturing Technology 51 (2002), 1-23   DOI   ScienceOn
14 Taleb, K. N., S. M. Gupta, and L. Brennan, 'Disassembly of Complex Product Structures with Parts and Materials Commonality,' Production Planning and Control 8 (1997),255-269   DOI   ScienceOn
15 Lee, D.-H., P. Xirouchakis, and R. Zust, 'Disassembly Scheduling with Capacity Constraints,' CIRP Annals - Manufacturing Technology 51 (2002), 387-390   DOI   ScienceOn
16 O'Shea, B., S. S. Grewal, and H. Kaebernick, 'State of the Art Literature Survey on Disassembly Planning,' Concurrent Engineering: Research and Application 6 (1998), 345-357   DOI
17 Kim, H.-J., D.-H. Lee, P. Xirouchakis, and R. Zust, 'Disassembly Scheduling with Multiple Product Types,' CIRP Annals - Manufacturing Technology 52 (2003), 403-406   DOI   ScienceOn
18 Bahl, H. C., L. P. Ritzman, and J. N. D. Gupta, 'Determining Lot Sizes and Resource Requirements: a Review,' Operations Research 35 (1987), 329-345   DOI   ScienceOn
19 Lee, D.-H. and P. Xirouchakis, 'A Two-Stage Heuristic for Disassembly Scheduling with Assembly Product Structure,' Journal of the Operational Research Society 55 (2004), 287-297   DOI   ScienceOn