참고문헌
- Afentakis, P., B. Gavish, and U. S. Karmarkar, 'Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multi-Stage Assembly Systems', Management Science, Vol.30, pp.222-239, 1984 https://doi.org/10.1287/mnsc.30.2.222
- Baker, K. R., 'Lot-Sizing Procedures and a Standard Data Set: A Reconciliation of the Literature', Journal of Manufacturing and Operations Management, Vol.2, pp.199-221, 1989
- Bessler, S. A., and A. J. Veinott, 'Optimal Policy for a Multi-Echelon Inventory Model', Naval Research Logistics Quarterly, Vol.13, pp.389-490, 1966
- Blackburn, J. D., and R. A. Millen, ‘Improved Heuristic for Multi-Echelon Requirements Planning Systems’, Management Science, Vol.28, pp.44-56, 1982
- Clark, A. J. and H. Scarf, ‘Optimal Policies for a Multi-Echelon Inventory Problem’, Management Science, Vol.6, pp.475-490, 1960
- Diks, E. B., and A. G. De Kok, 'Optimal Control of a Divergent Multi-Echelon Inventory System' European Journal of Operational Research, Vol.111, pp.75-97, 1998
- Diks, E. B., and A. G. De Kok, ‘Computational Results for the Control of a Divergent N-Echelon Inventory System’, International Journal of Production Economics, Vol.59, pp.327-336, 1999
- Erenguc, S. S., N. C. Simpson, and A J Vakharia, 'Integrated Production/Distribution Planning in Supply Chains: An Invited Review', European Journal of Operational Research, Vol.115, pp.219-236, 1999 https://doi.org/10.1016/S0377-2217(98)90299-5
- Federgruen, A , 'Centralized Planning Models for Multi-Echelon Inventory Systems under Uncertainty, in S. C. Graves, A H. G. Rinnooy Kan, and P. H. Zipkin(Eds.)', Logistics of Production and Inventory, North-Holland, Amsterdam, pp.133-174, 1993
-
Silver, E. A., and H. C. Meal, 'A Heuristic for Selecting Lot Size Requirements for the Case of a Deterministic Time-Var
$\gamma$ ing Demand Rate and Discrete Opportunities for Replenishment', Production and Inventory Management, Vol.14, pp.64-74, 1973 - Verrijdt, J H. C. M., and A G. De Kok, ‘Distribution Planning for a Divergent N-Echelon Networks without Intermediate Stocks under Service Restrictions’, International Journal of Production Economics, Vol.38, pp.225-243, 1995
- Wagner, H. M., and T. M. Whitin, 'Dynamic Version of the Economic Lot Size Model', Management Science, Vol.5, pp.89-96, 1958 https://doi.org/10.1287/mnsc.5.1.89
- Zangwill, W. I, 'A Deterministic Multi-Period Production Scheduling Model with Backlogging', Management Science, Vol.13, pp.105-119, 1966 https://doi.org/10.1287/mnsc.13.1.105