초록
ln this paper, it was reported the developed results of the monitoring unit for 72.5kY GIS which it is one part of the monitoring system for the substation that Korea Railway Company is promoting. In order to monitor the operational status of GIS, four parameters were chosen: the number of times of the circuit breaker switching, tightness of the gas-sealed units (circuit breaker / disconnecting switch / earthing switch), the number of times of the lightning arrestor operating and the leakage current of the lighting arrester. We constructed the monitoring system that can be judged the operating condition of the GIS from the signal of the suitable sensor for the purpose. Therefore, it is possible to on line monitoring for the condition of the GlS without efforts of the Periodic inspection.