계획기간의 연동적 고려 경우의 추계적 생산계획

A Stochastic Production Planning Problem in Rolling Horizon Environment

  • Sung, C. S. (department of Industrial Engineering Korea Advanced Institute of Science and Technology) ;
  • Lee, Y. J. (department of Industrial Engineering Korea Advanced Institute of Science and Technology)
  • 발행 : 1989.12.01

초록

This paper considers single-product production and inventory management problem where cumulative demands up to each time period are mutually independent random variables(known) having continuous probability distributions and the associated cost-minimizing production schedule (when to produce and how much to produce) need be determined in rolling horizon environment. For the problem, both the production cost and the inventory holding and backlogging costs are included in the whole system cost. The probability distributions of these costs are expressed in terms of random demands, and utilized to exploit a solution procedure for a production schedule which minimizes the expected unit time system cost and also reduces the probability of rist that, for the first-period of each production cycle (rolling horizon), the cost of the "production" option will exceed that of the "non-production" one. Numerical examples are presented for the solution procedure illustration.cedure illustration.

키워드

참고문헌

  1. AIIE Transactions v.13 A Procedure for Production Lot Sizing with Probabilistic Dynamic Demand Askin,R.G.
  2. Decision Science v.8 An Experimental Study of the Effectiveness of Rolling Schedules in Production Planning Baker,K.R.
  3. AIIE Transactions v.10 A Methodology for Obtaining the Probability Density Function of the Present Worth of Probabilistic Cash Flow Profiles Barnes,J.W.;Zinn,C.D.;Eldred,B.D.
  4. International Journal of Production Research v.24 Rolling Horizon Production Planning for Probabilistic Time-Varying Demands Bookbinder,J.H.;H'ng,B.T.
  5. Decision Sciences v.14 Cost Increases Due to Demand Uncertainty in MRP Lot Sizing De Bodt,M.A.;Van Wassenhove,L.N.
  6. AIIE Transactions v.10 Inventory Control under a Probabilistic Time-Varying Demand Pattern Siver,E.A.
  7. Production and Inventory Management v.14 A Heuristic for Selecting Lot Size Quantities for the Case of a Deterministic Time-Varying Demand Rate and Discrete Opportunities for Replenishment Silver,E.A.;Meal,H.C.
  8. Decision Sciences v.18 Dynamic Lot Sizing for a Single-Facility Multi-Production Problem in a Rolling-Horizon Environment Sung,C.S.;Park,Y.S.
  9. Internationl Journal of Production Research v.22 Lot-Sizing under Uncertainty in a Rolling Schedule Environment Wemmerlov,U.;Whybark,D.C.