A Study on the Derivation of Key Management Elements by Defect Type in the Work Stage of Window Construction

창호공사 작업단계의 하자유형별 핵심관리요소도출에 관한 연구

  • Published : 2023.05.17

Abstract

As the number of defects in apartments has increased recently, lawsuits and disputes related to defects have also increased. As a result, the loss of time and money is enormous. Therefore, fundamental measures are needed to reduce the occurrence of defects. Therefore, the purpose of this study is to propose a plan to reduce defects, focusing on window construction. To this end, existing studies were reviewed, and data from domestic construction companies were collected and classified to organize the types of defects. Based on the classified data, eight types with a high incidence of window glass were analyzed according to the time of occurrence, and the cause and causal relationship of the defect were schematized. It aims to identify the degree of possibility of recurrence of defects for each of the eight defect types for experts and derive key management elements using the RII method. Therefore, the goal is to select key management elements of window construction that actively reflect the characteristics of the construction stage.

Keywords

Acknowledgement

이 논문은 2022년도 정부(과학기술정보통신부)의 재원으로 한국연구재단의 지원을 받아 수행된 연구임(No. NRF-2022R1F1A1069875).