한국건축시공학회:학술대회논문집 (Proceedings of the Korean Institute of Building Construction Conference)
- 한국건축시공학회 2021년도 봄 학술논문 발표대회
- /
- Pages.155-156
- /
- 2021
전문건설업체 측면에서 전문공종 시공업무 장애 요인에 관한 연구
A Study on the Obstacle Factors of Construction Works in terms of the Specialty Contractors
- 발행 : 2021.05.20
초록
Most of the construction works in domestic are not direct undertaking work, but by a contract method including subcontracting. Therefore, a general contractor for each project jointly carry out construction work with a specialty contractor for each engineering type. However, in terms of contract, this method is not a joint venture contract, but a subcontract. Accordingly, this system can cause various problems between the prime contractor and the subcontractor. Therefore, this study aims to extract and present the actual obstacle factors in terms of specialty contract company performing specialty construction work for construction project. The presented contents are expected to present the standard for the cooperation system that the prime contractor and the subcontractor can win-win.
키워드