Preliminary Study on Applying VE to Design Change
설계변경 시 VE 적용을 위한 예비연구
- Published : 2019.05.15
Abstract
Change requests occur persistently in the construction phase of a construction project. The law requires that the contract amount be adjusted in accordance with the relevant regulations when there is a change in the construction amount due to the design change in the construction contract. SAVE international, on the other hand, defines the value methodology as a systematic and structured approach to improving projects, products and processes. Design Changes in the construction projects require organizational efforts to improve value and quality. However, the law does not include change requests in which the VE object is fixed and related data is collected and function analysis can be derived in a short time. Therefore, it is necessary to apply VE to the design change procedure, which can further improve the value of construction work. The application derived from this study need to be presented as simply as possible without compromising the basic concept of VE. If the application is extended to the field and proved to be effective, it is expected to contribute to the overall value of construction work.
Keywords