Adjust timing of Construction Construction Evaluation

건설공사 시공평가 시기 조정

  • 윤지호 (제주대학교 일반대학원 건축공학과) ;
  • 남경우 (제주대학교 일반대학원 건축공학과) ;
  • 장명훈 (제주대학교 건축학부 건축공학전공)
  • Published : 2019.05.15

Abstract

A construction project with a total construction cost of over 10 billion KRW should be evaluated whether construction works are appropriately executed. The evaluation is carried out on quality management, process management, construction management, safety management, environmental management. The implementation period is within 60 days after completion of construction of the construction, from the time when the construction rate of the construction work has progressed by more than 90% to the construction cost. However, the participating construction engineers should prepare the evaluation within the period according to the evaluation criteria, but there are difficulties in preparation for the evaluation due to the reasons such as the change of engineers in charge and loss of data. Therefore, this study proposes the procedure of construction evaluation and adjusts timing of construction evaluation.

Keywords