Proceedings of the Korean Institute of Building Construction Conference (한국건축시공학회:학술대회논문집)
- 2014.11a
- /
- Pages.199-202
- /
- 2014
Downward Method of H-PILE Alternative Materials of Percusion Rotary Drill
PRD시공시 H-PILE 대체 자재로 원가절감 할수 있는 공법 사례
- Published : 2014.11.14
Abstract
In recent years the downtown, Top-down method has been applied in a major method to solve the complaints due to noise, vibration, dust and safety issues such as cracking due to settlement when the excavation close to the building. Until it is installed underground permanent foundation, the Pre-founded Column is a pile foundation as well as a column to bear the upper construction load. The Pre-founded Column is constructed by PRD method generally. The EnP(Enlarging Pile) method can be expanded locally boring diameter of the embedment zone as compared to the PRD method existing general. Since the bearing capacity is increased by the boring diameter is expanded, the embedment length is reduced, the construction cost is reduced.
Keywords