Technology Proposal for Curved Concrete Tracks Construction of 2018 Winter Olympic Sliding Center in Pyeongchang

평창 동계올림픽 슬라이딩센터의 곡면콘크리트 트랙 시공을 위한 기술제안

  • 박영미 (두산건설 기술연구소) ;
  • 김혜원 (두산건설 기술연구소) ;
  • 박기홍 (두산건설 기술연구소) ;
  • 조성준 (두산건설 기술연구소) ;
  • 김성진 ((주)디지털연구소 위드웍스 연구소)
  • Published : 2014.11.14

Abstract

For the curved concrete track construction of 2018 winter Olympic sliding center in Pyeongchang, in this study proposed the digital fabrication technology using CNC. This method can control the 3D geometries of the curved concrete structure based on the digital design. Conventional method generates the construction errors because this method fabricates many temporary zig bar using 1:1 full size drawing for install frozen pipes and sets up each zig bars at the construction site. Propose method is effective to ensure the precise fabrication and construction of zig bars. Also this method can eliminate errors of the frozen pipes position and curved concrete construction.

Keywords