Requirement Analysis for Development of EVMS in Nuclear Power Plant

원전건설 성과관리시스템(EVMS) 개발을 위한 요건 분석

  • 원서경 (한수원 중앙연구원, 플랜트건설기술연구소 건설기술그룹) ;
  • 박원섭 (한수원 중앙연구원, 플랜트건설기술연구소 건설기술그룹) ;
  • 정영환 (한수원 중앙연구원, 플랜트건설기술연구소 건설기술그룹) ;
  • 김재용 (공관프로테크 국방/공공사업부) ;
  • 김윤명 (한국전력기술 사업관리기술그룹)
  • Published : 2013.05.09

Abstract

The Korean nuclear industry acquired technology for each construction stage including engineering, procurement, construction and commissioning from advanced nuclear countries. While the levels of technology and quality have greatly improved, the same cannot be said for the level of project management. In particular, the level of project performance measurement and forecasting project risk still remain at the single project management level. Thus, this paper reviewed the concept of the EVMS method and requirement for the system. The adoption of the EVMS, an advanced project management method, can enable efficient management of project risks and promote an adequate environment for project implementation.

Keywords