Delay Factors Based on the Importance of Finish Work in Apartment Construction Project

공동주택 마감공사 중요도 기반 작업지연 요인 분석

  • 이승훈 (한양대학교 건축환경공학과) ;
  • 이상효 (한양대학교 건축환경공학과) ;
  • 김주형 (한양대학교 건축환경공학과) ;
  • 김재준 (한양대학교 건축환경공학과)
  • Published : 2010.05.14

Abstract

The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

Keywords