Proceedings of the SAREK Conference (대한설비공학회:학술대회논문집)
- 2009.06a
- /
- Pages.881-886
- /
- 2009
Bio Safety Level 3 Laboratory Construction Case
생물안전 3등급연구시설의 시공 사례
- Kim, Bong-Shin (Division of Building Works, Taeyoung E&C Corporation) ;
- Lim, Seon-Ho (Division of Building Works, Taeyoung E&C Corporation) ;
- Jung, Choong-Soo (Junglim Architecture Corporation)
- Published : 2009.06.25
Abstract
Bio safety level-3 laboratory is the research facility with concerns for the BL-3 contamination, at the same time the safety of it is guarantied. Based on comfortable environmental maintenance of the research laboratory, building, machinery, electricity, and controls are facilitated to keep airtightness(minus pressure) of each room in case of not only access and operation, but even emergency.