Pilot Test of Improving Super Retarding Concrete to Control of Hydration Heat Crack of Foundation Mat Mass Concrete

기초매트 매스 콘크리트의 수화열 균열제어로서 초지연 콘크리트 활용에 관한 예비실험

  • 노상균 (청주대학교 대학원) ;
  • 백대현 (청주대학교 대학원) ;
  • 이재삼 ((주)렉스콘 연구개발팀) ;
  • 김현섭 (두산건설(주) 해운대 두산 위브 더 제니스 현장) ;
  • 이병훈 (두산건설(주) 해운대 두산 위브 더 제니스 현장) ;
  • 한천구 (청주대학교 건축공학과)
  • Published : 2008.11.14

Abstract

According to the recent rapidly increasing that construction works are gradually Manhattanized mainly the grand scaled residential buildings, the foundation of the building that is related to safety is increasing for building as a grand scaled mat concrete. Because mat concrete can not be simultaneously placing of concrete in a great quantity due to the circumstance at the field, the inequal deformation of the tensile stress that according to the time lag of hydration heat between the upper layer and the lower layer is affecting as a cause that is the possibility of crack occurrence by increasing. Accordingly, this research checked the efficiency of super retard concrete in applying real structures, and we implemented the preparatory experiment to settle up the inequal deformation of the tensile stress substantially that is according to the time lag of placement between the upper layer and the lower layer by controlling the setting time using the super retarding agent. As the result of test, the more target of delay time lengthened, the more fluidity increased and air content indicated a little differences. There was from 2 to 10 hours between the standard curing and the outside curing at the setting time and in case of calculating the rate of mixing at real structure is required that mix promotion, increasing the amount of mixing, by setting up the curing temperature. The super retard concrete showed the result that in compressive strength, early-age strength was smaller than normal concrete whereas it was same or more figures from at the aging 28days because of the super retarding agent.

Keywords