The Study On The Pre-displacement Before Face Of The Shallow Tunnel In The Weathered Soil

풍화토구간을 통과하는 천층터널의 막장선행변위에 대한 연구

  • 강석기 (대림산업,(주) 지하철9호선 906공구) ;
  • 윤주상 (대림산업,(주) 지하철9호선 906공구)
  • Published : 2008.11.13

Abstract

Nowadays many urban subways are frequently constructed under the building and the river by the use of tunneling method. Especially, the majority of the tunnel are constructed even with shallow depth under the ground in the weathered soil. Since the tunnel are generally designed on the basis of the geographic soil investigation, the stability of the tunnel should be checked with the realistic data instrumented during construction. The displacement of the tunnel occurs in front of the end face during the excavation of the tunnel, which is called as pre-displacement. The total displacement can be figured from the exact pre-displacement, which is very difficult to measure without using any device installed in front of the tunnel end face. In this study, the pre-displacement measured from horizontal inclinometer was analyzed to know the co-relation with the total displacement and also, the trend and the characteristics of the tunnel deformation during construction was suggested through the regression analysis of the measured data.

Keywords