Analysis of optimized survey methods for tunnel construction using IT

터널 정보화 시공을 위한 계측 최적방안 분석

  • 최원일 (서울산업대학교 철도전문대학원 철도건설공학과, 한국철도시설공단) ;
  • 조국환 (서울산업대학교 철도전문대학원 철도건설공학과) ;
  • 박성욱 ((주) 넥스지오)
  • Published : 2008.11.13

Abstract

D&B method in tunnel construction requires accurate and rapid measurement of the ground movement, which of essential for feedback analysis. Recently, survey technique adapting IT is getting more and more emphasized in the field of construction and tunnel survey also follow the same trend. Case study and adaptability of IT technique for tunnel survey will be discussed in this study. The application of laserscannig method in the field of tunnel construction was reported in several advanced country including Austria and Japan. Survey for the crown and shoulder movements by IT survey method was conducted and the results were compared to those do the conventional method. The pipe-roof, grouting, ring-cut are installed in the this site to prevent expected large ground settlement. The result show that laserscanner system is prefered rather than conventional method in that better understanding for the displacement condition and origin condition was liable by the lasersacnnig method. IT survey solution makes if possible to execute more economic and safe construction.

Keywords