핵연료 노내조사시험설비의 시공 현황
The Construction Status of Fuel Test Loop Facility
- 박국남 (현대건설주식회사 원자력사업부) ;
- 이정영 (한국원자력연구원 하나로이용기술개발센터) ;
- 김학노 (한국원자력연구원 하나로이용기술개발센터) ;
- 유현재 (현대건설주식회사 원자력사업부) ;
- 유성연 (충남대학교 기계설계공학과)
- Park, Kook-Nam (Division of Nuclear Business, HYUNDAE Engineering & Construction Co. LTD.) ;
- Lee, Chung-Young (HANARO Utilization Technology Development Center, Korea Atomic Energy Research Institute) ;
- Kim, Hark-Rho (HANARO Utilization Technology Development Center, Korea Atomic Energy Research Institute) ;
- Yoo, Hyun-Jae (Division of Nuclear Business, HYUNDAE Engineering & Construction Co. LTD.) ;
- Yoo, Seong-Yeon (Department of Mechanical Design Engineering, ChungNam National University)
- 발행 : 2007.11.30
초록
FTL(Fuel Test Loop) is a facility that confirms performance of nuclear fuel at a similar irradiation condition with that of nuclear power plant. FTL construction work began on August, 2006 and ended on March, 2007. During Construction, ensuring the worker's safety was the top priority and installation of the FTL without hampering the integrity of the HANARO was the next one. The installation works were done successfully overcoming the difficulties such as on the limited space, on the radiation hazard inside the reactor pool, and finally on the shortening of the shut down period of the HANARO. The Commissioning of the FTL is to check the function and the performance of the equipment and the overall system as well. The FTL shall start operation with high burn up test fuels in early 2008 if the commissioning and licensing progress on schedule.