초고층 건물의 구조체 공사의 작업계획방법에 관한연구

A Study on the Work-Planning Method of High-rise Building

  • 김대길 (동의대학교 건축시공대학원) ;
  • 황재우 (동의대학교 건축시공대학원) ;
  • 정호근 (동의대학교 건축시공대학원) ;
  • 김주환 (동의대학교 산업대학원) ;
  • 이상범 (동의대학교 건축공학과)
  • 발행 : 2006.05.01

초록

Recently, Society increasingly need the hish-rise building because of urban population concentration. and The hish-rise building need new systematic work-planning method. but it didn't use the construction project's work plan and management. his paper investigated efficient work-planning method. and the work-planning method in using domestic High-rise building's structure work. A investigated result is TACT, DOC LOB etc. and domestic using method is 3day and 4day-Cycle among the Tact. This paper is to compare and analysis two method. a purpose of paper is to analyse application through the case of using the work-planning method. also To find efficient method.

키워드