Proceedings of the KIEE Conference (대한전기학회:학술대회논문집)
- 2006.07a
- /
- Pages.40-41
- /
- 2006
Basic Design for the 500kV Transmission System In Myanmar
미얀마 500kV 송전망 기본설계
- Baek, S.D. (Korea Electric Power Corporation) ;
- Kim, J.H. (Korea Electric Power Corporation) ;
- Choi, Y.S. (Korea Electric Power Corporation) ;
- Han, S.M. (Korea Electric Power Corporation)
- Published : 2006.07.12
Abstract
KEPCO conducted the project called the "Feasibility Study & Basic Designs for the 500kV Transmission System in Myanmar" as its second overseas project following the "Development Study on the Power System Network Analysis in Myanmar" as it first project. This paper deals with the design processes and results of 423 kilometers of the 500kV single circuit transmission lines and three substations. The main contents of the basic design include insulation design, transmission line design and substation design.
Keywords